• 제목/요약/키워드: standard of construction estimate

검색결과 176건 처리시간 0.031초

VE 대상선정을 위한 평가기준 중요도 산정방법 개선에 관한 연구 (A Study on the Improvement of Estimation Method of an Appraisal Standard to Select of the Subject in VE.)

  • 권병석;이동준;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.291-294
    • /
    • 2001
  • This study has established an appraisal standard to select VE subject when they evaluate of design VE by using of a qualify model in an early design step and has suggested an improvement method for importance's estimation method of an appraisal standard. An importance's estimation method is to arrangement of geometric average method using an AHP method to this study, When an evaluation of a quality model, we estimate an importance by establishing of an appraisal standard of economics, construction, security, environmental influence, maintenance, etc.

  • PDF

터널발파시 실제 작업시간과 품셈의 비교 분석 (A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting)

  • 김양균;김형목
    • 화약ㆍ발파
    • /
    • 제33권3호
    • /
    • pp.14-20
    • /
    • 2015
  • 발파터널의 건설과정에 있어서 가장 중요한 역할을 차지하는 발파작업은 암질상태, 터널의 규모, 사용 장비의 성능, 작업자들의 숙련도 등 다양한 요인에 의해 작업시간에서 차이를 나타낸다. 본 논문에서는 국내 세 곳의 터널발파 현장에서의 발파작업시간 조사를 통해, 표준품셈에서 계산되는 터널발파 사이클 시간과 실제 시공시간과의 차이를 분석하였다. 그 결과, 정상적인 작업이 이루어진 경우 전체적으로 실제 발파작업시간은 품셈보다 약 8%~ 16% 적게 나타나고 있다. 그러나 예상치 못한 상황으로 인해 지연되는 시간까지 포함한다면 실제 작업시간이 품셈을 초과하는 경우가 상당할 것으로 추정되었다. 본 연구는 향후에도 지속적인 작업시간 조사와 품셈과의 비교 분석을 통해 품셈의 적절성을 판단함과 아울러, 발파 굴착의 생산성을 향상시키는데 도움을 주고자 한다.

건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로 (Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System)

  • 지세현;박문서;이현수;윤유상
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.170-181
    • /
    • 2008
  • 건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.

공정-원가 통합관리를 위한 진도관리 개선 방안 (A Study on the Improvement of Construction Progress Management for EVMS)

  • 이규현;박찬정;최인성
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

자연환경복원산업 활성화를 위한 표준품셈 연구 (A Study on the Standard of Estimate for Vitalizing the Natural Environment Restoration Industry)

  • 진기정;구본학
    • 한국환경복원기술학회지
    • /
    • 제16권2호
    • /
    • pp.23-40
    • /
    • 2013
  • The natural environment restoration industry has been newly included in the environment area of engineering technology. Accordingly, the enactment of a standard of estimate for determining the 'Cost plus Fixed Fee' method has become necessary for the implementation and vitalization of natural environment restoration projects. The purpose of this study is to determine the standards for which the prices for engineering projects are calculated with respect to the enactment of an engineering project standard of estimate in the natural environment restoration field. These include the scope of the technological work, standard area, manpower requirements by technical grade that are necessary for carrying out the technological tasks. Relevant laws and regulations, systems and precedent case studies were investigated and analyzed to establish a price calculation standard. The overall results of the analysis were used and applied to questionnaires, public hearings, and expert delphi techniques. The study showed the following results: The scope of the technological work was categorized into 'Biotopes', 'Eco-corridors' and 'Ecological restoration'. The standard area was set up as $1,000m^2$ for 'Biotopes' and $5,000m^2$ for 'Eco-corridors' and 'Ecological restoration'. The manpower requirements by technical grade that are necessary for carrying out the technological tasks were determined. The suitability of the costs, standard area, manpower requirements by technical grade of ordered engineering projects that are determined by applying the standard of estimate for natural environment restoration that may be enacted pursuant to this study may be effectively investigated and analyzed. Moreover, further studies on the calculation of standard prices that can ensure the stability of natural environment restoration projects will be necessary.

누수보수용 주입형 실링재의 시공 기준에 관한 실험적 연구 (An Experimental study on the Construction Standard for Sealer of Injection Type for Leakage Maintenance)

  • 임민찬;조일규;선윤숙;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.51-54
    • /
    • 2005
  • The concrete structure hasn't perfect waterproofing performance but if it doesn't have a joint part that could isolate a permeability. Concrete structure(communication tunnel and underground structure) has an expansion joint and construction joint. There are a lot of joint type after construction or expansion, shrinkage, vibration, over load, performance of decline etc.. they offer a water of way by variety change. In this reason, It carries in effect a waterproofing work for the concrete structure of waterproofing. but the structure has a behavior that cause a problem by waterproofing layer of damage, heaving phenomenon, temperature of shrinkage. In this study, we will estimate a field of application for Sealer of injection type for leakage maintenance of construction standard on the waterproofing performance.

  • PDF

문화재 수리의 조경분야 공종 분류에 관한 연구 (A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry)

  • 김민선;이재용;김충식
    • 한국전통조경학회지
    • /
    • 제40권2호
    • /
    • pp.59-66
    • /
    • 2022
  • 본 연구는 문화재 수리에서 조경분야의 독자성을 확보하고 업역을 정립하기 위한 기준이 되는 조경수리 공종 분류 제시를 목적으로 하였다. 연구 결과는 다음과 같다. 현재 문화재수리 표준시방서는 식재공사 중심으로 조경수리 공종을 명시하였고 품셈은 조경분야를 포함하지 않고 있다. 다만 건설산업의 조경공사 시방서와 품셈을 준용하도록 하여 문화재 수리에서 조경수리 공종이 구체적으로 무엇인지 알기 어려운 실정이다. 따라서 실제 시행된 문화재수리 사업의 내용을 토대로 조경수리 공종을 파악하였다. 과거 1961년부터 1980년에는 수목식재뿐만 아니라 다양한 조경시설도 조경수리로 명시되었고 이 공종들 모두 현재 건설산업의 조경공사 공종으로도 정립되었음을 확인하였다. 또한, 2018년부터 2020년의 3년간 문화재를 대상으로 한 실시설계용역 입찰공고서에 명시된 공종 중 건축물보수 및 단청, 식물보호, 보존처리 분야 공종을 제외하고 종합한 결과 총 20개의 공종이 확인되었다. 20개 공종 모두 건설산업의 조경공사 공종에 해당하였다. 따라서 조경수리 공종은 건설산업 조경공사 공종 분류를 토대로 하되 문화재 공간의 특수성을 고려하여 부지조성 및 대지조형, 식재공사, 시설물공사, 포장공사, 생태조경공사, 식생유지관리의 총 6개로 분류하였다. 국내 산업의 한 분야로 조경이 정착해가던 시기에 이미 다양한 조경시설도 건축분야 수리가 아닌 조경수리로 시행되었으므로 이 시설을 모두 포함하여 조경수리 공종이 문화재 시방서에 구체적으로 명시되어야 할 것이다.

The Way of Improving the Working Environment for Female Workers on Construction Site Based on Construction Welfare Facilities

  • Pak, Sungsine;Shin, Chang-Keun;Lee, Sang-Hak
    • Architectural research
    • /
    • 제22권2호
    • /
    • pp.63-73
    • /
    • 2020
  • This paper reports problems of current working environment on construction site in South Korea from a female laborers' point of view and proposes solutions to improve the environment. To investigate and analyze the problems, a questionnaire survey and a focus group interview were conducted with 341 engineers and 557 laborers. Among them female engineers and female laborers were 51 and 136 respectively. Findings are the facilities related with welfare facilities such as lavatories, shower rooms, lounges and changing room, etc. for women were not sufficient and even not installed only for women because all of the planners for the facilities were men and The Standard of Estimate does not consider gender distinction. The data on the trade and the number of female laborers were not recorded and this study confirmed the number and the proportion of female laborers according to construction progress i.e. the proportion of female laborers were 0% ~ 11% (average 6%) at 26 construction sites having 2% ~ 92 % construction progress. In order to solve these problems, gender education for the welfare facility planner is required and the current Standard of Estimate should be revised considering female laborers after collecting the site data for the number of female laborers according progress and the increase in the construction cost should be reflected in the contract amount accordingly. Conclusively temporary work planning related with welfare facilities should be established and conducted in terms of gender equality at construction sites. In addition, improving working environment on construction sites for female laborers will enhance the company's image and also helping solve the labor shortage problem by women laborers engaging in construction industry easily.

시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발 (An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1)

  • 안방률;태용호;김대영;허영기
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.397-404
    • /
    • 2015
  • 국내 공공건설사업의 건설기계경비 손료 선정 시 사용되는 건설기계가격표는 급변하는 현실을 제대로 반영하지 못하고 있다. 본 연구에서는 현실이 반영된 기계경비 산정을 위해 "기계장비 시가표준액표"를 활용하여 표준품셈의 건설기계가격이 지속적으로 제 개정될 수 있는 체계화되고 선진화된 상시관리시스템의 방안을 개발하여 제시하고, 대표적인 장비에 이를 적용하여 건설기계가격의 변화가 정부예산에 미치는 영향을 분석하였다. 본 연구의 결과는 투명하고 공정한 공사비 산정기준을 정립하는 데 도움이 될 것으로 기대한다.