International conference on construction engineering and project management
/
2007.03a
/
pp.662-671
/
2007
Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.
Proceedings of the Korean Institute of Building Construction Conference
/
2014.11a
/
pp.218-219
/
2014
The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.390-395
/
2006
Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods (i..e, CM, DB, etc.). However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough project characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the model for selecting criteria of delivery method based on project characteristics in the Multi-housing projects.
Journal of the Korea Institute of Building Construction
/
v.9
no.5
/
pp.111-117
/
2009
With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.
On the situation cooperating with business partners on the supply chain, systematic decision making process is a critical issue for them. The two major issues of purchasing strategy such as selecting vendors and managing them are important part of their overall business activities. This study mainly focus on the former issue of the vendor selection. Through the empirical study, analytical hierarchy process (AHP) method was applied to select vendors among supplier vendors based on four selection criteria such as the level of quality, product on management ability, delivery, and price. The results of study showed the main criteria of vender selection was the ability of quality management. The vender selected based on AHP and the current selection method was different, but implicitly projected the dilemma situation between quality and price which occurs in decision making process of real life.
On the situation cooperating with business partners on the supply chain, systematic decision making process is a critical issue for them. The two major issues of purchasing strategy such as selecting vendors and managing them are important part of their overall business activities. This study mainly focus on the former issue of the vendor selection. Through the empirical study, analytical hierarchy process (AHP) method was applied to select vendors among supplier vendors based on four selection criteria such as the level of quality, product on management ability, delivery, and price. The results of study showed the main criteria of vender selection was the ability of quality management. The vender selected based on AHP and the current selection method was different, but implicitly projected the dilemma situation between quality and price which occurs in decision making process of real life.
Journal of Korean Society of Industrial and Systems Engineering
/
v.32
no.3
/
pp.142-158
/
2009
The supplier selection problem is perhaps the most important component of the purchasing function. Some of the common and influential criteria in the selection of a supplier include quality, price, delivery, and service. These evaluation criteria often conflict, however, and it is frequently impossible to find a supplier that excels in all areas. In addition, some of the criteria are quantitative and some are qualitative. Thus, a methodology is needed that can capture both subjective and objective evaluation measures. The Analytic Hierarchy Process(AHP) is a decision-making method for ranking alternative courses of action when multiple criteria must be considered. This paper proposes the AHP-based approach which can structure the supplier selection process and the achievements-based procedure which can allocate order quantities for the selected suppliers In automotive part manufacturers. Also, through the practical case of 'D' automotive part manufacturing company, we shows that the proposed AHP based supplier selection approach and the achievements-based allocation procedure of order quantity can be successfully applied for supplier selection and order quantity allocation problems.
Purpose: This study was to examine the degree of prenatal emotional status, preparation for delivery, postpartum social support, and postpartum blues and to investigate the relationship of the above variables in postpartum women. Method: The subjects were 131 postpartum women. Selection criteria were women who were 2 to 8 weeks post delivery. After Informed consent was obtained, they were asked to fill out a self-administered questionnaire. The instrument was a Postnatal Depression & Anxiety check list. Result: The mean age of the subjects was 29.3 years, and 63.4% of subjects delivered their children by vaginal birth. 18.3 percent had felt depressed during their pregnancy. The mean score of the postpartum blues was 19.2. 61.8 percent of the subjects had postpartum blues and 8.4 percent experienced postpartum depression. Monthly income was negatively correlated to postpartum blues (r=-.189, p<.05), but the emotional status during pregnancy had a significant and positive relationship. However, preparation for delivery had no significant correlation with postpartum blues. While husband support and social support had a tendency to have a negative correlation. Conclusion: Further research is needed to identify the factors that affect the emotional status during pregnancy with various scales. Also, intervention programs to increase emotional support for pregnancy and husband support are needed.
The importance of logistics of warehouse stores has increased as their prices are cheaper and more convenient than those of large supermarkets. However, few studies on integrated depot location selection of warehouse stores have been conducted. In this regard, this study aims to derive factors for integrated depot location selection and calculate weights and select the location priority of target candidates by introducing an analytic hierarchy process (AHP). The analysis results exhibited that the most important selection factor was the cost reduction in transportation and delivery (0.198) followed by distance reduction in transportation and delivery (0.168), and time reduction in transportation. This study quantified the reduction in cost and increase in efficiency if depots were integrated and operated thereby presenting more realistic foundational data to hands-on workers. For the future study, the analysis model will be needed to be advanced through additional investigation on the factors in the analysis.
Journal of Korean Society of Industrial and Systems Engineering
/
v.40
no.2
/
pp.51-59
/
2017
Due to the rapid change of global business environment, the growth of China's steel industry and the inflow of cheap products, domestic steel industry is faced on downward trend. The change of business paradigms from a quantitative growth to a qualitative product is needed in this steel industry. In this environment, it is very important for domestic steel distribution companies to secure their competitiveness by selecting good supply companies through a efficient procurement strategy and effective method. This study tried to find out the success factors of steel distribution industry based on survey research from experts. Weighted values of each factors were found by using AHP (analytic hierarchy process) analysis. The weighted values were applied to DEA(data envelopment analysis) model and eventually the best steel supply company were selected. This paper used 29 domestic steel distribution firms for case example and 5 steps of decision process to select good vendors were suggested. This study used quality, price, delivery and finance as a selection criteria. Using this four criterions, nine variable were suggested. Which were product diversity, base price, discount, payment position, average delivery date, urgency order responsibility and financial condition. These variables were used as a output variable of DEA. Sales and facilities were used as an input variable. Pairwise comparison was conducted using these variables. The weighted value calculated by AHP pairwise comparison were used for DEA analysis. Through the analysis of DEA efficiency process, good DMU (decision making unit) were recommended as a steel supply company. The domestic case example was used to show the effectiveness of this study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.