• Title/Summary/Keyword: schedule delay

Search Result 220, Processing Time 0.023 seconds

A Measuring Model of Risk Impact on The App Development Project in The Social App Manufacturing Environment (Social App Manufacturing 환경의 앱 개발 프로젝트에서 위험영향도 측정 모델)

  • Baek, Jung Hee;Lim, Young Hwan
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.9
    • /
    • pp.335-340
    • /
    • 2014
  • Crowd Sourcing-based Social App Manufacturing environment, a small app development project by a team of anonymous virtual performed without the constraints of time and space, and manage it for the app development process need to be automated method. Virtual teams with anonymity is a feature of the Social App Manufacturing, is an important factor that increases the uncertainty of whether the completion of the project or reduction in visibility of the progress of the project. In this study, as one of how to manage the project of Social App Manufacturing environment, the impact of risk that can be used to quantitatively measure the impact of the risk of delay in development has on the project also proposes a measurement model. Effects of risk and type of the impact of risks associated with delays in the work schedule also define the characteristic function, measurement model that has been proposed, suggest the degree of influence measurement equation of risk of the project in accordance with the progressive. The advantage of this model, the project manager is able to ensure the visibility of the progress of the project. In addition, identify the project risk of work delays, and to take precautions.

Runtime Prediction Based on Workload-Aware Clustering (병렬 프로그램 로그 군집화 기반 작업 실행 시간 예측모형 연구)

  • Kim, Eunhye;Park, Ju-Won
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.56-63
    • /
    • 2015
  • Several fields of science have demanded large-scale workflow support, which requires thousands of CPU cores or more. In order to support such large-scale scientific workflows, high capacity parallel systems such as supercomputers are widely used. In order to increase the utilization of these systems, most schedulers use backfilling policy: Small jobs are moved ahead to fill in holes in the schedule when large jobs do not delay. Since an estimate of the runtime is necessary for backfilling, most parallel systems use user's estimated runtime. However, it is found to be extremely inaccurate because users overestimate their jobs. Therefore, in this paper, we propose a novel system for the runtime prediction based on workload-aware clustering with the goal of improving prediction performance. The proposed method for runtime prediction of parallel applications consists of three main phases. First, a feature selection based on factor analysis is performed to identify important input features. Then, it performs a clustering analysis of history data based on self-organizing map which is followed by hierarchical clustering for finding the clustering boundaries from the weight vectors. Finally, prediction models are constructed using support vector regression with the clustered workload data. Multiple prediction models for each clustered data pattern can reduce the error rate compared with a single model for the whole data pattern. In the experiments, we use workload logs on parallel systems (i.e., iPSC, LANL-CM5, SDSC-Par95, SDSC-Par96, and CTC-SP2) to evaluate the effectiveness of our approach. Comparing with other techniques, experimental results show that the proposed method improves the accuracy up to 69.08%.

A study of the train traffic optimal control system in a circular metro line (도시형 순환 열차에서 운전 최적제어 시스템에 관한 연구)

  • Hong, Hyo-Sik;Ryu, Kwang-Gyun;Song, Noon-Suck
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.236-246
    • /
    • 2003
  • This paper is implemented a control algorithm in order to be stable and minimized to entire train traffic system at delayed case. Signal ing system is described wi th algebraic equations given for train headway, Discrete-event simulation principles are reviewed and a demonstration block signaling model using the technique is implemented. Train congestion at station entrance for short headway operation is demonstrated and the propagation of delays along a platform of trains from any imposed delay to the leading train is also shown. A rail way signaling system is by nature a distributed operation with event triggered at discrete intervals. Although the train kinematic variables of position, velocity, and acceleration are continually changing, the changes are triggered when the trains pass over section boundaries and arrive at signals and route switches. This paper deals with linear-mode1ing, stability and optimal control for the traffic on such metro line of the model is reconstructed in order to adapt the circuits. This paper propose optimal control laws wi th state feedback ensuring the stability of the modeled system for circuits. Simulation results show the benefit to be expected from an efficient traffic control. The main results are summarized as follows: 1. In this paper we develop a linear model describing the traffic for both loop lines, two state space equations have been analyzed. The first one is adapted to the situation where a complete nominal time schedule is available while second one is adapted when only the nominal time interval between trains is known, in both cases we show the unstability of the traffic when the proceeding train is delayed following properties, - They are easily implemented at law cost on existing lines. - They ensure the exponetial stability of loop system. 2. These control laws have been tested on a traffic simulation software taking into the non-linearites and the physical constraints on a metro line. By means of simulation, the efficiency of the proposed optimal control laws are shown.

  • PDF

A Study on the Additional Train Scheduling Method (열차 증편방법에 관한 연구)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.313-319
    • /
    • 2014
  • Additional train scheduling is often required to increase the capacity of transporting passengers or freight. In most previous studies on scheduling additional trains, operation time of the added train is designated first; and then the train operation feasibility is examined. However, it is often difficult to apply this approach to domestic trains because the density of the railroad network in Korea is high and various types of trains are in use. Moreover, for freight trains, it is even more challenging because the delay is accumulated due to lower priority whenever a freight train and a passenger train contend for a common segment of rail. In this paper, we address the additional train scheduling problem which entails finding a feasible schedule for an additional train having a fixed departure time or departure time windows. The problem is modeled as a mixed integer programming and a column generation technique is used to solve it.

Clinical Application of the Korean Personality Rating Scale for Children in Attention-Deficit Hyperactivity Disorder (주의력결핍 과잉행동장애에서 한국아동 인성평정척도의 임상적 적용)

  • Yoon, Woon;Park, Kee-Jeong;Kweon, Kukju;Kim, Hyo-Won
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.26 no.3
    • /
    • pp.217-225
    • /
    • 2015
  • Objectives : The objective of this study was to compare the Korean Personality Rating Scale for Children (K-PRC) profile between children with attention-deficit hyperactivity disorder (ADHD) and typically developing children. We also aimed to investigate the association of K-PRC and ADHD symptoms. Methods : Ninety-nine youth (age $8.3{\pm}2.4$ years, 72 boys) with ADHD and 84 controls (age $9.2{\pm}2.5$ years, 43 boys) were recruited from the Department of Pediatric Psychiatry of the Asan Medical Center Children's Hospital. Diagnoses of ADHD and comorbid psychiatric disorders were confirmed with the Kiddie-Schedule for Affective Disorders and Schizophrenia-Present and Lifetime Version (K-SADS-PL). The parents of the subjects completed the ADHD rating scale, and K-PRC. Independent t-tests, analysis of covariance, partial correlation analyses, and Mc Nemar test were used for analysis. Results : Children and adolescents with ADHD showed higher K-PRC scores in verbal development, physical development, depression, delinquency, hyperactivity, family dysfunction and psychoticism. Delinquency and hyperactivity were significantly correlated with parent-rated ADHD rating scales and ADHD scores on K-SADS-PL. The hyperactive/impulsive and combined subtypes showed higher scores on hyperactivity and delinquency than the inattentive subtype, and the inattentive subtype showed higher scores on depression and social dysfunction of the K-PRC. Conclusion : Our results suggest that K-PRC could be used to comprehensively evaluate symptoms, combined psychopathologies, developmental delay and family dysfunction of children with ADHD.

Autism Spectrum Disorder Diagnosis in Diagnostic and Statistical Manual of Mental Disorders-5 Compared to Diagnostic and Statistical Manual of Mental Disorders-IV

  • Lim, Yun Shin;Park, Kee Jeong;Kim, Hyo-Won
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.29 no.4
    • /
    • pp.178-184
    • /
    • 2018
  • Objectives: The objective of this study was to investigate the concordance of Diagnostic and Statistical Manual of Mental Disorders (DSM-IV and DSM-5) diagnostic criteria for autism spectrum disorder (ASD). Methods: We retrospectively reviewed the medical records of 170 subjects (age range: 3-23, 140 boys) with developmental delay or social deficit from January 2011 to July 2016 at the Department of Psychiatry of Asan Medical Center. The Autism Diagnostic Interview-Revised (ADI-R), the Autism Diagnostic Observation Schedule (ADOS), and intelligence tests were performed for each subject. Diagnosis was reviewed and confirmed for each subject with DSM-IV Pervasive Developmental Disorder (PDD) and DSM-5 ASD criteria, respectively. Results: Fifty-eight of 145 subjects (34.1%) who were previously diagnosed as having PDD in DSM-IV did not meet DSM-5 ASD criteria. Among them, 28 (48.3%) had Asperger's disorder based on DSM-IV. Most algorithm scores on ADOS and all algorithm scores on ADI-R were highest in subjects who met both DSM-IV PDD criteria and DSM-5 ASD criteria (the Convergent group), followed by subjects with a DSM-IV PDD diagnosis who did not have a DSM-5 ASD diagnosis (the Divergent group), and subjects who did not meet either DSM-IV PDD or DSM-5 ASD criteria (the non-PDD group). Intelligence quotient was lower in the Convergent group than in the Divergent group. Conclusion: The results of our study suggest that ASD prevalence estimates could be lower under DSM-5 than DSM-IV diagnostic criteria. Further prospective study on the impact of new DSM-5 ASD diagnoses in Koreans with ASD is needed.

A Study on the Industrial Condition, the Legal and Administrative Problems of Data Broadcasting Services (국내 데이터방송서비스 산업현황 분석 및 법적.제도적 쟁점에 관한 연구)

  • Kim, Kwan-Kyu;Lee, Si-Hoon
    • Korean journal of communication and information
    • /
    • v.21
    • /
    • pp.35-62
    • /
    • 2003
  • This study is conducted to achieve following two purposes. First, this study investigates domestic conditions and problems of data broadcasting industry. Second, this study suggests the improving way of the legal and administrative systems in order to promote domestic data broadcasting industry. Survey was conducted with 16 companies and a few business men for gaining data of general condition and analyzing problems about domestic data broadcasting industry. The results are as follow: first, domestic industry was suffering from the lack of man power, finance, and the delay of data broadcasting service schedule. Second, respondents argued there was no the legal basis and the systematic regulation under the current digital broadcasting policy of government. To resolve those problems, this paper proposed the making laws preparing for the fusion service of communication and broadcasting, systematic assistance of government, the way of technology development and technical standardization, and the way of constructing infrastructure and cultivating man power.

  • PDF

CPM Bar Chart Technique for Construction Scheduling (CPM Bar Chart 기법을 활용한 일정계획)

  • Kim Kyung-Hwan;Kim Soo-Yoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.135-142
    • /
    • 2004
  • This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical pad method (CPM). The CBC overcomes shortages of the fenced bar chart, while still keeping advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network. the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants. With the advantages, the CBC can also be effectively applied to various scheduling techniques such as resource constrained scheduling, resource leveling, scheduling with activity split, delay impact analysis, etc.

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.