• Title/Summary/Keyword: saving building cost

Search Result 192, Processing Time 0.028 seconds

Analysis of Economic Effectiveness in the Results of Construction R&D (건설R&D성과의 경제적 파급효과 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.71-81
    • /
    • 2010
  • In 1994, Korean construction research and development (R&D) projects received investments amounting to 1.2 billion KRW, an amount that rose to 164.8 billion KRW in 2007. Under the current system, construction researchers submit the application records of Construction Research and Development (R&D) in construction projects to the Korea Institute of Construction & Transportation Technology Evaluation and Planning. The performance of Construction R&D projects has thus been dependent on the subjective reporting of the results by the researchers themselves. For this reason, it is difficult to secure confidence in the records of Construction Research and Development. Therefore, this research suggested measures for revitalizing Construction Research and Development, analyzed approaches to cost-saving in Construction Research and Development, and analyzed economic effectiveness in the results of construction R&D.

Development of low-cost, low-depth unit-type ground heat exchanger (저심도 저비용 유닛형 지중열교환기의 개발)

  • Oh, Jin-Hwan;Nam, Yujin;Chae, Ho-Byung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.166-167
    • /
    • 2014
  • Recently, in according to increase cognizance of energy and resources exhaustion, renewable energy system is received attention. In particular, ground heat pump system(GSHP) utilizing annually stable ground temperature for energy saving have been attracted in many buildings. However, GSHP system have disadvantage due to increase of initial installation and boring cost. In this study, in order to reduce the initial cost and to supply ground heat pump system into small scale house, an unit-type ground heat exchanger was developed.

  • PDF

Energy Saving Effect and Economy Feasibility of Office Building with regard to Geometries and Orientations

  • Koh, Jae-Yoon;Zhai, John
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.17 no.1
    • /
    • pp.15-24
    • /
    • 2009
  • The energy usage and the economical feasibility of the typical two story office building in the three urban locations of South Korea are evaluated as the eight orientations. The smallest energy consume is shown at the true south. The ranges of the low energy consume are $-3l5^{\circ}{\sim}0^{\circ}\;and\;-135^{\circ}{\sim}-180^{\circ}$. There are obvious advantages of passive solar designs such as using a fully glazed facade at the true south in the building. The General Low voltage plan is the effective way for the office building when does not required the high voltage electricity. The energy cost of KEPCO is compared to that of XCEL ENERGY. The portion of the customer charge of XCEL ENERGY is about 10% but it is about 50% of the total tariff of KEPCO. The effective way to save the energy cost is by reducing the operating energy of XCEL ENERGY plane but the most effective way is reduce the contracting energy of KEPCO plane.

Design of a Remote Lighting Control System Using Time Division Multiplex Transmission (시분할 다중 전송방식을 이용한 원격 조명제어 설계)

  • 정성재;김일환
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.33-33
    • /
    • 2000
  • In this paper a new distributive control system for BA(Building Automation ) lighting control used on general microprocessors is presented. For optimal lighting control and saving energy, The system have to control the group and pattern lighting control as well as individual light control at one time. Tn this paper, This functions are accomplished with low-cost and simple microprocessor. A plurality of modulated light control terminals are connected to the central control unit through a pair of power line. This power line provide both power and signal to the each terminal and the data is transmitted through cyclic time division multiplex transmission. With this structure a low-cost distributive control system for lighting applications has been achieved, allowing energy and maintenance saving and reliability increase of the light control system.

  • PDF

Study on the Application of Tuned Pendulum Slab Damper system (TPSD) to Building structure (진자슬래브에 의한 진동제어시스템의 적용성 평가)

  • Kim, Yang-Jung;Seo, Gun-Bae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.181-184
    • /
    • 2012
  • The Tuned Pendulum Slab Damper(TPSD)system is mainly composed of suspended pendulum slab which was hanging with cable wire from the top floor of building without any extra loads structurally, and can be helpful to reduce vibration with effect of tuned mass damper function by the principle of pendulum movement. The experiment was performed with miniatures of the 30stories of steel structure building by the forced vibration test using shaking table, and the result was reduced about 42% of vibration. The purpose of this study was to make analysis of application of the TPSD system to new building and exist building against strong wind or seismic wave. The result of this study was that the TPSD system shall be satisfactory in field of execution, process control, safety and economical efficiency with saving up to 70% of construction cost.

  • PDF

A Study on the Optimization Method of Building Envelope using Non-linear Programming (비선형계획법을 이용한 건물의 외피최적화 방법)

  • Won, Jong-Seo;Lee, Kyung-Hoi
    • KIEAE Journal
    • /
    • v.3 no.2
    • /
    • pp.17-24
    • /
    • 2003
  • The purpose of this study is to present rational methods of multi-criteria optimization of the envelope of buildings. The object is to determine the optimum R-value of the envelope of a building, based on the following criteria: minimum building costs (including the cost of materials and construction) and yearly heating costs. Mathematical model described heat losses and gains in a building during the heating season. It takes into consideration heat losses through wall, roof, floor and windows. Particular attention was paid to have a more detailed description of heat gains due to solar radiation. On the assumption that shape of building is rectangle in order to solve the problem, optimum R-value of the envelope of a building is determined by using non-linear programing methods(Kuhn-Tucker Conditions). The results constitute information for designers on the optimum R-value of a building envelope for energy saving buildings.

A Construction of the N-BMS Focused on the Building Service Equipment (N-BMS : National Building Management System) (건물 군관리시스템 구축방안)

  • Lee, Tae-Won;Kim, Yong-Ki;Kang, Sung-Ju
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.149-154
    • /
    • 2007
  • Now, in Korea, the performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. As the result, very different quality of the performance or the durability of equipment is being obtained with his skill and effort and it is also not easy to assess that quality. This finally lead to the waste of labor force and the operating cost due to the high-cost, low-efficiency system. How to construct the N-BMS was considered to save energy, resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF

Study on construction method of horizontal ground heat pump system using the building structure (건물구조체를 이용한 수평형 지열시스템의 시공법에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.139-140
    • /
    • 2013
  • Ground source heat pump systems can achieve the energy saving of building and reduce CO2 emission by utilizing stable ground temperature. However, they have many barriers such as high cost of installation, incompletion of design tool, lack of recognition as heating and cooling systems. In order to solve the problems, the building integrated geothermal system (BIGS) developed by several researches which use building foundation as a heat exchanger. In order to establish the optimum design tool of BIGS with the horizontal heat exchanger, the prediction method of ground heat exchange rate developed with numerical simulation model. In this study, the economic analysis for BIGS was conducted based on simulation results and the optimal design method was suggested. As a result, it was found that the case of 32 A, piping space 0.3 m, piping deep 0.5 m and flow rate 9.52 L/min was the best case as 50.1 W/m2 of heat exchange rate. In this case the initial cost was reduced to 115 million won.

  • PDF

Experimental Study of In-situ Production of Precast Concrete Members

  • Lim, Jeeyoung;Son, Seunghyun;Kim, Jeong Tai;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.263-270
    • /
    • 2017
  • The precast concrete (PC) structure has been preferred for reasons of shortening the construction time and securing the quality and, in particular, it has a cost saving effect in case of long span and heavy loaded structure with high floor height. Most engineers take it for granted to install the plant produced PC members. Researchers in several papers have argued that slander PC members such as columns and girders can be cost-effective if in-situ production is possible, while ensuring quality equal to or better than in-plant production. However, this argument is not officially accepted because objective verification has not been done. Therefore, the purpose of this study is to experimentally conduct in-situ production of PC members to verify the above claim. For this study, a storage building with long span and heavy loaded structure with high floor height was selected as a case study site. For the site, most of the PC members were supplied from the plant, and some of the columns were produced in the site for this study. As a result, it has been confirmed that it has a cost saving effect of 20% while having superior quality to plant-produced PC columns.

  • PDF

A Study on the Effective M&V Method for the Lighting Control System (조명제어시스템을 위한 효율적인 계측 및 검증(M&V) 기법 연구)

  • Kim, Jeong-Uk;Boo, Chang-Jin;Kim, Jeong-Hyuk;Oh, Seong-Bo;Kim, Ho-Chan
    • Journal of Energy Engineering
    • /
    • v.20 no.3
    • /
    • pp.216-223
    • /
    • 2011
  • This paper presents an effective energy saving algorithm for lighting control systems using M&V method in various buildings and factories. It is important to aggregate a various demand side resource which is controllable at the peak power time to reduce the energy cost. Previous demand side algorithm appropriate for building is based on peak power. In this paper, we develop the new energy saving algorithm using M&V method to reduce the quantity of power consumption. The simulation results show that the proposed method is very effective.