• 제목/요약/키워드: safety assessment system

검색결과 1,730건 처리시간 0.036초

지하공간의 피난안전성평가시스템 개발에 관한 연구 (A Study on the Development of Evacuation Safety Assessment System on Underground Space)

  • 김진수;박종근;노삼규
    • 한국화재소방학회논문지
    • /
    • 제17권4호
    • /
    • pp.57-63
    • /
    • 2003
  • 본 연구에서는 지하가의 피난 안전성 평가 모델의 기반을 제시하고 그에 따른 프로그램을 개발하였다. 또한, 피난 안전성 평가에 필수적인 각종 자료들을 통합형 데이터베이스 기반으로 구축하여 적은 시간과 인력으로 효율적인 피난 안전성 평가를 수행할 수 있는 모델 제시 및 시스템을 구축하였고, 국내 지하가의 사례연구를 토대로 피난안전성평가시스템의 현장 적용성 및 신뢰성을 검증하였다.

화학물질관리법상의 유해화학물질 안전관리 개선방안 연구 : 안전성평가 사례 중심 (Development on the Safety Management System of Hazardous Chemicals under the Chemicals Control Act: Focusing on Safety Assessment System)

  • 유병태;이은별;김종구
    • 한국안전학회지
    • /
    • 제34권3호
    • /
    • pp.96-101
    • /
    • 2019
  • Chemicals Control Act have been strengthened to control more safely hazardous chemicals from 2015. In particular, the standards for the installation and management of handling facilities was enhanced with specific regulations depending on type of the facilities and the hazardous chemicals. However, some standards for handling facilities caused difficulties in implementing the strengthened standards due to various field conditions, such as lack of physical space. The Ministry of Environment is implementing Safety Assessment System (SAS) to solve these problems since 2018. However, many plants have difficulties in preparing alternative methods to pass the safety evaluation. The purpose of this study was to review and analyze the SAS and to suggest alternative measures in terms of management and technical aspects through the case study of hydrochloric acid storage tanks. The following safety solutions were suggested for handling facilities that had insufficient the space and capacity for the retaining wall due to physical space. Firstly, insufficient space was resolved by introducing equipment relocation or demolition, and retaining wall expansion. Secondly, the wall of the surrounding buildings was used as an alternative to the retaining wall with additional chemical resistant treatment. Finally, sensor installation and facility inspection were suggested as ways to improve chemical safety. Therefore, improvement of chemical accident prevention system is required not only in terms of facilities supplementation but also management aspect. The results of this study are expected to be available for similar facilities and will be based on the preparation of additional safety assessment as alternatives measures in the future.

도시철도차량 적용을 위한 위험도 매트릭스 개발에 관한 연구 (The Study of Risk Matrix Development for Urban Metro EMU)

  • 김영상
    • 한국안전학회지
    • /
    • 제26권6호
    • /
    • pp.111-117
    • /
    • 2011
  • Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.

NOR-STA 도구를 활용한 체계적 철도시스템 독립안전성 평가 방안 (A Systematic Method for Independent Safety Assessment of Railway System by Applying NOR-STA Tool)

  • 엄정규;박범;김영민
    • 시스템엔지니어링학술지
    • /
    • 제19권1호
    • /
    • pp.29-38
    • /
    • 2023
  • Independent Safety Assessment (ISA) is a third-party assessment that is to confirm that the system satisfies the safety requirements in the defined operational context. The process of this assessment often brings about many complex arguments that should be supported by evidence and justification. The communication between arguments and evidence is of the most importance in the context of safety case. This study illustrates how NOR-STA can be used for ISA process, showing the effective structure of safety compliance. The study outlines the steps to breaks down the top goal into many elements such as arguments, sub-goals, justification, context and assumptions. It concludes that the evidence-based safety conformance process utilizing NOR-STA provides a more effective and systematic representation of the independent safety assessment process in conformance cases.

위험관리시스템 구축을 위한 정량적 안전평가 절차 (Procedure of Quantitative Safety Assessment for Risk Management System)

  • 정원
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제9권3호
    • /
    • pp.165-176
    • /
    • 2009
  • The risk management case is an organization's formal arrangement to ensure the safety of its work activity within risk management system. It allows an organization to demonstrate its capability in achieving its safety objectives and in meeting regulatory requirements. This paper presents how the safety assessments are described, prepared and maintained to meet the criteria specified by the upcoming safety regulations. We propose the elements of risk management system that include arrangements for the ongoing identification of hazards, assessment of risks and the implementation of necessary control measures.

  • PDF

화학사고 장외영향평가 제도의 종합위험도 결정 체계 개선을 위한 고찰 (Discussion for Improvement of Decision System of Total Risk in Off-site Risk Assessment)

  • 최우수;류태권;곽솔림;임형준;정진희;이지은;김정곤;백종배;윤준헌;류지성
    • 한국환경보건학회지
    • /
    • 제44권3호
    • /
    • pp.217-226
    • /
    • 2018
  • Objectives: Despite the positive effects of Off-site risk assessment (ORA) system such as prevention of chemical accidents, some problems have been constantly raised. The purpose of this study is to analyze the problems that have occurred through the implementation of the ORA system for the past three years and to suggest reasonable directions for improvement in the future. Methods: In order to identify the problems with the methodology and procedure of ORA system, we analyzed statutes, administrative rules and documents related to the ORA system. A survey of ORA reviewers in National Institute of Chemical Safety was conducted to investigate the weight of determinants considered when judging the level of total risk in ORA. Results: In this study, we found out the uncertainty of the estimation of the number of people in the impact range in the procedure of the risk assessment of individual handling facilities, the lack of quantitative risk analysis methods for environmental receptors, and the ambiguity of the criteria for the total risk. In addition to suggesting solutions to the problems mentioned above, we also, suggested a decision tree for total risk in ORA. Conclusion: We anticipate that the solutions including the systematic decision tree for total risk suggested will contribute to the smooth operation of the ORA system.

IEC 규격에 기반한 도시형자기부상열차 열차제어시스템의 시스템보증 및 안전성 평가 활동 (System Assurance and Safety Assessment Activities of Urban Marglev ATC Project based on IEC Standards)

  • 백영구;박희준;구중서;서도석;이기서
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1669-1679
    • /
    • 2010
  • Related to the on-going "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train", activities by each phase shall be conducted to achieve SIL4 level and obtain safety certification from the Independent Safety Assessment(ISA), based on the IEC standards((IEC 62278/62279 and IEC 62425) for the first time in Korea. This thesis describes the introduction of IEC standards, system assurance activities (such as plan, analysis, test, verification and validation) in compliance with requirements management and project life-cycle and relations with the safety assessment activities; and certification activities (such as document reviews and audits) through system RAMS activities, software quality assurance activities and safety assessment, for the purpose of achieving a successful safety certification at the time of completing the project as system assurance activities including software and safety certification activities in order to acquire the safety certification for train control system which does not exist at all in domestic cases. It is believed that overall system safety assurance activities in this project will contribute to develop more upgraded products of the domestic train control system on the quality and safety point of view, find overseas markets and establish a bridgehead in the future.

  • PDF

단위공정 작업자에 대한 안전관리 평가적용 사례연구 (A case study of safety management assessment application by unit process worker)

  • 이강복;김건호;강경식
    • 대한안전경영과학회지
    • /
    • 제9권3호
    • /
    • pp.9-14
    • /
    • 2007
  • A studies wish to present safety assessment table that is consisted of safety check-up, safety education, safety management for worker's safety management assessment about unit process. And safety management level was survey through case study that use safety assessment table. Safety management assessment table is improved safety management level of unit process, and is developed safety management system by worker confirms assessment items and improves problem.

우리나라의 사업장 위험성평가 제도 실시에 관한 연구 (A Study on the Implementation of Risk Assessment System at Workplace in Korea)

  • 정진우
    • 한국안전학회지
    • /
    • 제29권3호
    • /
    • pp.121-128
    • /
    • 2014
  • Risk assessment system which is the point of occupational safety and health management system is recognized to be effective to prevent industrial accident and occupational disease internationally. Ministry of Employment and Labor developed guidance on risk assessment at workplace recently. This guidance presents standard model on risk assessment at workplace. However, enterprises may be confronted with many questions in the process of introducing and operating risk assessment. For risk assessment to be implemented properly and effectively at workplace, there are various questions that need to be considered in advance, including giving shape to standard on risk evaluation and clarifying the implementation system at workplace in advance. Also for risk assessment to be revitalized at workplace, several policy matters need to be settled. First, an administrative agency should present the implementation method of risk assessment more concretely. Secondly, it is necessary for an administrative agency to develop and spread various detailed manual, models and good practices related to risk assessment. Thirdly, a government agency need to apply an incentive & disadvantage policy actively to risk assessment.

건설업체 자율안전관리 능력제고 방안 (Improving Self-control Safety & Management Ability of Construction Contractors)

  • 이송;손기상;최원일;오태상;채점식
    • 한국안전학회지
    • /
    • 제15권4호
    • /
    • pp.112-118
    • /
    • 2000
  • This paper is resulted from the research to activate Self-control Safety Management system that adopted to improve an assessment system for Hazard Prevention Plan. And members of company, university and research institute have jointly participated in the research. First, it is investigated that introduced background and processing method with existing practical data & materials references in order to understand what domestic Self-control Safety Management system will be available for. And general construction company at site have their ability to assess Hazard Prevention Plan by mailing questionnaire to on thousand site, visits, and interviews. Also, It is investigated how much they have the assessment ability. It is selected to do a questionnaire survey for the status of self-regulatory safety assessment ability of the designated self-regulatory companies in order to produce and enhance the self-regulatory assessment ability and the necessity of Self-control Safety Management system. Finally, it is selected to do a questionnaire survey for fixing and the enhance Self-control Safety Management system of general construction contractors.

  • PDF