• Title/Summary/Keyword: rubble leveling

Search Result 6, Processing Time 0.019 seconds

Investigation on Construction Process and Efficiency of Underwater Construction Equipment for Rubble Mound Leveling works (수중 고르기 장비의 건설 공정 및 효율성 분석)

  • Won, Deokhee;Jang, In-Sung;Shin, Changjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.372-378
    • /
    • 2016
  • A mound was constructed to install a caisson and sofa blocks underwater. The mound riprap, which were of uniform grade, size, shape, and specific gravity, formed the foundation for the support superstructure. Also, rubble leveling works were performed before installing structures such as caissons. In this study, underwater construction equipment was developed with a remotely controlled operating system and underwater environment monitoring system for unmanned underwater rubble leveling work. The performance of the developed equipment was verified using on-land and underwater tests. In addition to the performance verification, the construction process and economic efficiency of the equipment should be checked before applying it to the real construction field for commercial purposes. In this paper, a construction process using the developed equipment was proposed and compared with the existing rubble leveling method. The results demonstrated that the new construction method has higher economic efficiency and safety than the existing construction method.

Study on the Control and Topographical Recognition of an Underwater Rubble Leveling Robot for Port Construction (항만공사용 사석 고르기 수중로봇의 제어 및 지형인식에 관한 연구)

  • Kim, Tae-Sung;Kim, Chi-Hyo;Lee, Jin-Hyung;Lee, Min-Ki
    • Journal of Navigation and Port Research
    • /
    • v.42 no.3
    • /
    • pp.237-244
    • /
    • 2018
  • When underwater rubble leveling work is carried out by a robot, real-time information on the topography around the robot is required for remote control. If the topographical information with respect to the current position of the robot is displayed as a 3D graphic image, it allows the operator to plan the working schedules and to avoid accidents like rollovers. Up until now, the topographical recognition was conducted by multi-beam sonars, which were only used to assess the quality before and after the work and could not be used to provide real-time information for remote control. This research measures the force delivered to the bucket which presses the mound to determine whether contact is made or not, and the contact position is calculated by reading the cylinder length. A variable bang-bang control algorithm is applied to control the heavy robot arms for the positioning of the bucket. The proposed method allows operators to easily recognize the terrain and intuitively plan the working schedules by showing relatively 3-D gratifications with respect to the robot body. In addition, the operating patterns of a skilled operator are programmed for raking, pushing, moving, and measuring so that they are automatically applied to the underwater rubble leveling work of the robot.

Study on the design and the control of an underwater construction robot for port construction (항만공사용 수중건설로봇의 기구설계 및 제어에 관한 연구)

  • Kim, Tae-Sung;Kim, Chi-Hyo;Lee, Min-Ki
    • Journal of Navigation and Port Research
    • /
    • v.39 no.3
    • /
    • pp.253-260
    • /
    • 2015
  • There are many efforts to mechanize the process for underwater port construction due to the severe and adverse working environment. This paper presents an underwater construction robot to level rubbles on the seabed for port construction. The robot is composed of a blade and a multi-functional arm to flatten the rubble mound with respect to the reference level at uneven terrain and to dig and dump the rubbles. This research analyzes the kinematics of the blade and the multi-functional arm including track and swing motions with respect to a world coordinate assigned to a reference depth sensor. This analysis is conducted interfacing with the position and orientation sensors installed at the robot. A hydraulic control system is developed to control a track, a blade and a multi-functional arm for rubble leveling work. The experimental results of rubble leveling work conducted by the robot are presented in land and subsea. The working speed of the robot is eight times faster than that of a human diver, and the working quality is acceptable. The robot is expected to have much higher efficiency in deep water where a human diver is unable to work.

Turbidity Characteristics of Korean Port Area (국내 주요 항만 인근의 탁도 특성 분석)

  • Jang, In-Sung;Won, Deokhee;Baek, Wondae;Shin, Changjoo;Lee, Seung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8889-8895
    • /
    • 2015
  • It is necessary to secure the underwater visibility in order to perform underwater works such as rubble mound leveling or inspection and management of underwater structures. In this study, turbidity data for typical port area in Korea were measured and analyzed according to the region. Underwater monitoring system including underwater camera and sonar system, which can be effectively attached to underwater equipment for various turbidity conditions, was also investigated.

Sonar System Application for detection of underwater work space boundary using seabed type underwater equipments (착저형 수중장비를 이용한 수중작업 시 작업경계면 인식을 위한 소나시스템 활용법)

  • Shin, Changjoo;Jang, In-Sung;Won, Deokhee;Seo, Jung-min;Baek, Won-Dae;Kim, Kihun;KIM, JONG HOON
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.678-684
    • /
    • 2016
  • The detection of an underwater work space boundary is very important when an underwater construction is carried out using seabed type underwater equipment, such as underwater machines for rubble mound leveling, because it can induce industrial disasters. Therefore, divers are needed to mark the underwater work space boundary. A nylon rope is used to improve the convenience during an underwater diver's work. The results showed that the work space boundary can be detected using a sonar system. Using these results, an efficient method to detect the underwater work space boundary can be obtained when an underwater construction is carried out using seabed type underwater equipment.

A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification (조경공사 표준품셈 공종 개정에 관한 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.119-126
    • /
    • 2011
  • The standard unit manpower and material in landscape architectural construction was consist of a standard and universal work classification. However, these constructional methods have created a number of problems in utilizing and responding on a variety of recently-developed working methods such as new constructional skills and technologies. This research decided that presenting the amendments of work classification of a standard unit manpower and material in landscape architectural construction was very important, and investigated those work classifications which required these new amendments. First of all, assessment items were selected through the literature reviews and a preliminary survey. Then, these assessment items were surveyed to the total of 60 professional landscape architecture field. The results of this study were as follows; First, the utilization level of the a standard unit manpower and material in landscape architectural construction was highest in the area of work classification of planting unit manpower and material. Second, the work classifications that needed to be added were recognized as leveling the ground construction, landscape structure construction, paving construction, water facilities construction, and outdoor facilities construction. Third, in the field of the a standard unit manpower and material in landscape architectural construction, 66.7% of the respondents replied that some amendments were necessary, and those amendments needed work classifications were identified as work classification of planting unit manpower and material was gigantic plant, topiary tree, temporary planting, exchange dead tree, etc. In the area of digging out was gigantic plant and plastic tree were recognized. The survey respondents also answered that, in keeping and management work classifications some amendments in pruning waste were necessary, and in the fields of rubble masonry work classifications some improvements were required in rubble aperture planting unit manpower and material and sodding and herbaceous sowing was a realistic lawn size unit manpower and material was needed. Based on the results explained above, this study suggests that amendments for a standard unit manpower and material in landscape architectural construction are necessary, especially in the areas of planting size and quality of work classifications unit manpower and material and in the unit manpower and material that affects the quality of lands caping constructions.