International conference on construction engineering and project management
/
2009.05a
/
pp.1201-1208
/
2009
A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.
Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.
Kim, Gil Ho;Sun, Seung Pyo;Yeo, Kyu Dong;Kim, Hung Soo
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.1B
/
pp.41-51
/
2012
Sometimes, there exist many alternatives for doing a SOC project. However, the limitation of the fund requires the determination of investment priority for the alternatives. This may be performed according to the degree of importance of individual alternatives. Especially, the river improvement project at the downstream of dams has complex and various values and this characteristics make it difficult decision-maker to do reasonable determination. This study aims to determine an investment priority of 33 alternatives in the river improvement project at the downstream of dams using PROMETHEE method which has advantages in determining the priority. In this study, we determined evaluation criteria and attributes by considering the functions and objectives of the river improvement project at the downstream of dams. The eigenvector method in AHP was used to estimate the relative importance of evaluation criterion. Based on the estimation, we determined investment priority of 33 alternatives by PROMETHEE method and the priority of alternatives was derived in the order of Juam regulation dam, Unmun dam, Yongdam dam and so on. The results of this study could provide a reasonable standard to the decision-maker for the determination of investment priority of alternatives.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.22-30
/
2007
Nihonbashi River takes more time to discharge water pollution because it runs low-lying areas and is easy to affect tidal flow from downstream. After rainfall, the water environment of the river has become worse. Even though the river is located in the important metropolitan area in Tokyo, it dose not have any connection with people's lives. We took Nihonbashi River as an example to consider methods for river restoration of improving water quality and river environment in densely inhabited urban areas. Especially, the major issue of river restoration is how smoothly and quickly discharges water pollution which flows into with river flow. The conclusion of this project is the effectiveness of improvement of water environment to construct of rock gates in Nihonbashi River and Kanda River to control inflows from upstream and tidal flows from downstream.
Journal of the Korean Society of Environmental Restoration Technology
/
v.10
no.1
/
pp.1-8
/
2007
The Anyang River which located in an urban area near Seoul had been managed focusing on supplying home and industrial water and preventing floods, coping with rapid industrialization and urbanization. Consequently, it was changed into a deadly river during 25 years. Its channel was straightened by concrete and water quality deteriorated to BOD 190mg/l. In addition, water quantity has been rapidly decreased and has been drying up. Also, as the river ecosystem, landscape, water-friendly function, and so forth were seriously deteriorated, people turn away from the urban river. From 2001, the master plan under the 10-year has been actively carried out centering on the preceding items, which are healthy river in which fishes inhabit, safe river free from floods and droughts, and pleasant river where citizens visit. As a result, its water quality was remarkably improved by BOD 5mg/l in 2005 and some upper zones were improved enough to allow people to swim. Moreover, various animals including fish and birds gather around the river. Now, the 'Anyang River Restoration Project' is recognized as the first comprehensive and systematic nature-friendly urban river improvement in Korea.
With characteristics of river continuum, stream ecosystems have diverse components and environments from upstream channel to estuarine area. Therefore, the habitat requirements and composition of conservative object should be well understood before applying any improvement measure. In this paper, the causes of stream habitat changes were first illustrated with the categories and principles of habitat restoration methods. The structural restoration techniques of fish habitat improvement utilized by the authors or one three-year research project starting at 1990 were then presented. Through the introductions on the project background, planning guidelines, structure design, and ecological evaluation, this paper tried to provide some effective examples of stream restoration practices that ecological expert was invited for cooperation and advising.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.9-18
/
2008
The fundamental objects of the Korean Grand Canal (KGC) Project are the rehabilitation(or restoration) of river corridor ecology, improvement of river water quality, reduction of flood damages, countermeasure of the huge rise in energy price and the high discharge of $CO_2$ due to the vast use of energy for highway logistics. The other important objects, like an increase of water in the river channel, are to provide people with the pleasure of seeing the water and intimacy (touchiness) with it, an increase of flood controllability, effects of dilution of river pollutants, dredging out sedimentary pollutant from the river bottom, the function of infrastructure to pare down the logistics (distribution) costs, and the opportunity to expand tourism. These kinds of fundamental concepts must be evaluated as future values in Korea and elsewhere.
BACKGROUND: Recently, the project for improvement of water quality and preservation of the Yeongsan and Seomjin river basin was actively promoted. However, the publicity for many results of the project is not actively done, thus they are rarely used. Furthermore, there are not sufficient information about the projects preformed by other research institutions. Therefore, the watershed management system for efficient water management is needed in the Yeongsan and Seomjin river basin. CONCLUSION: Firstly, establishment of the Yeongsan and Seomjin river basin management research center, Secondly, construciton of wed-based water management research network. These results will serve as a basic data for efficient water management.
Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
Journal of the Korea Academia-Industrial cooperation Society
/
v.22
no.1
/
pp.188-196
/
2021
Korea has invested heavily in projects related to national rivers, but there is no evaluation technique and system to manage river projects that can evaluate the effectiveness of the river projects after they are completed. Their absence leads to the inability of information on river construction sections, analysis of project effects, and benchmarking between projects. This may cause over-budget, overlapping investment problems due to the implementation of similar projects in the same section, and incorrect business elements may be repeatedly utilized. In order to solve this shortcoming, this study developed river project evaluation techniques and a river project (construction) management system. The development of evaluation techniques enables comparison and analysis between projects and can be utilized in establishing maintenance plans. The system can also provide inquiry of construction information, visualization of construction, and management of performance items. In this study, the evaluation techniques developed through prior research were modified and supplemented, and the effectiveness was verified by applying them to national river projects in A river and B river. It is expected that the evaluation techniques and system utilization measures presented will increase the work efficiency of river projects and enhance the efficiency of river projects.
Journal of the Korean Professional Engineers Association
/
v.15
no.1
/
pp.46-50
/
1982
Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.