• Title/Summary/Keyword: resource-based cost

Search Result 641, Processing Time 0.029 seconds

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project (원전건설 물량데이터를 활용한 사업비관리 방안)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF

Generation of Pareto Sets based on Resource Reduction for Multi-Objective Problems Involving Project Scheduling and Resource Leveling (프로젝트 일정과 자원 평준화를 포함한 다목적 최적화 문제에서 순차적 자원 감소에 기반한 파레토 집합의 생성)

  • Jeong, Woo-Jin;Park, Sung-Chul;Yim, Dong-Soon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.2
    • /
    • pp.79-86
    • /
    • 2020
  • To make a satisfactory decision regarding project scheduling, a trade-off between the resource-related cost and project duration must be considered. A beneficial method for decision makers is to provide a number of alternative schedules of diverse project duration with minimum resource cost. In view of optimization, the alternative schedules are Pareto sets under multi-objective of project duration and resource cost. Assuming that resource cost is closely related to resource leveling, a heuristic algorithm for resource capacity reduction (HRCR) is developed in this study in order to generate the Pareto sets efficiently. The heuristic is based on the fact that resource leveling can be improved by systematically reducing the resource capacity. Once the reduced resource capacity is given, a schedule with minimum project duration can be obtained by solving a resource-constrained project scheduling problem. In HRCR, VNS (Variable Neighborhood Search) is implemented to solve the resource-constrained project scheduling problem. Extensive experiments to evaluate the HRCR performance are accomplished with standard benchmarking data sets, PSPLIB. Considering 5 resource leveling objective functions, it is shown that HRCR outperforms well-known multi-objective optimization algorithm, SPEA2 (Strength Pareto Evolutionary Algorithm-2), in generating dominant Pareto sets. The number of approximate Pareto optimal also can be extended by modifying weight parameter to reduce resource capacity in HRCR.

Estimation of Nursing Cost for Hemodialysis Using RBRVS(Resource Based Relative Value Scale);Moderately Intensive Patient (상대가치를 이용한 혈액투석실 간호수가 산정;중등도 대상자를 중심으로)

  • Kim, Moon-Sil;Moon, Sun-Young;Kim, Jung-A;Shim, Ok-Su;Kim, Ji-Hyun
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.9 no.2
    • /
    • pp.205-216
    • /
    • 2003
  • Purpose : This study wad aimed to estimate nursing cost for hemodialysis of secondary hospitals using Resource Based Relative Value Scale(RVRBS). Method : The first, calculated nursing workload for the hemodialysis of secondary hospitals. Second, measured each spent time according to 14 nursing behaviors. Third, computed Resource Based Relative Value(RBRV) scores and nursing expenses of hemodialysis nurse. Finally, estimated nursing cost for hemodialysis of secondary hospitals, Result & Conclusion : The mean RBRV scores for each nursing behaviors were from 218.9 to 383.9 point(mean=312.7). The high RBRV socres were 383.9(Complication during hemodialysis), 353.7(Access patient vascular), 345.7 (Patient Teaching). Nursing cost for hemodialysis was estimated 23,234(won).

  • PDF

A Reinforcement learning-based for Multi-user Task Offloading and Resource Allocation in MEC

  • Xiang, Tiange;Joe, Inwhee
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2022.05a
    • /
    • pp.45-47
    • /
    • 2022
  • Mobile edge computing (MEC), which enables mobile terminals to offload computational tasks to a server located at the user's edge, is considered an effective way to reduce the heavy computational burden and achieve efficient computational offloading. In this paper, we study a multi-user MEC system in which multiple user devices (UEs) can offload computation to the MEC server via a wireless channel. To solve the resource allocation and task offloading problem, we take the total cost of latency and energy consumption of all UEs as our optimization objective. To minimize the total cost of the considered MEC system, we propose an DRL-based method to solve the resource allocation problem in wireless MEC. Specifically, we propose a Asynchronous Advantage Actor-Critic (A3C)-based scheme. Asynchronous Advantage Actor-Critic (A3C) is applied to this framework and compared with DQN, and Double Q-Learning simulation results show that this scheme significantly reduces the total cost compared to other resource allocation schemes

An Algorithm to Optimize Deployment Cost for Microservice Architecture (마이크로서비스 아키텍처의 배포 비용을 최적화하는 알고리즘)

  • Li, Ziang;Lee, Scott Uk-Jin
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.07a
    • /
    • pp.387-388
    • /
    • 2020
  • As the utilization of microservice architectural style in diverse applications are increasing, the microservice deployment cost became a concern for many companies. We propose an approach to reduce the deployment cost by generating an algorithm which minimizes the cost of basic operation of a physical machine and the cost of resources assigned to a physical machine. This algorithm will produce optimal resource allocation and deployment location based on genetic algorithm process.

  • PDF

Cost Analysis of Home Care with Activity-Based Costing(ABC) (활동기준원가계산[ABC]을 적용한 가정 간호 원가 분석)

  • Lee Su-Jeong
    • Journal of Korean Academy of Nursing
    • /
    • v.34 no.6
    • /
    • pp.1117-1128
    • /
    • 2004
  • Purpose: This study was carried out to substantiate the application process of activity-based costing on the current cost of hospital home care (HHC) service. The study materials were documents, 120 client charts, health insurance demand bills, salary of 215 HHC nurses, operating expense, 6 HHC agencies, and 31 HHC nurses. Method: The research was carried out by analyzing the HHC activities and then collecting labor and operating expenses. For resource drivers, HHC activity performance time and workload were studied. For activity drivers, the number of HHC activity performances and the activity number of visits were studied. Result: The HHC activities were classified into 70 activities. In resource, the labor cost was 245₩per minute, operating cost was 9,570₩ per visit and traffic expense was an average of 12,750₩. In resource drivers, education and training had the longest time of 67 minutes. Average length of performance for activities was 13.7 minutes. The workload was applied as a relative value. The average cost of HHC was 62,741₩ and the cost ranged from 55,560₩ to 74,016₩. Conclusion: The fixed base rate for a visit in the current HHC medical fee should be increased. Exclusion from the current fee structure or flexible operation of traveling expenses should be reviewed.

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Estimation of nursing costs for hospitalized patients using the resource-based relative value scale (상대가치(Resource-Based Relative Value)를 이용한 간호행위별 간호원가 산정)

  • Park, Jung-Ho;Song, Mi-Sook;Sung, Young-Hee;Cho, Jung-Sook;Sim, Won-Hee
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.5 no.2
    • /
    • pp.253-280
    • /
    • 1999
  • A cost analysis for hospitalized patients was performed based on the RBRVS in order to determine an appropriate nursing fee schedule. The study was conducted through three phases as follows: 1) Nursing activities provided for the inpatients currently in Korea were identified and classified using a taxonomy which was developed by our research team through the Delphi process. 2) The resource-based relative points for every nursing activity according to nursing time, mental effort and judgement, technical skill, physical effort and stress were determined through a survey of 300 clinical RNs working at 5 tertiary hospitals from May 25 to July 25. 1998. 3) The nursing cost of every nursing activity for hospitalized patients was estimated based on the RBRVS. As a result, 136 nursing activities were identified and classified by nursing processes and nursing domains. However, our classification system of nursing activities should continue to be refined, and all nursing practices should be standardized. The nursing activities were given resource-based relative points ranging from 100 to 400 points, then each nursing activity was assigned a value for the RBRVS, which was determined by the exponential function of 2resource-based relative point/100. Thus, a value of 2 was calculated for 100 points, 4 for 200 points, 8 for 300 points, and 16 for 400 points. Meanwhile, the unit cost of nursing was calculated as 170 Won. The nursing cost of 136 nursing activities was estimated using the RBRVS as shown in

    . A proper nursing fee schedule for a new reimbursement system based upon the results of the above study should be prepared in the near future.

  • PDF

  • (34141) Korea Institute of Science and Technology Information, 245, Daehak-ro, Yuseong-gu, Daejeon
    Copyright (C) KISTI. All Rights Reserved.