Optimizing Construction Alternatives for Repetitive Scheduling

반복공정 최적 공법대안 선정 방법

  • 박상민 (경북대학교 건설환경에너지공학부) ;
  • 이동은 (경북대학교 건축토목공학부)
  • Published : 2015.05.28

Abstract

Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.