A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project

원전건설 물량데이터를 활용한 사업비관리 방안

  • 이상현 (한국수력원자력 중앙연구원 플랜트건설기술연구소)
  • Published : 2017.11.16

Abstract

Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

Keywords