• Title/Summary/Keyword: removal unit

Search Result 495, Processing Time 0.026 seconds

Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal (건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Kim, Hyoung-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.259-266
    • /
    • 2011
  • Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

Removal of Malodorous Gases from Swine Manure by a Polyurethane Biofilter Inoculated with Heterotrophic and Autotrophic Bacteria. (종속영양세균과 독립영양세균을 고정화한 Polyurethane Biofilter의 돈분뇨 악취제거)

  • 이연옥;조춘구;류희욱;조경숙
    • Microbiology and Biotechnology Letters
    • /
    • v.30 no.1
    • /
    • pp.91-97
    • /
    • 2002
  • Removal of malodorous gases from swine manure by a polyurethane biofilter inoculated with heterotrophic and autotrophic bacteria was investigated. Ammonia, hydrogen sulfide and other gases could be efficiently treated at 3~3.6 second of empty bed retention time by the polyurethane biofilter. In the range of SV $200~l,200h^{-1}$ , the average removal efficiency of odor was about 89% when the odor unit of inlet gas was below 4100. Odor elimination capacity of the polyurethane biofilter was$ 1.8$\times$10^{5}$ $~5.0$\times$10^{7}$OUㆍm$^{-3}$$h^{-1}$ that were 84~90% of the inlet load. The critical loads of $NH_3$ and $H_2$S, which mean 97% removal with respect to the inlet loads, were 31 and $27 g.m^{-3}$$h^{-1}$ , respectively. The maximum elimination capacities of $NH_3$ and $H_2$S were 56 and $157 gㆍm^{-3}$ ㆍh$^{-1}$ , respectively. Although the removability for$ NH_3$ and $H_2$S was not influenced by $H_2$S$NH_3$ ratio (ppmv/ppmv), the $H_2$S removability was inhibited by high $H_2$S concentration more than 80 ppmv.

Electrochemical Precipitation Treatment of Copper from an Heavymetal Wastewater (중금속폐수에서 구리의 전기화학적 침전처리)

  • 김재우;이재동;이우식;지은상
    • Journal of Environmental Health Sciences
    • /
    • v.23 no.3
    • /
    • pp.1-6
    • /
    • 1997
  • This research was conducted in the laboratory to investigate an alternative of Copper(Cu) removal from an heavymetal wastewater using the electrochemical precipitation(ECP) process. The ECP unit consisted of an electrolytic cell made of Titanium plate and Steel plate representing anode and cathode. The DC power source applied to the ECP unit had electrical potential(E) of 50$\pm$ 1V, respectively. The synthetic wastewater used in the experiments contained Cu in the 10 mg/l concentration and the electrode separation were 2, 3, 4 cm and the initial pH were 3, 6, 9, 12, and electrolytic concentration were 0.005, 0.0125, 0.025, 0.0375 mole, and the real heavymetal wastewater used in the experiments. From the experiment for removal efficiency according to pH variation, the low pH area doesn't give the coagulation effect by Ti(OH)$_4$ because process interfere with the coagulation and oxidation reaction, therefore the optimum pH was 4-7. The removal rate was 97.75% after the lapse of 30 minutes when copper concentration and electrolytic concentration were respectively 10 mg/l and 0.025 mole. The removal rate was 96.41% after the lapse of 30minutes when the real heavymetal wastewater used. The optimum consumption of power showed 27KWh/m$^3$ when copper concentration, electrolyte concentration and cell potential were respectively 10 mg/l, 0.025 mole and 50$\pm$ 1 Volt.

  • PDF

Effects of Recycled Washwater on Pollutant Removal and Particle Characteristics during Coagulation (회수수가 응집공정의 오염물질 제거 및 입자특성에 미치는 영향)

  • 문병현;김승현;박미선;이향인;이강춘
    • Journal of Environmental Science International
    • /
    • v.11 no.9
    • /
    • pp.955-960
    • /
    • 2002
  • The recycled washwater, which has different water quality and is produced about 5 to 20% of the total water volume treated, affects the unit operation of water treatment, especially coagulation process. However, the effects of recycled washwater on unit operation of water treatment have not been fully investigated. In this study, effects of recycled washwater on coagulation process were investigated to find the optimum coagulation condition by analyzing turbidity, $UV_{254}$, TOC removal efficiencies. In addition, effects of recycled washwater on residual Al after coagulation were studied by analyzing soluble and particulate Al. The size distribution and fractal dimension of coagulated also analyzed. The recycled washwater was lower pH than the raw water. And the recycled washwater had higher $UV_{254}$, TOC and residual Al concentration than the raw water. Residual Al concentration of recycled washwater was about 50 times higher than that of raw water. Optimum coagulant dosages on the blending recycled washwater and the raw water for turbidity, $UV_{254}$ and Al removal were lower than that on the raw water. However, TOC removal increased by increasing coagulant dosage. The size and fractal dimension of coagulated particle produced in the blending recycled washwater were larger, which imply faster settling velocity, than those produced in the raw water only.

Recycling of Biological Industrial Waste as an Adsorbent for Heavy Metals (중금속 제거를 위한 흡착제로서 생물산업 폐기물의 재활용)

  • 장재선;이제만;김용희
    • Journal of environmental and Sanitary engineering
    • /
    • v.17 no.3
    • /
    • pp.7-13
    • /
    • 2002
  • The removal efficiency of heavy metals by chitosan complex isolated from biological industrial waste was investigated through laboratory experiments. The results of the study are as follows. The adsorption kinetics of heavy metals were reached the equilibrium adsorption in approximately 30 minutes and the removal efficiency were showed 70.7~97.4%. The effect of temperature on heavy metals adsorption by chitosan complex shows that as the temperature increased, the amount of heavy metals adsorption per unit weight of chitosan complex increased. The correlation between amount of heavy metals adsorption per unit weight of chitosan complex and temperature were obtained through the coefficient of determination($R^2$). $R^2$ values were 0.75(p<0.05), 0.99(p<0.05) and 0.98(p<0.05) in Hg, Mn, and Zn, respectively. The injected chitosan complex in which 0.1 g was adsorpted highly and the removal of heavy metals was found to have the best removal efficiency A linearized Freundlich equation was used to fit the acquired experimental data. As a result, Freundlich constants, the adsorption intensity(I/n) was 0.5564, 0.4074, 0.5244 on the Hg, Mn, Zn, respectively And the measure of adsorption(k) was 2.2144, 1.6963, 2.0792 on the Hg, Mn, Zn, respectively. So, it was concluded that adsorption of heavy metals by chitosan complex is effective.

A New Quantification Method for Multi-Unit Probabilistic Safety Assessment (다수기 PSA 수행을 위한 새로운 정량화 방법)

  • Park, Seong Kyu;Jung, Woo Sik
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.97-106
    • /
    • 2020
  • The objective of this paper is to suggest a new quantification method for multi-unit probabilistic safety assessment (PSA) that removes the overestimation error caused by the existing delete-term approximation (DTA) based quantification method. So far, for the actual plant PSA model quantification, a fault tree with negates have been solved by the DTA method. It is well known that the DTA method induces overestimated core damage frequency (CDF) of nuclear power plant (NPP). If a PSA fault tree has negates and non-rare events, the overestimation in CDF drastically increases. Since multi-unit seismic PSA model has plant level negates and many non-rare events in the fault tree, it should be very carefully quantified in order to avoid CDF overestimation. Multi-unit PSA fault tree has normal gates and negates that represent each NPP status. The NPP status means core damage or non-core damage state of individual NPPs. The non-core damage state of a NPP is modeled in the fault tree by using a negate (a NOT gate). Authors reviewed and compared (1) quantification methods that generate exact or approximate Boolean solutions from a fault tree, (2) DTA method generating approximate Boolean solution by solving negates in a fault tree, and (3) probability calculation methods from the Boolean solutions generated by exact quantification methods or DTA method. Based on the review and comparison, a new intersection removal by probability (IRBP) method is suggested in this study for the multi-unit PSA. If the IRBP method is adopted, multi-unit PSA fault tree can be quantified without the overestimation error that is caused by the direct application of DTA method. That is, the extremely overestimated CDF can be avoided and accurate CDF can be calculated by using the IRBP method. The accuracy of the IRBP method was validated by simple multi-unit PSA models. The necessity of the IRBP method was demonstrated by the actual plant multi-unit seismic PSA models.

토양세척법과 동전기 정화 기술을 이용한 중금속 오염지반의 원위치 정화

  • 김병일;한상재;이군택;김수삼
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.09a
    • /
    • pp.199-202
    • /
    • 2004
  • In this study the field-scale tests were performed in which in-situ E/K remediation technologies were applied, and then the results were present. For traditional E/K remediation method the efficiency of remediation is not large, but the enhanced method with citric acid significantly increases the removal efficiency. Also EDTA, reported as a good enhancement agent for removal of heavy metals, is similar to that of citric acid. Therefore citric acid is preferred rather than EDTA in view of the cost on the contaminant removal per unit concentration.

  • PDF

Integrated System of RBC-lime Precipiatation for Simultaneous Removal of Organics and Nutrients (회전원판공정과 화학침전공정 조합을 이용한 유기물과 질소*인의 동시제거)

  • 박종안;허준무;손부순
    • Journal of Environmental Health Sciences
    • /
    • v.24 no.1
    • /
    • pp.132-140
    • /
    • 1998
  • Laboratory-scale experiments were conducted using a three-stage rotating biological contactor unit followed by lime precipitation and sedimentation with effluent recycle to the first stage. The purpose of this study was to evaluate the effects of hydraulic loadings of 0.031-0.076 $m^3/m^2/d and recycle ratio of 1 to 3 on the simultaneous removal of organics and nutrients from domestic wastewater. Lime was added to maintain pH of 10.4-11.0 in the coagulation-flocculation reactor. Results showed that the highest nitrogen removal rate of 70.5% occurred at the lower hydraulic loading of 0.031 $m^3/m^2/d at a recirculation rate of 300%, and similarly, highest nitrification occurred at the same hydraulic loading and recycle ratio. Concentration of ammonia nitrogen in the effluent was less than 1 mg/l at the same operating conditions for higher nitrogen removal. Whereas, high BOD and COD removal was observed at hydraulic loading rate of 0.054 $m^3/m^2/d, and high removal of organic matter was evident from the consistent low COD and BOD value. Results obtained from the operating condition of higher loading rate, 300% of recycle rate showed the highest removals. Increasing in recycle rate and hydraulic loading rate increased the volatile solids fraction of the sludges generated to the extent of 47% at 0.076 $m^3/m^2/d hydraulic loading and 300% recirculation rate. Since pH in the flocculator was maintained at the pH of 10.4-11.0, above 90% removal of phosphorus was obtained. Average concentration of suspended solids was always maintained over 40 mg/l in the effluent. Therefore an RBC unit operating at a hydraulic loading near 0.031 $m^3/m^2/d with a recycle rate of 300% is a viable and feasible alternate conditions to produce an effluent with relative low organic matter and phosphorus, provided that there is a neutralization unit to control the pH and SS of the effluent.

  • PDF

A Study on Toluene Removal of VOC and Characteristics of Material Using Biofilter (Bio필터를 이용한 VOC 가스 중 Toluene 제거율과 필터특성 연구)

  • 강신묵;하상안
    • Journal of environmental and Sanitary engineering
    • /
    • v.13 no.2
    • /
    • pp.88-94
    • /
    • 1998
  • This study was investigated the application of biofiltration using cometabolic process to remediate gaseous toluene that are highly recalcitrant to adsorption, absorption and biodegradation. The investigation was conducted using specially built steel columns packed with granular activated carbon for removal of toluene and G.A.C was also coated with Pseudomonas putida microorganisms by addition of KH$_{2}$PO$_{4}$. The biofilter unit was operated in the condition of dry and 27.5% moisture content at gas loading rate of 12.5 l/min. Gaseous toluene taken from tedlar bag was analyzed by the use of G.C. equipped with F.I.D. detector. The removal efficiency of gaseous toluene was 85% at average inlet concentration of 970 ppm during dry operating condition. For gaseous toluene, 91% removal efficient was obtained at the filter material with moisture content and 97% removal efficiency was obtained with Pseudomonas putida microorganisms at gas loading rate of 12.5 l/min.

  • PDF

Pre-study for the improvement of air filtration performance in the air handling unit of subway station (도시철도 지하역사 공기조화기의 미세먼지 저감성능 개선을 위한 사전연구)

  • Kang, Joong-Goo;Shin, Chang-Heon;Bae, Sung-Joon;Kwon, Soon-Bark;Kim, Se-Young;Han, Seok-Yoon
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.541-545
    • /
    • 2008
  • Particulate matter (PM) is one of the major indoor air pollutants especially in the subway station in Korea. In order to remove PM in the subway station, several kinds of PM removal system such as roll-filter, auto-washable air filter, demister, and electrostatic precipitator re used in the air handling unit (AHU) of subway station. However, those systems are faced to operation and maintenance problems since the filter-regeneration unit consisting of electrical or water jet parts is malfunctioned due to the high load of particulates and the filter material needs periodic replacement. In this study, we surveyed the particle removal systems in order to develop the new system of particle removing can be adopted in the current AHU of subway station.

  • PDF