Kyunghwan Ahn;Keunwon Lee;Myungun Kim;Byungjoo Kang;Won Kwon;Jaeyoul Chun
International conference on construction engineering and project management
/
2009.05a
/
pp.1497-1502
/
2009
Due to the construction union's inefficient manner of carrying out their construction projects, lot's of conflicts and arguments among the union members are happening, so the proper model of reconstruction and process at each level of projects are also being recognized as an important part of the industry. So I would like to present an ideal process model of home reconstruction industry. Here below I'm presenting the benefits of this model when its applied properly. Through the study of information gained from the survey of residents, benefits such as AHP, analysis of SPSS, reduced construction time, budget cut, etc. will be produced
Kim, Si-Jong;An, Kwang-Ho;Sung, Chang-Hun;Chung, Myung-Jin
The Journal of Korea Robotics Society
/
v.4
no.4
/
pp.298-304
/
2009
This paper describes an algorithm that improves 3D reconstruction result using a multi-sensor fusion disparity map. We can project LRF (Laser Range Finder) 3D points onto image pixel coordinatesusing extrinsic calibration matrixes of a camera-LRF (${\Phi}$, ${\Delta}$) and a camera calibration matrix (K). The LRF disparity map can be generated by interpolating projected LRF points. In the stereo reconstruction, we can compensate invalid points caused by repeated pattern and textureless region using the LRF disparity map. The result disparity map of compensation process is the multi-sensor fusion disparity map. We can refine the multi-sensor 3D reconstruction based on stereo vision and LRF using the multi-sensor fusion disparity map. The refinement algorithm of multi-sensor based 3D reconstruction is specified in four subsections dealing with virtual LRF stereo image generation, LRF disparity map generation, multi-sensor fusion disparity map generation, and 3D reconstruction process. It has been tested by synchronized stereo image pair and LRF 3D scan data.
Korean Journal of Construction Engineering and Management
/
v.20
no.2
/
pp.79-85
/
2019
The policy introduced recently in order to promote small-size reconstruction housing projects for rehabilitating downtown area consists of aged multi houses has been little practiced, as preferential provisions for such projects are more likely applicable for large projects. Several expert interviews and surveys were conducted to find efficient clauses to overcome the problems and their relative weights. As the results, it is revealed that 'relation of floor area ratio' and 'relaxation of building height limit criteria' are the most effective whereas 'purchasing and operating of residents' common facilities with public fund' is little. The study results would be a great interests for public institutions to rebuild aged housing area without destroying local communities and to provide socially disadvantaged class with rental housing at the same time.
In this study, to solve the problem of the Association-led Housing Reconstruction Business (AHRB), as an alternative to the AHRB, the reliability of the Trust company-led Housing Reconstruction Business (THRB) is verified. To this end, the AHRB and the THRB comparison analyses were performed for the project period, income and expenditure, and the calculation of the Reconstruction Charges (RC). The results of the study are as follows: First, the THRB's business period is shorter than the AHRB's. Second, the THRB's business value is likely to be superior to the AHRB's. Third, due to differences in the calculation period of excess profit for housing reconstruction and the cost items related to implementer, the THRB's RC will be less than the AHRB's RC. Thus, the stability of the THRB has been partially verified as an alternative to the AHRB. The THRB is expected to expand further in the future.
Kim, Kil-Chan;Park, Kyoung-Mi;Eom, Sun-Yong;Lee, Myeong-Hun
The Journal of the Korea Contents Association
/
v.11
no.7
/
pp.508-518
/
2011
In various urban renewal projects related to real estate, developer in order to conduct the business, must get real estate inside project section directly or receive the consent for project from the owners. It must be carried out by consultation. When it fails, developer, in order to get ownership, adopts 'the Right of Claim for the sale' which has forcibleness. However, because the procedure for implementation of the right of claim for the sale is not clear, conflict between stakeholders is caused and it causes extension of period. Therefore, after examining judgments and references of judicial power for administrative litigation of the Right of Claim for the sale, by researching stakeholders of the housing rebuilding project and based on the results, finding out differences of stakeholders' recognition according to their position and problems of exercising procedure of the Right of Claim for the sale, and by presenting improvement plans of the system of the Right of Claim for the sale, contributing the success of the housing rebuilding project is the purpose of it.
In case of loss of many teeth due to dental caries or periodontal disease, improvement of masticatory function and aesthetics can be obtained through implant treatment. However, if the patient does not have a normal intercondylar relationship, it is difficult to achieve an ideal occlusal relationship with only prosthetic treatment. In particular, oral reconstruction with orthodontic treatment or orthognathic surgery is necessary for patients with mandibular prognathism. However, if the posterior occlusion collapses due to severe caries or periodontal disease, orthognathic surgery may be difficult. The occlusal vertical stop is very important for the stability of the mandibular position during occlusal reconstruction through orthognathic surgery. The patient in this case had posterior occlusion collapsed due to the caries of a large number of posterior teeth, and showed mandibular prognathism and long face. We planned a full arch restoration with orthognathic surgery and extracted the hopeless teeth. To secure the vertical stop required for orthognathic surgery, the implant was placed before surgery. After the orthognathic surgery and the final prosthesis application, the results were satisfactory for the improvement of the aesthetics and the restoration of the masticatory function.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.268-273
/
2008
Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.
The Journal of Sustainable Design and Educational Environment Research
/
v.21
no.2
/
pp.1-10
/
2022
This study aims to prepare an objective project basis by reviewing the feasibility of reconstructing and remodeling Greensmart Future School project for S High School's main building, which was built more than 40 years ago, in Incheon Metropolitan City, and to apply and review an effective methodology for determining renovation and remodeling. To this end, the feasibility of reconstruction and remodeling was evaluated in the long term by synthesizing the results of quantitative evaluation through economic review and qualitative evaluation through educational functional review. As a result of the study, it was found that the reconstruction plan was advantageous throughout all alternatives in terms of economic costs, and the field survey indicated limitations in spatial functions to support students' various educational activities and applying new directions, especially the 2022 revised curriculum and high school credit system.
Kim, Hwarang;Lee, Kwangpyo;Jun, Youngjoon;Jang, Hyounseung
Korean Journal of Construction Engineering and Management
/
v.23
no.2
/
pp.76-84
/
2022
Recently, as the frequency of natural disasters has increased, causing enormous human and material damage, the importance of managing disasters is emphasized. In particular, as the concept of Build Back Better becomes meaningful, it has appeared that considering it during Post-disaster Reconstruction is a necessity. Therefore, in this study, the relative importance evaluation and correlation analysis were performed for each influencing factor through the derivation of the influencing factors that should be considered during the reconstruction approach stage of reconstruction after disasters, and a survey of overseas disaster-related experts. As a result of the analysis, 'Adaptability to the environment changes in the future was derived as the most significant influencing factor. It seems that the results of this study can be used as basic data when carrying out the reconstruction project.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.231-234
/
2009
Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, is can be extended to diverse claims when the relation with the related parties is smoothly adjusted. In particular, the association must give up many rights of invisible parts because they are short of professionalism about the business. Accordingly, the study is to analyze claim factor based on case of Supreme Court.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.