Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.2.076

Analysis of Influencing factors Post-Disaster Reconstruction Projects - Focused on the Reconstruction Approach phase -  

Kim, Hwarang (Department of Industrial Policy Research, Construction & Economy Research Institute of Korea)
Lee, Kwangpyo (Department of Industrial Policy Research, Construction & Economy Research Institute of Korea)
Jun, Youngjoon (Department of Industrial Policy Research, Construction & Economy Research Institute of Korea)
Jang, Hyounseung (Architectural Engineering Program, School of Architecture, Seoul National University of Science and Technology)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.2, 2022 , pp. 76-84 More about this Journal
Abstract
Recently, as the frequency of natural disasters has increased, causing enormous human and material damage, the importance of managing disasters is emphasized. In particular, as the concept of Build Back Better becomes meaningful, it has appeared that considering it during Post-disaster Reconstruction is a necessity. Therefore, in this study, the relative importance evaluation and correlation analysis were performed for each influencing factor through the derivation of the influencing factors that should be considered during the reconstruction approach stage of reconstruction after disasters, and a survey of overseas disaster-related experts. As a result of the analysis, 'Adaptability to the environment changes in the future was derived as the most significant influencing factor. It seems that the results of this study can be used as basic data when carrying out the reconstruction project.
Keywords
Post-disaster Reconstruction; Reconstruction Approach; Influencing factors; Relative Importance Index;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ismail, D., Majid, T.A., Roosli, R., and Ab Samah, H.N. (2014). "A review of project management for post-disaster reconstruction project: from international NGOs (INGOs) perspective." Research in Civil and Environmental Engineering, 2(4), pp. 199-215.
2 Mizutori, M., and Guha-Sapir, D. (2020). Human Cost of Disasters: An Overview of the Last 20 years (2000-2019). Centre for Research on the Epidemiology of Disasters (CRED) and United Nations Office for Disaster Risk Reduction (UNDRR), Belgium and Switzerland.
3 GFDRR (Global Facility for Disaster Reduction and Recovery). (2017). Post-Disaster Needs Assessments Guidelines Volume B: Community Infrastructure.
4 Hallegatte, S., Rentschler, J., and Walsh, B. (2018). Building Back Better. World Bank, Washington, DC.
5 Hayles, C.S. (2010). "An examination of decision making in post disaster housing reconstruction," International Journal of Disaster Resilience in the Built Environment. 1(1), pp. 103-122   DOI
6 Ismail, D., Majid, T., and Roosli, R. (2017). "Analysis of Variance of the Effects of a Project's Location on Key Issues and Challenges in Post-Disaster Reconstruction Projects." Economies, 5(4), : 46.   DOI
7 Jenkins, S. (2015). "Resilience: The new paradigm in disaster management-An Australian perspective." World Journal of Engineering and Technology, 3(03), pp. 129-139.   DOI
8 Kim, H.R., (2019). "Toward a Framework for Project Management of Post-Disaster Reconstruction Projects." P.h. thesis, Seoul National University of Science and Technology.
9 Le, K.N., and Tam, V.W.Y. (2007). "A survey on effective assessment methods to enhance student learning." Australasian Journal of Engineering Education, 13(2), pp. 13-20.   DOI
10 Schneider, C. (2012). Sustainable Reconstruction in Urban Areas: A Handbook International Federation of Red Cross And Red Crescent Societies, Geneva.
11 Ophiyandri, T., Amaratunga, D., Pathirage, C., and Keraminiyage, K. (2013). "Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia," International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 236-249.   DOI
12 Muhammad, C., and Kashif, M. (2012). Analysis of Causes of Success and Failure of Post Disaster Reconstruction Projects.
13 Nunnally, J.C. (1978). Psychometric Theory 2nd Edition, McGraw-Hill, New York.
14 Operations, E., and Team, E.R. (2011). How-to guide: Managing post-disaster (re)-construction projects. Baltimore, MD: Catholic Relief Services.
15 Post-disaster Reconstruction of the Built Environment: Rebuilding for Resilience, Wiley, Chichester, pp. 1-12.
16 Rawal, V., and Prajapati, D. (2007). Assessing Damage After Disasters: A Participatory Framework and Toolkit. Unnati--Organisation for Development Education.
17 Sun, C., and Xu, J. (2011). "Estimation of time for Wenchuan Earthquake reconstruction in China," Journal of Construction Engineering and Management, 137(3), pp. 179-187.   DOI
18 Von Meding, J., Wong, J., Kanjanabootra, S., and Tafti, M.T. (2016). Competence-based system development for post-disaster project management. Disaster prevention and management, 25(3), pp. 375-394.   DOI
19 Al-Quershi, M.T., and Kishore, R. (2017). "Claim causes and types in indian construction Industry-Contractor's perspective," American Journal of Civil Engineering and Architecture, 5(5), pp. 196-203.   DOI
20 Felix, D., Branco, J.M., and Feio, A. (2013). "Temporary housing after disasters: A state of the art survey," Habitat International, 40, pp. 136-141.   DOI
21 Amaratunga, D., and Haigh, R.P. (2011). "Introduction", in Amaratunga, D. and Haigh, R.P. (Eds).
22 Carter, W.N. (2008). Asian Development Bank, Metro Manila., pp. 101-185.
23 Chan, D.W., and Kumaraswamy, M.M. (1997). "A comparative study of causes of time overruns in Hong Kong construction projects," International Journal of project management, 15(1), pp. 55-63.   DOI
24 Chang, Y., Wilkinson, S., Potangaroa, R., and Seville, E. (2011). "Identifying factors affecting resource avaiability for post-disaster reconstruction: a case study in China," Constrcution Management and Economics, 29(1), pp. 37-48.   DOI
25 Da Silva, J. (2010). Key considerations in post-disaster reconstruction, Practical Action Publishing, UK.
26 Enshassi, A., and Zaiter, M.A. (2013). "Self-help approach in housing reconstruction and beneficiaries satisfaction in Palestine," In Proceedings of the international symposium on new technologies for urban safety of mega cities in Asia, pp. 9-11.
27 Enshassi, A., Chatat, T., Von Meding, J., and Forino, G. (2017). "Factors influencing post-disaster reconstruction project management for housing provision in the Gaza Strip, Occupied Palestinian Territories," International Journal of Disaster Risk Science, 8(4), pp. 402-414.   DOI
28 Jha, A.K. (2010). Safer homes, stronger communities: a handbook for reconstructing after natural disasters. The World Bank. Washington DC
29 Labadie, J.R. (2008). "Auditing of post-disaster recovery and reconstruction activities," Disaster Prevention and Management, 17(5), pp. 575-586.   DOI
30 Simonovic, S.P., and Peck, A. (2013). "Dynamic resilience to climate change caused natural disasters in coastal megacities quantification framework." International Journal of Environment and Climate Change, pp. 378-401.
31 Collaborative, E.P. (2004). "Participatory planning guide for post-disaster reconstruction." EPC-Environmental Planning Collaborative, TCG International, LLC, pp. 1-22.