1 |
Ismail, D., Majid, T.A., Roosli, R., and Ab Samah, H.N. (2014). "A review of project management for post-disaster reconstruction project: from international NGOs (INGOs) perspective." Research in Civil and Environmental Engineering, 2(4), pp. 199-215.
|
2 |
Mizutori, M., and Guha-Sapir, D. (2020). Human Cost of Disasters: An Overview of the Last 20 years (2000-2019). Centre for Research on the Epidemiology of Disasters (CRED) and United Nations Office for Disaster Risk Reduction (UNDRR), Belgium and Switzerland.
|
3 |
GFDRR (Global Facility for Disaster Reduction and Recovery). (2017). Post-Disaster Needs Assessments Guidelines Volume B: Community Infrastructure.
|
4 |
Hallegatte, S., Rentschler, J., and Walsh, B. (2018). Building Back Better. World Bank, Washington, DC.
|
5 |
Hayles, C.S. (2010). "An examination of decision making in post disaster housing reconstruction," International Journal of Disaster Resilience in the Built Environment. 1(1), pp. 103-122
DOI
|
6 |
Ismail, D., Majid, T., and Roosli, R. (2017). "Analysis of Variance of the Effects of a Project's Location on Key Issues and Challenges in Post-Disaster Reconstruction Projects." Economies, 5(4), : 46.
DOI
|
7 |
Jenkins, S. (2015). "Resilience: The new paradigm in disaster management-An Australian perspective." World Journal of Engineering and Technology, 3(03), pp. 129-139.
DOI
|
8 |
Kim, H.R., (2019). "Toward a Framework for Project Management of Post-Disaster Reconstruction Projects." P.h. thesis, Seoul National University of Science and Technology.
|
9 |
Le, K.N., and Tam, V.W.Y. (2007). "A survey on effective assessment methods to enhance student learning." Australasian Journal of Engineering Education, 13(2), pp. 13-20.
DOI
|
10 |
Schneider, C. (2012). Sustainable Reconstruction in Urban Areas: A Handbook International Federation of Red Cross And Red Crescent Societies, Geneva.
|
11 |
Ophiyandri, T., Amaratunga, D., Pathirage, C., and Keraminiyage, K. (2013). "Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia," International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 236-249.
DOI
|
12 |
Muhammad, C., and Kashif, M. (2012). Analysis of Causes of Success and Failure of Post Disaster Reconstruction Projects.
|
13 |
Nunnally, J.C. (1978). Psychometric Theory 2nd Edition, McGraw-Hill, New York.
|
14 |
Operations, E., and Team, E.R. (2011). How-to guide: Managing post-disaster (re)-construction projects. Baltimore, MD: Catholic Relief Services.
|
15 |
Post-disaster Reconstruction of the Built Environment: Rebuilding for Resilience, Wiley, Chichester, pp. 1-12.
|
16 |
Rawal, V., and Prajapati, D. (2007). Assessing Damage After Disasters: A Participatory Framework and Toolkit. Unnati--Organisation for Development Education.
|
17 |
Sun, C., and Xu, J. (2011). "Estimation of time for Wenchuan Earthquake reconstruction in China," Journal of Construction Engineering and Management, 137(3), pp. 179-187.
DOI
|
18 |
Von Meding, J., Wong, J., Kanjanabootra, S., and Tafti, M.T. (2016). Competence-based system development for post-disaster project management. Disaster prevention and management, 25(3), pp. 375-394.
DOI
|
19 |
Al-Quershi, M.T., and Kishore, R. (2017). "Claim causes and types in indian construction Industry-Contractor's perspective," American Journal of Civil Engineering and Architecture, 5(5), pp. 196-203.
DOI
|
20 |
Felix, D., Branco, J.M., and Feio, A. (2013). "Temporary housing after disasters: A state of the art survey," Habitat International, 40, pp. 136-141.
DOI
|
21 |
Amaratunga, D., and Haigh, R.P. (2011). "Introduction", in Amaratunga, D. and Haigh, R.P. (Eds).
|
22 |
Carter, W.N. (2008). Asian Development Bank, Metro Manila., pp. 101-185.
|
23 |
Chan, D.W., and Kumaraswamy, M.M. (1997). "A comparative study of causes of time overruns in Hong Kong construction projects," International Journal of project management, 15(1), pp. 55-63.
DOI
|
24 |
Chang, Y., Wilkinson, S., Potangaroa, R., and Seville, E. (2011). "Identifying factors affecting resource avaiability for post-disaster reconstruction: a case study in China," Constrcution Management and Economics, 29(1), pp. 37-48.
DOI
|
25 |
Da Silva, J. (2010). Key considerations in post-disaster reconstruction, Practical Action Publishing, UK.
|
26 |
Enshassi, A., and Zaiter, M.A. (2013). "Self-help approach in housing reconstruction and beneficiaries satisfaction in Palestine," In Proceedings of the international symposium on new technologies for urban safety of mega cities in Asia, pp. 9-11.
|
27 |
Enshassi, A., Chatat, T., Von Meding, J., and Forino, G. (2017). "Factors influencing post-disaster reconstruction project management for housing provision in the Gaza Strip, Occupied Palestinian Territories," International Journal of Disaster Risk Science, 8(4), pp. 402-414.
DOI
|
28 |
Jha, A.K. (2010). Safer homes, stronger communities: a handbook for reconstructing after natural disasters. The World Bank. Washington DC
|
29 |
Labadie, J.R. (2008). "Auditing of post-disaster recovery and reconstruction activities," Disaster Prevention and Management, 17(5), pp. 575-586.
DOI
|
30 |
Simonovic, S.P., and Peck, A. (2013). "Dynamic resilience to climate change caused natural disasters in coastal megacities quantification framework." International Journal of Environment and Climate Change, pp. 378-401.
|
31 |
Collaborative, E.P. (2004). "Participatory planning guide for post-disaster reconstruction." EPC-Environmental Planning Collaborative, TCG International, LLC, pp. 1-22.
|