• 제목/요약/키워드: reconstruction project

검색결과 182건 처리시간 0.031초

A FUNDAMENTAL STUDY ON IMPROVING PROCESS BY APPLYING CONSTRUCTION MANAGEMENT(CM) METHODS TO HOUSING RECONSTRUCTION PROJECTS

  • Kyunghwan Ahn;Keunwon Lee;Myungun Kim;Byungjoo Kang;Won Kwon;Jaeyoul Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1497-1502
    • /
    • 2009
  • Due to the construction union's inefficient manner of carrying out their construction projects, lot's of conflicts and arguments among the union members are happening, so the proper model of reconstruction and process at each level of projects are also being recognized as an important part of the industry. So I would like to present an ideal process model of home reconstruction industry. Here below I'm presenting the benefits of this model when its applied properly. Through the study of information gained from the survey of residents, benefits such as AHP, analysis of SPSS, reduced construction time, budget cut, etc. will be produced

  • PDF

다중센서 융합 상이 지도를 통한 다중센서 기반 3차원 복원 결과 개선 (Refinements of Multi-sensor based 3D Reconstruction using a Multi-sensor Fusion Disparity Map)

  • 김시종;안광호;성창훈;정명진
    • 로봇학회논문지
    • /
    • 제4권4호
    • /
    • pp.298-304
    • /
    • 2009
  • This paper describes an algorithm that improves 3D reconstruction result using a multi-sensor fusion disparity map. We can project LRF (Laser Range Finder) 3D points onto image pixel coordinatesusing extrinsic calibration matrixes of a camera-LRF (${\Phi}$, ${\Delta}$) and a camera calibration matrix (K). The LRF disparity map can be generated by interpolating projected LRF points. In the stereo reconstruction, we can compensate invalid points caused by repeated pattern and textureless region using the LRF disparity map. The result disparity map of compensation process is the multi-sensor fusion disparity map. We can refine the multi-sensor 3D reconstruction based on stereo vision and LRF using the multi-sensor fusion disparity map. The refinement algorithm of multi-sensor based 3D reconstruction is specified in four subsections dealing with virtual LRF stereo image generation, LRF disparity map generation, multi-sensor fusion disparity map generation, and 3D reconstruction process. It has been tested by synchronized stereo image pair and LRF 3D scan data.

  • PDF

AHP분석을 통한 가로주택정비사업의 개선방안 (Improvement of Small-size Multi-housing Area Reconstruction Project Using AHP Analysis)

  • 김석준;이상호;허영기
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.79-85
    • /
    • 2019
  • 최근에는 '빈집 및 소규모 주택정비에 관한 특례법'을 제정하여 정부정책사업으로 가로주택정비사업을 활성화하기 위해 노력하고 있다. 그라나 이 정책은 원도심의 노후 불량 건축물이 밀집한 가로구역에서 소규모 정비사업보다 대규모정비사업 이 더 적용돼서 실적이 매우 미흡하고 제도개선이 필요한 실정이다. 그래서 본 연구에서는 전문가 간담회와 설문조사를 통해 대규모 정비사업과 차별화된 법적인 공공지원 방안을 도출한다. 연구결과는 '층 면적 비율'과 '건축물의 높이제한 기준 완화'가 가장 효과적인 반면 '지자체에서 주민공동시설 유상매입 후 운영'은 미미한 것으로 나타났다. 이러한 결과는 그 지역의 사회환경을 파괴하지 않고 노후한 주택 지역을 정비사업을 하는 동시에 취약계층에 임대 주택을 제공함으로 공공기관에 큰 이익이 될 수 있다는 전망이다. 그리고 소규모 정비사업인 가로주택사업을 활성화하기 위해 효과적으로 도입하여 적용 가능한 특례항목을 제시함으로서, 도심지내 임대주택건설을 유도하고 세입자 우선공급을 통한 둥지내몰림 현상을 방지하며 신혼부부나 청년 등의 젊은 층 입주를 통해 노후주거지에 새로운 활력을 도모하는데 도움이 될 것으로 기대한다.

조합방식과 신탁방식의 재건축사업 및 재건축부담금에 관한 비교 연구 (A Comparative Study on the Association-led and Trust Company-led Methods in Reconstruction Business and Reconstruction Charges)

  • 이한창;유선종
    • 지적과 국토정보
    • /
    • 제49권1호
    • /
    • pp.29-43
    • /
    • 2019
  • 본 연구는 조합방식 재건축사업의 문제점을 해결하기 위하여, 조합방식 재건축사업의 대안으로 신탁방식 재건축사업의 신뢰성을 검증한다. 이를 위해 조합방식 재건축사업과 신탁방식 재건축사업의 사업기간, 사업수지, 재건축부담금 산정내역 등의 비교분석을 진행하였다. 연구 결과는 다음과 같다. 첫째, 사업 기간은 신탁방식의 재건축사업이 조합방식의 재건축사업보다 짧다. 둘째, 사업성은 신탁방식이 조합방식보다 좋을 가능성이 크다. 셋째, 재건축초과이익 산정 기간의 차이와 시행 주체 관련 비용 항목의 차이로 인하여 신탁방식이 조합방식보다 재건축부담금을 적게 부담하게 된다. 따라서 조합방식 재건축사업의 대안으로서 신탁방식 재건축사업의 안정성은 부분적으로 검증되었다. 신탁방식 재건축사업은 앞으로 더 확대될 것으로 예상된다.

주택재건축사업의 매도청구권 행사 절차의 문제점 분석 (Analysis of The Problem of Exercising the Right of Claim for the Sale of the Housing Reconstruction Project)

  • 김길찬;박경미;엄선용;이명훈
    • 한국콘텐츠학회논문지
    • /
    • 제11권7호
    • /
    • pp.508-518
    • /
    • 2011
  • 정비사업에 있어서 사업시행자가 사업을 시행하기 위해서는, 사업구역 내 부동산을 직접 취득 하거나 소유자들로부터 사업시행에 대한 동의를 받아야만 한다. 주택재건축사업의 경우 조합과 미동의자 사이에 부동산에 대한 협의가 이루어지지 아니할 때 원활한 사업진행을 위해 매도청구제도가 사용된다. 그러나 매도청구권 행사 절차에 대한 규정이 명확하지 않아 재건축사업의 이해관계자들 간의 분쟁이 다발하고 있으며, 이러한 법적분쟁은 사업기간 연장 및 사업비용 증가와 같은 재정적 문제로 직결 되며, 극단적인 경우에는 사업성이 상실되어 재건축사업을 포기해야 하는 사태를 유발하기도 한다. 따라서 본 연구는 매도청구권의 행사 절차와 관련된 법적분쟁에 있어서의 판례 및 실제 재건축 사업 사례를 살펴보고, 재건축사업의 이해관계자들에게 설문조사를 실시하여, 이해관계자 입장별 인식의 차이 및 매도청구권 행사 절차의 문제점을 도출한다. 그 결과를 바탕으로 이해관계자 다수가 원하는 매도청구권제도의 개선 방안을 제시함으로써, 법적 분쟁을 미연에 방지하여, 재건축 사업의 성공에 일조하는데 그 목적이 있다.

Full Arch Restoration through Orthognathic Surgery after Implantation on the Patients with Mandibular Prognathism and Loss of Posterior Teeth: A Case Report

  • Hwang, Kyoung-Sub;Lee, Jin-Ju;Jeon, Young-Chan;Shin, Sang-Hun;Song, Jae-Min;Lee, So-Hyoun;Huh, Jung-Bo
    • Journal of Korean Dental Science
    • /
    • 제10권1호
    • /
    • pp.35-44
    • /
    • 2017
  • In case of loss of many teeth due to dental caries or periodontal disease, improvement of masticatory function and aesthetics can be obtained through implant treatment. However, if the patient does not have a normal intercondylar relationship, it is difficult to achieve an ideal occlusal relationship with only prosthetic treatment. In particular, oral reconstruction with orthodontic treatment or orthognathic surgery is necessary for patients with mandibular prognathism. However, if the posterior occlusion collapses due to severe caries or periodontal disease, orthognathic surgery may be difficult. The occlusal vertical stop is very important for the stability of the mandibular position during occlusal reconstruction through orthognathic surgery. The patient in this case had posterior occlusion collapsed due to the caries of a large number of posterior teeth, and showed mandibular prognathism and long face. We planned a full arch restoration with orthognathic surgery and extracted the hopeless teeth. To secure the vertical stop required for orthognathic surgery, the implant was placed before surgery. After the orthognathic surgery and the final prosthesis application, the results were satisfactory for the improvement of the aesthetics and the restoration of the masticatory function.

공동주택 재건축 사업의 분쟁 클레임에 관한 연구 (A Study on Dispute Claim to the Apartment Reconstruction Projects)

  • 이미애;김대영
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.268-273
    • /
    • 2008
  • 재개발 재건축 사업은 추진절차가 복잡하고 다양한 이해관계자들이 참여하고 있어 이해관계자들의 관계가 원만하게 조정되지 않을 경우 각종 분쟁으로 확대될 수 있다. 특히 준공이후 입주단계에서 분쟁 발생시, 당해 지역주민 중심의 조합은 사업에 대한 전문성이 부족하여 시공회사 측의 이윤 극대화로 야기되어 지는 보이지 않는 부분의 많은 권리를 포기하여야 한다. 그러나 이러한 분쟁 클레임에 관한 연구는 정부나 시공사 관점에서의 연구가 대부분이며 발주자(=조합) 관점의 연구는 거의 없다고 판단되어진다. 또한 분쟁 클레임 발생 시 관련 업무는 현재까지 안전진단업체에서 주로 수행되어져 왔으나 아직까지는 체계화되어지지 못하고 있다. 따라서 본 연구에서는 준공/ 입주 후 조합이 시공사를 대상으로 한 분쟁 클레임 발생 시 이를 합리적으로 대비하고, 재건축사업에 대한 발주자(=조합)의 권리를 확보하기 위한 건설 사업관리자 분쟁 클레임 프로세스를 제공하고 이와 더불어 각 단계별 필요한 서류의 확보를 가능케 하는 Check List를 개발하고자 한다. 본 연구를 통해 조합은 사전에 관련서류를 확보하게 되고 이로 인해 분쟁 클레임 발생 시 합리적인 대응 자료를 구축할 수 있으며, 또한 건설 사업관리자의 합리적인 사업비 분석을 가능케 하고 예상낭비를 최소화 시켜 업무의 효율화가 이루어 질 것으로 예상되어 진다.

  • PDF

노후 학교시설의 개축 및 리모델링 타당성 판별 방법에 대한 기초연구 -인천광역시 S 고등학교 사례를 중심으로- (A Basic Study on the Determination Method of Reconstruction and Remodeling of Deteriorated School Facilities - Focusing on the Case of S High School in Incheon Metropolitan City -)

  • 맹준호;김성중;송병준;김재영
    • 교육녹색환경연구
    • /
    • 제21권2호
    • /
    • pp.1-10
    • /
    • 2022
  • 본 연구는 인천광역시에 위치한 S 고등학교의 40년 이상 경과된 본관동의 그린스마트 미래학교 사업 추진을 위한 개축과 리모델링의 타당성을 검토하여 객관적 사업 근거를 마련하고, 사업 추진 적정예산 수립 및 사업추진 방향의 기초자료를 확보하기 위한 목적과, 개축과 리모델링의 판별을 위한 효과적인 방법론을 적용 및 검토하는데 목적이 있다. 이를 위해 경제성 검토를 통한 정량적 평가 결과와 교육기능적 검토를 통한 정성적 평가를 종합하여 장기적인 측면에서 개축과 리모델링의 타당성을 평가하였다. 연구결과, 연간발생비용에 따른 경제적 측면에서는 모든 대안에서 개축안이 유리한 것으로 나타났으며, 현장조사의 결과에 따라 학생들의 다양한 교육 활동의 지원과 교육과정, 특히 곧 시행 예정인 2022 개정교육과정과 고교학점제 등 새로운 교육방향을 적용하는데 공간 기능적 측면에서의 한계점이 있는 것으로 검토되었으므로, 장기적인 측면에서는 리모델링 보다는 개축이 유리할 것으로 판단된다.

재난 후 재건사업의 영향요인에 관한 분석 - 재건접근 단계를 중심으로 - (Analysis of Influencing factors Post-Disaster Reconstruction Projects - Focused on the Reconstruction Approach phase -)

  • 김화랑;이광표;전영준;장현승
    • 한국건설관리학회논문집
    • /
    • 제23권2호
    • /
    • pp.76-84
    • /
    • 2022
  • 최근 자연재해 발생빈도 증가로 막대한 인적 및 물적 피해가 발생함에 따라 재난관리에 관한 중요성이 증가하고 있다. 특히 발전적 재건 개념에 관한 중요성이 증가함에 따라 재건설 시 이에 관한 고려가 필요할 것으로 판단된다. 따라서 본 연구는 재난 후 재건설의 재건접근 단계 시 고려되어야 하는 영향요인에 관한 도출과 국외 재난 관련 전문가를 대상으로 한 설문조사를 통하여 영향요인별 상대적 중요도 평가와 상관분석을 수행하였다. 분석결과 가장 중요한 영향요인으로 '미래 환경변화에 대한 적응성'이 도출되었다. 본 연구 결과는 재건사업 수행 시 기초자료로 활용이 가능할 것으로 판단된다.

재건축 사업의 클레임 요인 분석에 대한 연구 (A Study of Analyzing Claim Factor on the Reconstruction Projects)

  • 신윤경;최현상;이경하;조성;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.231-234
    • /
    • 2009
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, is can be extended to diverse claims when the relation with the related parties is smoothly adjusted. In particular, the association must give up many rights of invisible parts because they are short of professionalism about the business. Accordingly, the study is to analyze claim factor based on case of Supreme Court.

  • PDF