• Title/Summary/Keyword: project scale

Search Result 1,246, Processing Time 0.025 seconds

A Study on Implementation Delay Factors of the Block-unit Housing Renewal Project - Focused on the Incheon Metropolitan City - (가로주택정비사업의 사업시행 지연요인에 관한 연구 - 인천광역시 사례를 중심으로 -)

  • Han, Young Hoon;Na, In Su
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.32-40
    • /
    • 2022
  • The block-unit housing renewal project was presented as an alternative method to overcome the side effects of large-scale renewal projects while improving poor residential conditions. However, projects implementation is prolonged and even the pace of projects, which was considered an various incentives, is being delayed for the most part. In this study, delay factors are drawn by eight; conflict among association members, contract delay of joint implementation, participation paucity of constructor, inadequate project guidelines, alteration of project plan, lack of renewal project professionals, stricter loan restriction of HUG, lack of capacity of project operator. We categorized those eight factors to three aspects such as implementation, participants and proposition and suggested improvement alternatives according to three aspects.

AGENT-BASED SIMULATION OF ORGANIZATIONAL DYNAMICS IN CONSTRUCTION PROJECT TEAMS

  • JeongWook Son;Eddy M. Rojas
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.439-444
    • /
    • 2011
  • As construction projects have been getting larger and more complex, a single individual or organization cannot have complete knowledge or the abilities to handle all matters. Collaborative practices among heterogeneous individuals, which are temporarily congregated to carry out a project, are required in order to accomplish project objectives. These organizational knowledge creation processes of project teams should be understood from the active and dynamic viewpoint of how they create information and knowledge rather than from the passive and static input-process-output sequence. To this end, agent-based modeling and simulation which is built from the ground-up perspective can provide the most appropriate way to systematically investigate them. In this paper, agent-based modeling and simulation as a research method and a medium for representing theory is introduced. To illustrate, an agent-based simulation of the evolution of collaboration in large-scale project teams from a game theory and social network perspective is presented.

  • PDF

The Effect of PL Leadership and Characteristics of Project on Project Participants' Satisfaction and Performance (PL 리더십 성향과 프로젝트 특성요인이 프로젝트 참여 만족 및 성과에 미치는 영향)

  • Yang, Hee-Dong;Kim, Myung-Jin;Kang, So-Ra
    • Asia pacific journal of information systems
    • /
    • v.20 no.4
    • /
    • pp.53-79
    • /
    • 2010
  • The study was originated from recognition that project participants' satisfaction should be Improved to raise project performance and to make progress of a successful project since the above dissatisfaction was operated as a danger factor of the project. The study selected one large-scale sample project and attempted measuring characteristics of the project, participants' satisfaction and project performance with the whole project participants. The study analyzed correlations between individual level (team members) and group level (development team), and examined what effect a sub project manager under complicated hierarchical organization of the large-scale project, namely PL (project leader)'s leadership style had on each individual project participant's satisfaction and what effect project uncertainty in organization/technology environment had on project participants' satisfaction and project performance. The study verified that development team (group) had an effect on team member (individual)-level project participants' satisfaction by disclosing that there was a significant dispersion among groups within project participants' satisfaction by each individual. It is analyzed that it is necessary to make improvement through approach by each pertinent team to raise individual-level project participants' satisfaction. The study also verified PL's ideal leadership under strict methodology and hierarchical control of the large-scale project. Based on the verification of the hypotheses, the results of the analysis were produced as follows. First, the development team affects the satisfaction level that an individual has when he/she participates in a project. This suggests that the satisfaction with project participation should be improved at the team level. In addition, the project management style and leadership orientation of the manager of a sub project who is mostly affected by the team proved to have a direct influence on the satisfaction with project participation and project performances. Second, both the performance-oriented leadership and the relationship-oriented leadership of the PL of the development team were verified to have a significant effect on the satisfaction of the team members associated with project participation. In other words, when the team members recognize that the PL of the development team shows both the performance-oriented leadership and the relationship-oriented leadership, their satisfaction with project participation increases accordingly. Third, it was verified that the uncertainty of the organizational environment significantly affects the satisfaction level when the PL of the development team exerts a relationship-oriented and performance-oriented leadership. The higher the uncertainty of the organizational environment is, the more the satisfaction with project participation decreases whereas the relationship-oriented leadership has a more positive effect on the satisfaction than the performance-oriented leadership style. Fourth, when the PL of the development team exerts the relationship-related and performance-related leadership, the uncertainty of the technological environment has a significant influence on the satisfaction level. The higher the uncertainty of the technological environment is, the more the satisfaction with project participation decreases whereas the performance-oriented leadership has a more positive effect on the satisfaction than the relationship-oriented leadership style. The result of the research on the uncertainty of the project environment suggests that when the development team leader exerts a relationship-oriented and performance-oriented leadership style, the uncertainty of the organizational environment has a significant effect on the satisfaction with project participation; the higher the uncertainty of the organizational environment, the more the satisfaction level decreases, and the relationship-oriented leadership style affects the satisfaction level more positively than the performance-oriented leadership style. In addition, when the development team leader displays a relationship-oriented and performance-oriented leadership style, the uncertainty of the technological environment has a significant effect on the satisfaction with project participation; the higher the uncertainty of the technological environment. the more the satisfaction level decreases. The performance-oriented leadership style as well affects the satisfaction level more positively than the relationship-oriented leadership style. Based on the above results, the research provides the following implications when handling multiple concurrent projects. First, the satisfaction with the participation in the multiple concurrent projects needs to be enhanced at the team (group) level. Second. the manager of the project team, particularly the middle managers should have both a performance-oriented and relationship (task and human)-oriented attitude and exert a consolidated leadership in order to improve the satisfaction of team members with project participation and their performances. Third, as the uncertainty factor of the technological and organizational environment among the characteristics factors of the project has room for methodological improvement depending on one's effort even though there are some complications, we need to continuously prevent and control the risks resulting from the uncertainties of the technological and organizational environment of the project in order to enhance the satisfaction of project participation and project performances. Fourth, the performance (task)-oriented leadership is required when there is uncertainty in a technological environment while the relationship (human)-oriented leadership is required when there is uncertainty in an organizational environment. This research has the following limitations. First, this research intended to select one large-sized sample project and measure the project characteristics, the satisfaction of all the participants associated with project participation, and their performances. Therefore, it is inappropriate to generalize and apply the result of this result onto other numerous projects. Second, as this case study entailed a survey to measure the characteristics factors and performance of the project, since the result value was based on the perception of project team members, the data may have insufficient objectivity. Third, though this research targeted on all the project participants, some development teams did not provide sufficient data and questionnaires were collected from some specific development teams among the 23 development teams, causing a significant deviation in the response rate among the development teams. Therefore, we need to continuously conduct the follow-up researches making comparisons among the multiple projects, and centering on the characteristics factors of the project and its satisfaction level.

An exploratory study on the collaboration mechanism in project-based business : focused on supply chain institutions and operational efficiency (프로젝트형 사업에서 협업기제에 대한 탐색적 연구 : 공급망 제도와 운영효율성을 중심으로)

  • Cho, Namhyung
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.10
    • /
    • pp.173-183
    • /
    • 2019
  • The purpose of research is to explore the direction of building a collaborative supply chain, which may enhance the competitiveness of firms and their project-based supply chain. Large-scale plants or large-scale buildings construction is referred to as a EPC project. To identify a collaboration mechanism in the project-based supply chain, the empirical research was conducted on the interrelationship between the absorption capacity of firms participating in the EPC project, the incentive norms, the goal congruence with supply chain, and the ability of respond to changes of the task of supply chain. PLS-SEM was used as an analysis method to verify the research model. It is expected that the results will help inform the need for SCM, the importance of the incentive norms and the goal congruence in the supply chain of EPC project.

Feasibility Study of Microturbine CHP and Greenhouse $CO_2$ Enrichment System as Small Scale LFG Energy Project (소규모 매립가스 자원화를 위한 마이크로터빈 열병합발전 및 유리온실 $CO_2$ 농도 증가 시스템의 타당성 연구)

  • Park, Jung-Keuk;Hur, Kwang-Beom;Rhim, Sang-Gyu;Lee, In-Hwa
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.15-24
    • /
    • 2009
  • As new small scale LFG (landfill gas) energy project model which can improve economic feasibility limited due to the economy of scale, LFG-Microturbine combined heat and power system with $CO_2$ fertilization into greenhouses was proposed and investigated including basic design process prior to the system installation at Gwang-ju metro sanitary landfill. The system features $CH_4$ enrichment for stable microturbine operation, reduction of compressor power consumption and low CO emission, and $CO_2$ supplement into greenhouse for enhancement plant growth. From many other researches, high $CO_2$ concentration was found to enhance $CO_2$ assimilation (also known as photosynthesis reaction) which converts $CO_2$ and $H_2O$ to sugar using light energy. For small scale landfills which produce LFG under $3\;m^3$/min, among currently available prime movers, microturbine is the most suitable power generation system and its low electric efficiency can be improved with heat recovery. Besides, since its exhaust gas contains very low level of harmful contaminants to plant growth such as NOx, CO and SOx, microturbine exhaust gas is a suitable and economically advantageous $CO_2$ source for $CO_2$ fertilization in greenhouse. The LFG-Microturbine combined heat and power generation system with $CO_2$ fertilization into greenhouse gas to enhance plant growth is technologically and economically feasible and improves economical feasibility compared to other small scale LFG energy project model.

  • PDF

An Analysis on the DEA Efficiency of Project Based on the Environment-friendly Agricultural Production (DEA를 이용한 친환경생산기반구축사업의 효율성 분석)

  • Yang, Sung-Bum
    • Korean Journal of Organic Agriculture
    • /
    • v.24 no.3
    • /
    • pp.337-353
    • /
    • 2016
  • The objective of this study is to analyze the DEA efficiency of the environment-friendly agricultural districts and zones. There are political inefficiency in districts and zones with 45.3% and 85.0%. It mainly results from scale efficiency than pure technical efficiency. There are 10 efficient zones, while 34 decreasing return to scale ones. Meanwhile, districts mostly have increasing return to scale with 97.9%. The results of this study is meaningful to re-construct the project based on the environment-friendly agricultural production.

A Study on the Effects of Risk Perception and Opportunism on the Project Performance (위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Yoon, Chang Soo;Jo, Dong Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.

The Introduction of Desalination Plant System (기획특집 - 해수담수화 플랜트 소개)

  • Cho, Maeng-Soo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.3
    • /
    • pp.27-31
    • /
    • 2009
  • Recent desalination plant system are being operated by applying one of the technologies as like MSF, MED and, or RO. The production cost of pure water from sea water by the desalination plant was U$9/m$^3$ in 1960, but now has been reduced to U$1/m$^3$ at present. The Power and Desalination Plant Project in Al Cobar of Saudi Arabia gave good chance to us export the similar plant systems actively to the world market. 1Hidd IWPP Project in Bahrain, Taweelah B Extension Project in Abu Dhabi of UAE and Ras Laffan B IWPP of Qatar are the recent large scale desalination projects under construction.

  • PDF

The Study On Economic Effect for the Construction Project -Emphasized on Flood Control Project- (건설사업의 경제성 조사연구 -치수사업 중심으로-)

  • 김용석
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.14 no.3
    • /
    • pp.2749-2760
    • /
    • 1972
  • The aim of this study is to decide the effective scale of investment and regional of flood control project in chronical inundation area of Moo-Han River vicinity by selecting objective regions of Seong-Jang, Yae-San, Oh-Ka and Shin-Ahm areas. In order to accomplish, the writer conducted research on the extent of damages, assets and hydrographic patterns of flood in the areas as described in foregoing chapters, and further analized the research in the method of survey and investment efficiency evaluation for flood control directed by the Ministry of Construction. According to the above analysis, the writer concluded as follows: The investment efficiency is different depend upon regional character. However, it is found that economic efficiency is high throughout in probility year 70. Therefore, the writer consider the scale of economic investment should be same as that of probability year 70 amounted \610,904,000 and regional priority are as following table. Considering the time length, objective areas of study and difficulties encounted during research,, this study is belioved to be insufficient. Accordingly, it is hoped that this study is continued to complete problems undone and is contributive to rationalize the flood control project in this areas.

  • PDF

A Research Plan on the Application of Systems Engineering to Light Rail Transit Project (경량전철사업 시스템엔지니어링 적용기술 개발 전략)

  • Han, Seok-Youn;Choie, Yo-Chel;Park, Ki-Jun;Lee, Ahn-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1604-1611
    • /
    • 2011
  • Light Rail Transit(LRT) is a large scale complex system which combines rolling stocks, power supply, signal communication, tracks & stations, and hundreds of billions of wons per project are spent for construction. Therefore efficient integration of sub-systems is very important. The systems engineering is a good method to reduce the cost and risk of LRT project. In this paper, we introduce a research plan on the application of systems engineering to LRT project. We, Korea Railroad Research Institute(KRRI), launched a research program with 4 companies, which is support by the governmen and project period is 4.5 years. Main research topic is to develop the technology for the application of systems engineering technical process to LRT project based on ISO/IEC 15288.

  • PDF