• 제목/요약/키워드: project process

검색결과 4,154건 처리시간 0.031초

전선 제조공정의 동(銅) 재료비 개선을 위한 6시그마 프로젝트 (A six sigma Project for Reducing the Cost Copper Materials of the Cable Manufacturing Process)

  • 배영주
    • 대한안전경영과학회지
    • /
    • 제11권1호
    • /
    • pp.121-130
    • /
    • 2009
  • This paper considers a six sigma project for reducing the cost copper of the cable materials in a electric wire company. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variables are selected by using an input variable evaluation table: large cable, plating, and a twisted pair. DOE is utilized for finding the optimal process conditions of the three key process input variables. The implementing result of this six sigma project is enable for reducing of the 2.8% copper materials.

개발형 주택건설사업의 성공적 수행 위한 사업 기획 업무프로세스 모델 연구 (A Business Planning Process Model to Develope Successful Housing Project)

  • 박찬우;김경래
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.245-250
    • /
    • 2001
  • 최근의 국내 건설시장은 시장 규모의 축소로 인해 과잉경쟁이 이루어지고 있으며 이에 기업들은 적극적인 수주산업인 기획제안형 주택사업 분야에 관심을 기울이고 있다. 기획제안형 사업에서 가장 중요한 단계는 사업성 여부를 판단하는 초기 기획단계로서 현재 각 기업들마다 기획업무 모델을 갖고 있으나 표준적인 모델이 제시되지 못하고 있다. 이에 본 논문에서는 국내 기업의 기획업무 절차와 문제점파악에 의한 개선 방안을 바탕으로 개발형 주택사업 의 성공적 수행을 위한 전략적 기획업무 모델을 제안하려 한다

  • PDF

계층분석법(AHP)을 이용한 BTT사업비 타당성 평가모형 정립에 관한 연구 (A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process)

  • 정영한
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.155-160
    • /
    • 2008
  • The BTL project, 4 years since its operation. has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the priority to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following : LCC analysis and disbursement for government including two more detailed factors.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • 차희성
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

모니터 소재의 색상편차 개선을 위한 6시그마 프로젝트 (A Six Sigma Project for Reducing the Color Variation of the Monitor Materials)

  • 홍성훈;반재석
    • 품질경영학회지
    • /
    • 제29권3호
    • /
    • pp.166-176
    • /
    • 2001
  • This paper considers a six sigma project for reducing the color variation of the monitor materials in a chemical plant. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variable evaluation table; a melting pressure, a coloring agent, and a DP color variation. DOE is utilized for finding the optimal process conditions of the three key process input variables. The sigma level of defects rate becomes a 4.58 from a 2.0 at the beginning of the project.

  • PDF

개발 프로젝트의 기술관리 계획 프로세스 (Technical Management Planning Process of Engineering Project)

  • 유일상;박영원
    • 시스템엔지니어링학술지
    • /
    • 제1권2호
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

QFD와 AHP를 이용한 ITS 프로젝트관리자 핵심역량 연구 (A Study on Core Competencies of ITS Project Managers Using QFD and AHP)

  • 이봉우;김자희;김우제
    • 한국IT서비스학회지
    • /
    • 제10권1호
    • /
    • pp.89-103
    • /
    • 2011
  • ITS (Intelligent Transportation System) has been more popular but ITS project managements remain complex because of diverse stakeholders and multidisciplinary processes of ITS. The multidisciplinary process enforces specialized competencies on ITS project managers comparing to other system integration project managers. In this paper, we derived core competencies of ITS projects from previous researches, built the hierarchy of the competencies, and employed AHP (Analytic Hierarchy Process) surveying ITS project managers and auditors with the hierarchy. Finally, we analyzed the difference of evaluation model on ITS project manager between project managers and auditors using Mann-Whitney U test. Additionally we suggest a method of building MECE (Mutually Exclusive and Collectively Exhaustive) structure for AHP using the HoQ (House of Quality). We expect our model to give some inspirations for raising capable ITS project managers and selecting a proper project manager for an ITS project.

Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스 (EVMS Application Process based on Project Management Processes)

  • 백성민;안병주;김재준;공건영
    • 한국건설관리학회논문집
    • /
    • 제3권2호
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System)가 공정과 연계하여 공사비를 관리할 수 있는 적절한 수단으로 대두되고, EVMS 적용의 제도화 계획이 발표된 이후 수많은 건설현장과 학계에서는 EVMS의 국내 도입 및 활성화를 위한 연구와 국내 건설 환경을 고려하는 EVMS 모델 및 이행 프로세스에 대한 연구가 진행되고 있다. 본 연구는 EVMS process에 관한 연구로서, 기존 EVMS Process에 관한 연구의 문제점을 도출하여 그 대안으로 PMBOK의 Project Management Process글 제시하고, EVMS 적용에 알맞도록 수정하여 그것을 기반으로 새로운 EVMS의 실무적용 프로세스를 제시하고자 하였다. 본 연구를 통해 EVMS 프로세스에 관한 연구의 새로운 방향을 제시하고자 하며, 나아가 국내건설공사의 특수성을 반영한 공정-공사비 통합관리체계의 틀을 마련하고자 한다.

지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구 (Analysis on the submittal process for a small local environmental construction company: a case study)

  • 이도균
    • 도시과학
    • /
    • 제6권2호
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

국방과학기술 연구개발 우선순위설정에 관한 연구 (The Process of R&B Project-Priority Ordering in Defense Technology)

  • 이정동;이춘주;장원준;박홍석
    • 한국국방경영분석학회지
    • /
    • 제30권2호
    • /
    • pp.122-132
    • /
    • 2004
  • The aim of this paper is to show the process of R&D Project-Priority Ordering in the Defense Technology field. We propose specific methods (Delphi, Analytic Hierarchy Process (AHP), Scoring) to order the R&D Project-Priority. In general, to decide the priority of R&D projects most of researches depend on questionnaires which are surveyed by experts. However, it is criticized that this process cannot reflect the limitation of experience and knowledge of experts. In this process, we separate evaluators in two parts: the first is strategic experts, the second is technical experts. Evaluators can choose and evaluate the alternatives which they are familiar with, so we can obtain reliable results. Finally, based on our process of the R&D Project-Priority Ordering we formulate policy implications for managing the defense technology.