A six sigma Project for Reducing the Cost Copper Materials of the Cable Manufacturing Process

전선 제조공정의 동(銅) 재료비 개선을 위한 6시그마 프로젝트

  • Bae, Young-Ju (Dept. of Industrial & Management Engineering, Chungju National University)
  • 배영주 (충주대학교 산업경영공학과)
  • Published : 2009.03.31

Abstract

This paper considers a six sigma project for reducing the cost copper of the cable materials in a electric wire company. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variables are selected by using an input variable evaluation table: large cable, plating, and a twisted pair. DOE is utilized for finding the optimal process conditions of the three key process input variables. The implementing result of this six sigma project is enable for reducing of the 2.8% copper materials.

Keywords

References

  1. 박승옥, 김연성. 'CEO를 위한 식스 시그마 경영.' 한경사 (2006)
  2. 홍성훈, 김상부, 권혁무, 이민구. '식스 시그마 성공사례.' 품질경영학회지, Vol.27 No.3, (1999) : 202-208
  3. 화종원, 박창규, 홍수창. 'Next Generation Six Sigma for Creating Customer Value : Six Sigma 2.0.' Samsung SDS Journal of IT Service Vol.5 No2, (2008) : 103-121
  4. Harry, M.J, 'Six Sigma : A Breakthrough Strategy for Profitability.' Quality progress, May(1998) : 60-64
  5. Hoerl, R.W, 'Six sigma and the Future of the Quality profession.' Quality Progress July(1998) : 35-42
  6. Fontenot, G., Bahara, R., and Gresham, A. 'Six Sigma in Customer Satisfaction.' Quality Progress, December(1994) : 73-76