• Title/Summary/Keyword: project performance evaluation

Search Result 626, Processing Time 0.03 seconds

Efficiency Analysis on Sales Performance of NPD Projects in ICT Industry Using DEA : Focusing on Empirical Instance from 'S' corporation (자료포락분석을 이용한 ICT산업 신제품 개발 프로젝트 매출 성과에 관한 효율성 분석 : 중견기업 S사의 실례를 중심으로)

  • Jang, HeeSeok;Park, SoHyun;Kim, Seung-Chul
    • Journal of Information Technology Services
    • /
    • v.18 no.5
    • /
    • pp.209-224
    • /
    • 2019
  • When evaluating the performance of a NPD(New Product Development) project, it is common to evaluate the project performance according to the achievement of the planned goal in terms of time, quality and cost management, which are usually three main constraints of the project. The evaluation of the financial factors by which sales contributed to the return of the company is more influential. This is why companies need to increase sales and raise profits. Therefore, it is more reasonable to evaluate the sales performance of NPD projects over a certain period of time against the input costs. At this time, we can analyze the causes of inefficient projects and compare them with other projects and find out how to improve the sales performance to help the company increase its competitiveness. In this paper, we analyze the relative efficiency of the sales performance on the input of the projects by using the actual sales in the period of one year after mass production of the NPD projects of 'S' company in ICT industry. Input factors include developer resource and development cost for the NPD reported after the project has been completed, the delay weeks for the schedule targeted at the project planning stage, and the number of quality issues due to development design faults during initial mass-production. The sales figure and the contribution margin of the product after one year from the start of mass production are defined as the output factors. In this paper, we analyze the efficiency of the projects by using data envelope analysis (DEA). As a result, we found out the reason of the inefficient project of DMUs according to the differences in the characteristics of the efficient and inefficient B2B markets based on the result of DEA of NPD projects. Thus, the goal of this paper is to identify strategies for improving sales performance of NPD projects in inefficient markets.

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

SERVICE QUALITY EVALUATION INDICATORS FOR ASP-BASED PROJECT MANAGEMENT INFORMATION SYSTEM

  • Lee, Seul-Ki;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1453-1462
    • /
    • 2009
  • It is very important for performance of information system that we make an effort to raise user's satisfaction by continuously grasping user's requirement by evaluation of PMIS based on ASP service quality and reflecting this to information system. However, It is lack that developments of suitable evaluation index of PMIS based on ASP service quality. Hereupon, In this study, we propose the evaluation indicators. First, The evaluation area is classified by form the foundation of D & M IS Success Model (2003); system quality, information quality, service quality. Second, The detail evaluation item which include considerations which are gotten through investigation of the construction industry and PMIS based on ASP is grouping by form the foundation SERVQUAL which is a service quality evaluation tool proposed PZB(1988). It is suitable to evaluate PMIS based on ASP service quality in construction industry and able to evaluate various aspects.

  • PDF

The Residents' Perceptions on the Revitalization Project of Rural Centers Utilizing IPA - The Case of Janggye-myeon of Jangsu-gun - (IPA를 활용한 농촌중심지 활성화 사업에 대한 거주민 인식 - 장수군 장계면을 중심으로 -)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.3
    • /
    • pp.133-145
    • /
    • 2017
  • The purpose of this study is to assess residents' perception of the revitalization projects of the rural center and to evaluate their views of the projects' importance and their levels of satisfaction with how they have been carried out. In this study, we measured the residents' perceptions and preferences regarding these projects by using Importance-Performance Analysis (IPA). Results showed that residents' perceptions and satisfaction were the highest for the projects providing welfare facilities, even though this project has little relevance to the overall project goal. Residents were dissatisfied with construction projects such as the building of cultural facilities and urban parks, even while recognizing their importance. It is necessary to establish what problem the people perceive and to manage them appropriately. Next, the residents did not appreciate the community empowerment projects, nor did they evaluate the contents of the program positively. It can therefore be seen that the community empowerment projects have not been carried out well. Finally, the street landscape improvement project was not successfully implemented compared to other projects. The residents have negatively perceived the installation of facilities that they do not want, rarely use, or are poorly operated. this shows that the evaluation of residents is significant. They become the users of the revitalization project for the rural center. It is necessary to overcome problems such as project items chosen by professionals without local consultation and obvious design in the revitalization project of the local center. There is a need to ascertain the residents' opinion of each project and to encourage them to participate directly in the management operation.

Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective

  • Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.2
    • /
    • pp.1-24
    • /
    • 2019
  • Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.

Analyzing the Performance of Defense R&D Projects based on DEA (자료포락분석을 활용한 국방핵심기술 연구개발사업의 성과 분석)

  • Lim, Yonghwan;Jeon, Jeonghwan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.1
    • /
    • pp.106-123
    • /
    • 2019
  • Demand for performance analysis is increasing for efficient use of limited budgets such as improving investment efficiency and strategic budget allocation in accordance with the continuous increase demand of R&D budget for developing advanced weapon systems in the future battlefields. In accordance with the Act on the Performance Evaluation and Performance Management of the National R&D Projects established in March 2006, the performance analysis has been conducted for the systematic management and utilization of the R&D project performance. It was recognized as a project to achieve self-defense through strengthening the weapons system development capability, however, efficiency evaluation of Defense R&D projects was not much emphasized. Research on the efficiency analysis of defense R&D projects has been conducted in recent years, but most studies focused on corporate efficiency and productivity of defense companies. In this study, we analyzed the three-stage performance of defence R&D projects based on the logical model using the data envelope analysis(DEA) model. We also analyzed performance analysis from various perspectives through R&D type, technology classification and performance model. This study is expected to help defense department improve defense R&D projects and make decision.

A Study on the Development of National R&D Patent Performance Evaluation Indicators and Evaluation Models (국가 연구개발 특허성과 평가 지표 및 평가 모형 개발에 관한 연구)

  • Hong, Hee-Jung;Lee, Jung-Hoon
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.4
    • /
    • pp.1-9
    • /
    • 2020
  • This study draws implications by surveying and analyzing performance evaluation cases in Korea and overseas, and analyzes qualitative and quantitative performance evaluation indexes and evaluation models that fit the national R & D performance evaluation system through analysis of patent creation performance data or company status data. Also, in order to apply this to a specific group of companies with excellent exports and technical skills, we will conduct a case study on the performance analysis of patent strategy support projects based on the results of the survey. Although this study has some limitations in developing performance evaluation indicators due to the limited scope of business or business characteristics of the patent strategy support project, the qualitative evaluation system can be reviewed through previous studies and domestic and overseas case studies. Due to the problem of accessing and collecting data related to the performance of the support project, there is a limitation that performance analysis cannot be performed at a sufficient level. Nevertheless, after the completion of R&D support projects and patent strategy support projects, follow-up performance analysis can be performed through follow-up surveys. It is expected to be possible.

A Study on Performance Evaluation Model for Information Efficiency Measurement (정보화 효율성 측정을 위한 성과평가모델에 관한 연구)

  • 유은숙;정기원
    • The Journal of Society for e-Business Studies
    • /
    • v.9 no.2
    • /
    • pp.33-50
    • /
    • 2004
  • This paper presents the evaluation model which is included in a quantitative evaluation methodology for evaluation processes of validity and effectiveness of information budget investment and improving conformance of ROI(Return On Investment). That is, the right efficiency targets of information investment for the development project to GDOC (Government electronic Document Distribution Center), and KPls(Key Performance Indexes) which enable to evaluate objectively effectiveness in the preliminary and post evaluation phases are developed, and then the results were come out by practical investigation study using quantitative evaluation methodology.

  • PDF

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

Teaching-Learning Model of Convergence Project Based on Team Teaching in Engineering Education (공학교육에서의 팀티칭기반 융합프로젝트중심 교수학습모형의 개발)

  • Park, Kyungsun
    • Journal of Engineering Education Research
    • /
    • v.17 no.2
    • /
    • pp.11-24
    • /
    • 2014
  • The purpose of this study is to develop a teaching-learning model of convergence project based on team teaching. Based on development research methodology which explored a university case, the teaching-learning model was developed including three phases such as preparation, planning, and implementation & evaluation. The preparation phase has three steps as follows: to organize team teaching faculty; to develop convergence projects cooperated by industry and university; and to design instructions based on supporting convergence projects. The last step of preparation phase consists of five design activities of: (1) instructions and teaching contents; (2) communication channel among faculty members; (3) feedback system on students' performance; (4) tools to support learners' activity; and (5) evaluation system. The planning phase has two steps to analyze learners and to introduce and modify instruction and themes of convergence projects. The implementation & evaluation phase includes five steps as bellow: (1) to organize project teams and match teams with faculty members; (2) to do team building and assign duties to students of a team; (3) to provide instruction and consulting to teams; (4) to help teams to conduct projects through creative problem solving; and (5) to design mid-term/final presentation and evaluation. Lastly, the research implications and limitations were discussed for future studies.