• Title/Summary/Keyword: project effectiveness

Search Result 853, Processing Time 0.028 seconds

The Characteristics of Fatal Accidents Relative to Fall at Construction Job Site (건설공사 추락 중대재해 발생특성 분석)

  • Kwon, Jin-Seok;Choi, Seung-Mo;Son, Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.710-713
    • /
    • 2007
  • This paper presents the findings obtained from several series of analysis on the fatal accident, which are maintained by Korean Production Household Mascot Safety Industrial Complex, relative to fall. The fall accidents occurred in 5 years, from 2002 to 2006, were analyzed. The statistic relative to the fatal accidents analyzed according to different classifications such as accident rate, project amount, project type, cause, type of occupation. years of experience, and time in a day. This research would contribute to ensure the effectiveness of safety policy so as to enhance worker safety. In addition, cluster analysis was applied to find the major contributors on the fall accidents. Cross referencing between occupation and type of work, and occupation and cause were established so that the occurrence statistics of fall accidents were investigated.

  • PDF

Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA (ODA 지원 베트남 중부 꽝남성 종합병원의 거주후 평가)

  • Kwon, Soon Jung;Yu, Yeo Kyoung;Kim, Jihyun;Bang, Seol Ah
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.1
    • /
    • pp.39-49
    • /
    • 2016
  • Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.

A Series of Process of Electrical Integration and Function Test for Flight Model of STEP Cube Lab. (큐브위성 STEP Cube Lab. 비행모델의 전자조립 및 기능시험 과정)

  • Jeong, Hyeon-Mo;Chae, Bong-Geon;Han, Sang-Hyuck;Oh, Hyun-Ung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.44 no.9
    • /
    • pp.814-824
    • /
    • 2016
  • The mission objective of STEP Cube Lab. (Cube Laboratory for Space Technology Experimental Project) classified as a pico-class satellite is to find space core technologies researched at domestic industry or university and to verify these technologies on mission orbit. To implement this objective, system level electrical integration and function test (EIT) by using developed flight software were performed in compliance with system requirements. And the effectiveness of the flight model (FM) was verified through launch and thermal vacuum test at acceptance level. This paper will introduce a series of process of electrical function tests for FM EIT, launch and thermal vacuum tests.

Regional Economic Impacts Induced by u-City Construction in Wha-sung and Dong-tan City (u-City 구축사업의 지역경제적 파급효과에 관한 연구)

  • Lee, Heon-Yeong;Choi, Yeseul;Lim, Up
    • Journal of Information Technology Services
    • /
    • v.11 no.4
    • /
    • pp.25-37
    • /
    • 2012
  • In recent year, the u-City construction projects which integrate IT technology into urban infrastructures are being pushed forward by many local governments. These projects contain various purposes in an aspect of regional economy : to reinforce a competitiveness of region by increasing efficiency of urban managements and to revitalize regional economy by stimulating the regional high-tech industries that related to u-City construction. In this context, regional economic impact assessment of u-City construction projects is particularly important because, it give us information about effectiveness of u-City construction policy as a stimulus of regional high-tech industries and the policy feasibility of u-City construction projects that can be a base of public projects. However, it is challenging to assess the impact of u-City projects on regional economy properly due to a lack of understanding about industrial classification, and specific industrial inputs related to u-City construction. In this study, we suggest u-City industrial classifications, and specific-industrial inputs induced by u-City construction projects based on associated legislations, business report for a u-City construction, and results from previous studies. Using these classification and industrial input, we also investigate the regional economic impacts of a u-City construction project in Wha-sung and Dong-tan cities employing Input-output analysis. The empirical results suggests that u-City industries have relatively high in production inducement, and value added inducement compared to input of other industrial sectors. These results indicate that regional economic impact of a Wha-sung and Dong-tan u-City construction project are relatively high, but economic impacts of u-City construction projects vary according to the regional industrial structure, and the specific expense accounts of u-City construction projects.

Assessment of Monitored Natural Attenuation as Remediation Approach for a BTEX Contaminated Site in Uiwang City (의왕시내 BTEX 오염 부지에서의 자연 정화법 이용 적합성 고찰)

  • 이민효;윤정기;박종환;이문순;강진규;이석영
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 1999.04a
    • /
    • pp.149-156
    • /
    • 1999
  • In the United States (U.S.), the monitored natural attenuation (MNA) approach has been used as an alternative remedial option for organic and inorganic compounds retained in soil and dissolved in groundwater. The U.S. Environmental Protection Agency (EPA) defines the MNA as“in-situ naturally-occurring processes include biodegradation, diffusion, dilution, sorption, volatilization, and/or chemical and biochemical stabilization of contaminants and reduce contaminant toxicity, mobility or volume to the levels that are protective of human health and the environment”. The Department of Soil Environment. National Institute Environmental Research (NIER) is in the process for demonstrating the MNA approach as a potential remedial option for the BTEX contaminated site in Uiwang City. The project is charactering the research site in terms of the nature and extend of contamination, biological degradation rate, and geochemical and hydrological properties. The microbial-degradation rate and effectiveness of nutrient and redox supplements will be determined through laboratory batch and column tests. The geochemical process will be monitored for determining the concentration changes of chemical species involved in the electron transfer processes that include methanogenesis, sulfate and iron reduction, denitrification, and aerobic respiration. Through field works, critical soil and hydrogeologic parameters will be acquired to simulate the effects of dispersion, advection, sorption, and biodegradation on the fate and transport of the dissolved-phase BTEX plume using Bioplume III model. The objectives of this multi-years research project are (1) to evaluate the MNA approach using the BTEX contaminated site in Uiwang City, (2) to establish a standard protocol for future application of the approach, (3) to investigate applicability of the passive approach as a secondary treatment remedy after active treatments. In this presentation, the overall picture and philosophy behind the MNA approach will be reviewed. Detailed discussions of the site characterization/monitoring plans and risk-based decision-making processes for the demonstration site will be included.

  • PDF

A Study on the Collaboration Learning Effect of BIM/IPD Through Constructivism Learning Method (구성주의 학습 방법을 통한 BIM/IPD협업 학습효과에 대한 연구)

  • Jin, Juan;Choi, Jungsik;Kim, Inhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.3-16
    • /
    • 2021
  • The purpose of this study is to verify the practical effectiveness of the constructivism education theory in building information modeling (BIM)/integrated project delivery (IPD) collaboration education by determining education methods that are most relevant to collaboration in the interaction process. We propose a BIM training model that enhances students' satisfaction in class and collaboration. We aim to identify interrelationships between BIM collaboration education and constructivism theories, examining constructivism methods in BIM/IPD classes to discern which are the most suitable for improving and enhancing collaboration and the proposed education model.

A Study on the Building Information Modeling Collaboration Strategy for Railway Infrastructure - Case Study and Survey - (철도 인프라 BIM 협업 전략에 관한 연구 - 싱가포르 사례 및 국내 전문가 설문조사를 기반으로 -)

  • Kim, Seong-Ah;Kim, Jin-Man;Shin, Min-Ho
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.116-127
    • /
    • 2022
  • Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.

A Strategy for Inference Control of Official Statistics - Centering around the Patent Application Expense Support Project - (공식통계의 추론통제 전략 - 정부의 특허경비지원사업 사례를 중심으로 -)

  • Lee, Duck-Sung;Choi, In-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.11
    • /
    • pp.199-211
    • /
    • 2009
  • Official statistics which are collected for governments and the community can be used to assess the effectiveness of governments' policies and programs. Thus, official statistics should be collected and presented based on correct findings. Erroneous official statistics will lead to lower quality results in assessing those policies and programs. Many statistical agencies, today, use on-line analytical processing (OLAP) data cubes which support OLAP tasks like aggregation and subtotals as a key part of their dissemination strategy of official statistics. Confidentiality protection in data cubes also should be made. However, sensitive parts of data cubes including micro data may be disclosed by malicious inferences. The authors have suggested an inference control process in OLAP data cubes which preventing erroneous cube creating and securing cubes against privacy breaches. The objective of this study is to establish a strategy for inference control of official statistics using the inference control process by taking the case of the Patent Application Expense Support Project.

Design of dashboard conceptual model for digital twin based smart pipe health monitoring (디지털 트윈 기반 스마트 파이프 상태 감시를 위한 대시보드 개념모델 설계)

  • Hong, Phil-Doo;Kim, Nam-ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.389-391
    • /
    • 2022
  • Efforts by the Ministry of Environment and local governments in Korea are continuing to manage the aging of water supply and sewage buried underground. With the support of the Korea Institute of Environmental Industry and Technology's water and sewage innovation technology development project, it is conducting a project to predict and exchange accidents due to aging, and to apply smart functions to new buried pipes. As one of these studies, this paper proposes the design of a dashboard concept model for digital twin-based smart pipe health monitoring, one of the key features of the entire study. Since remote control and monitoring are one of the main functions, distributed transmission and reception agents are deployed to visualize monitoring situations in real time and to increase user affinity by deploying intuitive UI. To validate the design of this proposed special digital twin based smart pipe state monitoring, we construct the conceptual model level and measure the agent effectiveness to validate its excellence.

  • PDF

Opportunity Tree Framework Design For Optimization of Software Development Project Performance (소프트웨어 개발 프로젝트 성능의 최적화를 위한 Opportunity Tree 모델 설계)

  • Song Ki-Won;Lee Kyung-Whan
    • The KIPS Transactions:PartD
    • /
    • v.12D no.3 s.99
    • /
    • pp.417-428
    • /
    • 2005
  • Today, IT organizations perform projects with vision related to marketing and financial profit. The objective of realizing the vision is to improve the project performing ability in terms of QCD. Organizations have made a lot of efforts to achieve this objective through process improvement. Large companies such as IBM, Ford, and GE have made over $80\%$ of success through business process re-engineering using information technology instead of business improvement effect by computers. It is important to collect, analyze and manage the data on performed projects to achieve the objective, but quantitative measurement is difficult as software is invisible and the effect and efficiency caused by process change are not visibly identified. Therefore, it is not easy to extract the strategy of improvement. This paper measures and analyzes the project performance, focusing on organizations' external effectiveness and internal efficiency (Qualify, Delivery, Cycle time, and Waste). Based on the measured project performance scores, an OT (Opportunity Tree) model was designed for optimizing the project performance. The process of design is as follows. First, meta data are derived from projects and analyzed by quantitative GQM(Goal-Question-Metric) questionnaire. Then, the project performance model is designed with the data obtained from the quantitative GQM questionnaire and organization's performance score for each area is calculated. The value is revised by integrating the measured scores by area vision weights from all stakeholders (CEO, middle-class managers, developer, investor, and custom). Through this, routes for improvement are presented and an optimized improvement method is suggested. Existing methods to improve software process have been highly effective in division of processes' but somewhat unsatisfactory in structural function to develop and systemically manage strategies by applying the processes to Projects. The proposed OT model provides a solution to this problem. The OT model is useful to provide an optimal improvement method in line with organization's goals and can reduce risks which may occur in the course of improving process if it is applied with proposed methods. In addition, satisfaction about the improvement strategy can be improved by obtaining input about vision weight from all stakeholders through the qualitative questionnaire and by reflecting it to the calculation. The OT is also useful to optimize the expansion of market and financial performance by controlling the ability of Quality, Delivery, Cycle time, and Waste.