Browse > Article
http://dx.doi.org/10.15682/jkiha.2016.22.1.39

Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA  

Kwon, Soon Jung (Department of Architecture, Ajou University)
Yu, Yeo Kyoung (Department of Architecture, Chungang University)
Kim, Jihyun (AURi(Architecture & Urban Research Institute))
Bang, Seol Ah (KOICA (Korea International Cooperation Agency))
Publication Information
Journal of The Korea Institute of Healthcare Architecture / v.22, no.1, 2016 , pp. 39-49 More about this Journal
Abstract
Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.
Keywords
Official Development Assistance; Hospital in Quang Nam Province of Vietnam; Post Occupancy Evaluation;
Citations & Related Records
연도 인용수 순위
  • Reference
1 KOICA website homepage, 2014, 2015 http://www.koica.go.kr
2 갈렙앤컴퍼니, 2006.12, 베트남 중부지역 종합병원건립 타당성 조사, 최종보고서
3 보미종합건설, 2012.06, 베트남 중부지역 종합병원 건립사업 준공보고서
4 보미종합건설, 2013.04, 베트남 꽝남중앙종합병원 설계 하자현황
5 한국국제협력단, 1998.02, 베트남 병원건축사업 사후평가보고서
6 한국국제협력단, 2003.06, .베트남 중부지역 병원건립사업 실시협의 결과보고서
7 한국국제협력단, 2006.03, 베트남 중부지역 종합병원건립사업 사업형성조사 결과보고서
8 한국국제협력단, 2006.08, 베트남 중부지역 종합병원 건립사업 2차 사전조사 결과보고서
9 한국국제협력단, 2006.09, 베트남 중부지역 종합병원 건립사업 1차 실시협의 결과보고서
10 한국국제협력단, 2012.12, 베트남 중부지역 종합병원 건립사업 종료평가 결과보고서
11 한국국제협력단, 2014.04, 베트남 꽝남 중앙 종합병원 하자상태 현황조사 보고서
12 한국국제협력단, 2015.10, 2014 대외무상원조실적 통계
13 한국국제협력단, 2014.10, 2013 대외무상원조실적 통계
14 한국국제협력단, 2013.07, 2012 대외무상원조실적 통계