• Title/Summary/Keyword: project activity

Search Result 846, Processing Time 0.027 seconds

A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.12-15
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

Towards More Accurate Space-Use Prediction: A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.349-352
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

  • PDF

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

A Heuristic Algorithm for Resource-Constrained Multi - Project Scheduling (자원제약하의 복수 프로젝트 일정계획을 위한 휴리스틱 알고리즘)

  • Kong, Myung-Dal;Kim, Jung-Ja
    • IE interfaces
    • /
    • v.13 no.1
    • /
    • pp.110-119
    • /
    • 2000
  • Resource-constrained project scheduling is to allocate limited resources to activities to optimize certain objective functions and to determine a start time for each activity in the project such that precedence constraints and resource requirements are satisfied. This study suggests a multi-project scheduling model which can level work loads, make the most of production capacity and restrain the delay of delivery by developing a heuristic algorithm which minimizes the project completion time and maximizes the load rate under resource constraints.

  • PDF

Efficient Synthesis of Novel 4'-Trifluoromethyl-5'-norcarbocyclic Purine Phosphonic Acid Analogs by Using the Ruppert-Prakash Reaction

  • Kim, Seyeon;Kim, Eunae;Yoo, Jin Cheol;Hong, Joon Hee
    • Bulletin of the Korean Chemical Society
    • /
    • v.35 no.9
    • /
    • pp.2743-2748
    • /
    • 2014
  • Novel 4'-trifluoromethyl-5'-norcarbocyclic purine phosphonic acid analogs were efficiently synthesized from commercially available 1,3-dihydroxy cyclopentane (5). Trifluoromethylation was successfully performed by using the Ruppert-Prakash reaction. The purine nucleosidic bases were efficiently coupled by using the Mitsunobu reaction. The synthesized adenosine phosphonic acids analogs 13 and 16 were screened for antiviral activity against human immunodeficiency virus-1 (HIV-1). Adenine derivative 13 exhibited significant anti-HIV-1 activity.

Project Scheduling Problem with Resource Constraints Minimizing Cost (자원비용을 고려한 프로젝트 스케듈링에 관한 연구)

  • 서순근;최종덕
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.23
    • /
    • pp.19-25
    • /
    • 1991
  • In this paper, constrained resource project scheduling problems schedule project activities subject to finite constraints on the availability of non-storable resource. Further, resources are assumed to be available per period in constant amounts, and are also demanded by an activity in constant amounts throughout the duration of the activity. We describe formulation which minimizes the combined cost of fluctuations in resource demand and delay of project completion. Cost bounding procedures are augmented by dominance relationships presented as theorems. This paper presents algorithm for solving the problem. And numerical examples are presented. Sensitivity analysis to evaluate the effect of changes of cost efficients is conducted.

  • PDF

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

SRF LINAC FOR FUTURE EXTENSION OF THE PEFP

  • Kim, Han-Sung;Kwon, Hyeok-Jung;Seol, Kyung-Tae;Jang, Ji-Ho;Cho, Yong-Sub
    • Nuclear Engineering and Technology
    • /
    • v.46 no.2
    • /
    • pp.247-254
    • /
    • 2014
  • A study on the superconducting RF linac is underway in order to increase the beam energy up to 1 GeV by extending the Proton Engineering Frontier Project (PEFP) 100-MeV linac. The operating frequency of the PEFP superconducting linac (SCL) is 700 MHz, which is determined by the fact that the frequency of the existing normal conducting linac is 350 MHz. A preliminary study on the beam dynamics showed that two types of cavities with geometrical betas of 0.50 and 0.74 could cover the entire energy range from 100 MeV to 1 GeV. An inductive output tube (IOT) based RF system is under consideration as a high-power RF source for the SCL due to its low operating voltage and high efficiency. As a prototyping activity for a reduced beta cavity, a five-cell cavity with a geometrical beta of 0.42 was designed and fabricated. A vertical test of the prototype cavity at low temperatures was performed to check the performance of the cavity. The design study and the prototyping activity for the PEFP SCL will be presented in this paper.

Characteristics and Utilization of Peer-evaluation and Self-evaluation of Team Activities in University Project Based Classes (대학의 프로젝트기반 수업에서 팀 활동에 대한 동료평가와 자기평가의 특성 및 활용방안)

  • Cho, Soosun
    • Journal of Engineering Education Research
    • /
    • v.25 no.1
    • /
    • pp.55-64
    • /
    • 2022
  • In this paper, the characteristics of peer-evaluation and self-evaluation of team activity participation in project-based learning and their usability were investigated. The characteristics of peer-evaluation and self-evaluation are as follows. First, in peer-evaluation and self-evaluation of project-based learning, the correlation between the two evaluation scores was very high. When students' scores from their peers correlate very well with the scores they give themselves, it means that they apply the same criteria to their peers and to themselves when evaluating team activity. Second, there was no difference in peer-evaluation and self-evaluation scores between groups with different written test scores. The fact that peer-evaluation and self-evaluation scores do not change according to academic ability shows that the two evaluation areas are independent. Third, the self-evaluation score in project-based learning is statistically significantly higher than the score received from peers. This raises doubts about the fairness of self-evaluation. Therefore, in this paper, it is suggested that self-evaluation of team activities in project-based learning is carried out together with peer-evaluation, but only peer-evaluation is reflected in credits.

In vivo determination of the gap2 gene promoter activity in Giardia lamblia

  • YANG Hye-Won;KIM Juri;YONG Tai-Soon;PARK Soon-Jung
    • Parasites, Hosts and Diseases
    • /
    • v.44 no.1 s.137
    • /
    • pp.21-26
    • /
    • 2006
  • A shuttle vector for Escherichia coli and Giardia lamblia was modified to produce a reporter plasmid, which monitors the expression of prescribed gene in G. lamblia by measuring its luciferase activity. Promoter regions of the gap2 gene, one of the genes induced during encystation, were cloned into this plasmid, and the resultant constructs were then transfected into trophozoites of G. lamblia. Transgenic trophozoites containing one of the 3 gap2-luc reporters were induced to encystation, and characterized with respect to gap2 gene expression by measuring their luciferase activities. Giardia containing a gap2-luc fusion of 112-bp upstream region showed full induction of luciferase activity during encystation.