• 제목/요약/키워드: project activities

검색결과 1,437건 처리시간 0.028초

DEVELOPMENT OF A RESOURCE LEVELING MODEL USING OPTIMIZATION

  • Jin-Lee Kim;Ralph D. Ellis
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.558-563
    • /
    • 2005
  • This paper presents a GA-based optimal algorithm for a resource leveling model that levels the resources of a set of non-critical activities experiencing conflicts simultaneously up to an assumed level of resource rates specified by the planner using a pair-wise comparison of the activities being considered. A parameter called the future float is adopted and applied as an indicator for assigning leveling priorities to the sets of activities experiencing conflicts. A construction project network example was worked out to demonstrate the performance of the proposed method. The histogram obtained using the algorithm proposed was shown to be the same as, or very close to that produced by the existing resource leveling method based on the least total float rule, which shifts non-critical activities individually.

  • PDF

경량전철사업을 위한 실용적 SEMP 개발에 관한 연구 (A study on the practical Systems Engineering Management Plan for the LRT Project)

  • 최요철;한석윤;차기호;정수영;배준호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.247-254
    • /
    • 2011
  • This paper is a study on the practical Systems Engineering Management Plan(SEMP) for the LRT Project. A SEMP shall be developed and applied to define and manage the systems engineering activities during the beginning of LRT Project. This paper is addressed contents and description of the practical systems engineering management plan based on the existing practices about system engineering management plan in LRT Project domain as well as the systems engineering standard as MI-STD 499A, IEEE 1220 etc. In the early stage of a LRT Project, An acquirer should provide a Systems Engineering Plan(SEP), and a contractor should summit a Systems Engineering Management Plan as the SEP in proposal. This addressed the SEMP as an aspect of the system and sub-systems supplier to systematically and effectively accomplish the systems engineering activities in LRT Project generally.

  • PDF

부분적으로 반복되는 프로젝트를 위한 프로젝트 내$\cdot$외 학습을 이용한 프로젝트기간예측과 위험분석 (Project Duration Estimation and Risk Analysis Using Intra-and Inter-Project Learning for Partially Repetitive Projects)

  • 조성빈
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.137-149
    • /
    • 2005
  • This study proposes a framework enhancing the accuracy of estimation for project duration by combining linear Bayesian updating scheme with the learning curve effect. Activities in a particular project might share resources in various forms and might be affected by risk factors such as weather Statistical dependence stemming from such resource or risk sharing might help us learn about the duration of upcoming activities in the Bayesian model. We illustrate, using a Monte Carlo simulation, that for partially repetitive projects a higher degree of statistical dependence among activity duration results in more variation in estimating the project duration in total, although more accurate forecasting Is achievable for the duration of an individual activity.

농어촌도로사업이 지역사회 주민의 사회.경제 활동에 미치는 영향 (Impacts of Rural Road Project on the Social and Economic Activities of Community People)

  • 홍찬선;임상봉;허유만
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2003년도 학술발표논문집
    • /
    • pp.95-98
    • /
    • 2003
  • The objectives of the study are to analyze the impacts of rural road project on the social and economic activities of community people, offer basic data to perform evaluation of the project, and suggest future directions of the project. Research methodology adopted is a questionnaire method. There were interviewed 281 adult residents selected from 34 villages in Yeongdong-gun(mountainous), Miryang-si(middle), and Gochang-gun(plain). Results of the study are as follows: 1) Increase of income and land prices in mountainous and middle regions by the rural road project is higher than in plain; 2) Most inconvenient road expressed by the interviewee is the one linking farm and residence and 3) The problems of rural roads derived are narrowness, unpavement and partial pavement, unreliable maintenance, and long construction time. In order to meet the community needs on rural roads, it may be necessary that community people participate in the process of the project. And it is desirable to put priority on expanding and paving existing roads rather than constructing new one.

  • PDF

Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

AHP를 이용한 프로젝트 선정에 관한 실증적 연구 (An Study on Project Selection based on Analytic Hierarchy Process)

  • 김주완;이욱기;김판수
    • 대한안전경영과학회지
    • /
    • 제9권2호
    • /
    • pp.195-214
    • /
    • 2007
  • The purpose of this study is to explore the applicability of AHP(Analytic Hierarchy Process) to select more productive projects among various proposed projects in a particular company. To achieve this research objective, the characteristics of project evaluation and selection are first reviewed with respect to when, where, and how the decision is made. Then the theoretical basis of the AHP is briefly reviewed along with its mathematical underpinnings to construct the framework of project evaluation and selection. To be more specific, the evaluation and selection criteria were reorganized in the AHP-based framework to make the process of project evaluation and selection more productive. Project evaluation and selection is one of the most important activities for the most companies to be more advantageous in the market. Despite the importance of decision making process of project selection, not many of how to choose the best project were suggested as the reliable project selection methods in the industries. It may be because it involves various activities related to conflict resolution among different evaluation criteria, high uncertainties of market, and the unclear tradeoff among various project objectives. Furthermore, the decision, once made at this point, tends to be irrevocable until the whole process turns out to be a complete success or failure. As the result, the AHP method showed better financial performance rather than the traditional method in a case study.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF

The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait

  • AL-NASSAFI, Nawaf Marzouq
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제9권3호
    • /
    • pp.53-63
    • /
    • 2022
  • Despite the relationship between cash flow, financial management, and project performance, no study examined the mediating role of financial management on the relationship between cash flow and construction project performance, especially in Kuwait. The goal of this study was to examine the impact of cash flow fluctuations on construction project performance, as well as the role of financial management in mediating this relationship. To accomplish these goals, the researcher employed a descriptive-analytical method to create a questionnaire of 31 items. The study's sample was chosen at random and includes (181) project managers and firm owners from contractors' companies in Kuwait. The study found a statistically positive and significant effect of cash flow variation on project performance from the perspective of Kuwaiti contractors at the significance level (0.05), as well as a mediated role of financial management in the relationship between cash flow variation and project performance. The research came up with a number of recommendations based on the findings, including the need for contractors to have a better understanding of cash flow to arrange project activities correctly and efficiently. Further studies may be included into the effect of cash flow forecasting (planning) and financial management (control) on various construction activities.

비대면 학습환경에서 프로젝트 기반 학습(Project-Based Learning: PBL) 학습성과 및 만족도 분석 (An Analysis of Learning Outcomes and Learning Satisfaction of Project-Based Learning in non-face-to-face Learning Environment)

  • 이윤경;김은진
    • 한국콘텐츠학회논문지
    • /
    • 제21권6호
    • /
    • pp.814-825
    • /
    • 2021
  • 본 연구의 목적은 S 여자대학교의 교수학습지원센터에서 운영하는 비대면 프로젝트 기반 학습(Project-Based Leaning: PBL)강좌에 참여한 학습자의 학습성과 및 학습 만족도에 대해 알아보고자 실시하였다. 본 연구를 위한 설문지는 학습전략(동료학습 전략, 비판적 검토 전략, 정교화 전략, 초인지 전략 및 온라인 프로젝트 활동)과 학습 만족도에 관한 질문 총 28개로 구성되었다. 설문조사를 위하여 2020학년도 프로젝트 기반 학습강좌에 참여한 학습자 중 300명(1학기 210명, 2학기 90명)이 참여하였다. 사전-사후 설문조사 결과 1학기와 2학기 모두 사후 설문조사 결과의 평균이 더 높게 나타났다. 두 학기 모두 프로젝트 기반 학습 수강 후에 학습전략 평균이 향상하였다. 프로젝트 활동이 학습활동에 도움이 되며, 수업에 참여도를 높인다는 결과를 확인하였다. 이를 바탕으로 심화된 비대면 학습환경에서의 PBL 연구가 지속되어야 함을 시사한다.