• Title/Summary/Keyword: procurement management

Search Result 484, Processing Time 0.024 seconds

Importance, Support and Application for Contract Foodservice Management Company′s Infra-System in the Viewpoint of Headquarters and Branch Office (위탁급식전문업체의 운영관리 인프라 시스템에 대한 본사와 업장 측면에서의 중요도, 지원도, 활용도 탐색)

  • 양일선;박문경;한경수;채인숙;박소현;이해영
    • Korean Journal of Community Nutrition
    • /
    • v.9 no.2
    • /
    • pp.233-240
    • /
    • 2004
  • This study was design to grope the suggestions leading synergic effects by bridging the gap between headquarters and branch office, and so to identify the infra-system of contract foodservice management company (CFMC) necessary for operating any kind of branch office including school, hospital and business and industry (B&I). Among 8 categories consisted of infra-system in CFMC, 'C8. Evaluation & analysis for branch office's operation' was the most important category in the headquarter's viewpoint, while 'C3. Sanitation management system' was the most important category in branch office's viewpoint. In support and application, 'C3. Sanitation management system' was the highest category in both headquarters and branch offices including school, hospital and B&I. As a result of analysis on gap between main and branch office in importance, support and application in 8 categories, the efforts of communication and community of perception for infrastructure were needed, because 'C4. Education & training for human resource management (HRM) system' and 'C8. Evaluation & analysis for branch office's operation' in importance, 'C2. Menu management system', 'C4. Education & training for HRM system', 'C6. Facility & utility support system' and 'C8. Evaluation & analysis for branch office's operation' in support had a gap. Correlation analysis to grasp the relation between importance of infra-system and headquarters' support or branch office's application showed that headquarters's importance and support were correlated positively in 'C3. Sanitation management system', 'C6. Facility & utility support system', 'C7. Customer satisfaction management system' and 'C8. Evaluation & analysis for branch office's operation' and branch office's importance and application were correlated positively in 'C1. Procurement & food processing system', 'C5. Management Information system', 'C7. Customer satisfaction management system' and 'C8. Evaluation & analysis for branch office's operation'. Lastly, 'C6. Facility & utility support system' in the branch office of school and hospital and 'C2. Menu management system' in the branch office of B&I were high in importance, low in support and application, therefore Intensive support for these categories was needed. In conclusion, continuous check and improvement for categories, which were identified as an urgent problems to be solved in this study, among infra-structure qualifying for CFMC, would enable contract foodservice industry that has grown quantitatively till now to grow qualitatively.

A Study on the Productivity Improvement of the Dicing Blade Production Process (다이싱 블레이드 제조공정의 생산성향상에 관한 연구)

  • Mun, Jung-Su;Park, Soo-Yong;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.147-155
    • /
    • 2016
  • Industry 4.0's goal is the 'Smart Factory' that integrates and controls production process, procurement, distribution and service based on the fundamental technology such as internet of the things, cyber physical system, sensor, etc. Basic requirement for successful promotion of this Industry 4.0 is the large supply of semiconductor. However, company I who produces dicing blades has difficulty to meet the increasing demand and has hard time to increase revenue because its raw material includes high price diamond, and requires very complex and sensitive process for production. Therefore, this study is focused on understanding the problems and presenting optimal plan to increase productivity of dicing blade manufacturing processes. We carried out a study as follows to accomplish the above purposes. First, previous researches were investigated. Second, the bottlenecks in manufacturing processes were identified using simulation tool (Arena 14.3). Third, we calculate investment amount according to added equipments purchase and perform economic analysis according to cost and sales increase. Finally, we derive optimum plan for productivity improvement and analyze its expected effect. To summarize these results as follows : First, daily average blade production volume can be increased two times from 60 ea. to 120 ea. by performing mixing job in the day before. Second, work flow can be smoother due to reduced waiting time if more machines are added to improve setting process. It was found that average waiting time of 23 minutes can be reduced to around 9 minutes from current process. Third, it was found through simulation that the whole processing line can compose smoother production line by performing mixing process in advance, and add setting and sintering machines. In the course of this study, it was found that adding more machines to reduce waiting time is not the best alternative.

Development of the Evaluation Criteria for the Usefulness of Biological Resources (생물자원의 유용성 평가 기준 개발)

  • Lee, Hyun-Woo;Kim, Dong-Wook;Won, Hyo-Sig
    • Journal of Environmental Policy
    • /
    • v.12 no.4
    • /
    • pp.3-21
    • /
    • 2013
  • This research aims to analyze the usefulness of biological resources from the perspective of the users from various angles and after taking these factors into consideration, provide policy implication and scientific criteria for judging and choosing useful biological resources. Among biological resources defined in CBD, the subject of the research was confined to the biological resource as a unit which can be actually used in benefit sharing and trade. Also, among diverse values of biological resources, the usefulness was assessed focusing on the utility value and scarcity. Usefulness was rated on a scale of 1 to 5 (5 grades). The rating was adjusted for the biological resources that need to be managed as a part of the management policy. It is expected that the criteria of this study will be useful for the following: (1) the procurement of biological resources in the need for primary protection and management (2) the utilization of secured biological resources by analyzing their utility value and using them in biological resources industry (3) securement of sovereignty over biological resources, such as prior access permit under the Nagoya protocol, through management and protection of biological resources in Korea.

  • PDF

Aquisition System of Developed Countries and Operational Planning Research of DAPA Commissione (선진국의 획득조직 현황과 방위사업감독관 운용방안 연구)

  • Hwang, Gwang-Tak
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.426-432
    • /
    • 2017
  • This paper analyzed the status of defense acquisition organizations, the defense acquisition system, and management strategies for each field in major developed countries. The current state of defense procurement organizations in major developed countries would be applied to identify the operational systems in domestic market. Effective management of defense commissioners on the management of each sector is being carried out by the government and company. We believe that it will be possible to establish transparency, credibility, and expertise from the perspective of third parties through securing the current pre - verification procedure. In conclusion, we believe that the operation of the Defense Business Supervisor enabled the establishment of a pre-supervision system for the entire defense business, and an environment to ensure maximum independence.

A Methodology of Implementing SOA and BPM Based Information Systems : A Case Study on Product BOM Management under Customer-Oriented Make-To-Order Manufacturing Environments (SOA 및 BPM 기반의 정보시스템 구축 방법론: 고객지향 수주생산 환경에서의 제품 BOM 관리 적용사례)

  • Shin, Jung-Bum;Kim, Jae-Gyun;Jang, Gil-Sang
    • The Journal of Information Systems
    • /
    • v.18 no.1
    • /
    • pp.77-95
    • /
    • 2009
  • In customer-oriented make-to-order manufacturing environments, the works of BOM changes due to the changes of product specification and engineering are closely connected with almost all departments such as sales, engineering, production, procurement, cost, after service, etc within an enterprise. So, the contents of BOM changes must be instantly reflected on the related works among the departments. To effectively process these complex works of BOM changes, types of changes on product specification and engineering and types of BOM changes linked with those must be systematically defined, classified and managed by information systems. Thus, it is necessary to introduce solutions such as BPM and SOA in order to efficiently deal with complex business processes like BOM change management. This paper proposes a methodology of constructing information systems based on BPM and SOA. The proposed methodology defines the relationship between processes of BPM for definition, execution, monitoring, etc of business processes and services of SOA for connection among information systems within an enterprise, and presents a scheme of practically applying BPM and SOA solutions to actual business works. To show an utilization of the proposed methodology, the prototype system for product BOM management is implemented in order to efficiently deal with the works of BOM changes due to the changes of product specification and engineering.

Strengthening Plant Market Competitiveness in the Construction Firms;A Corporate Strategy (해외 플랜트 건설 분야의 현황 분석을 통한 경쟁력 강화전략 도출)

  • Lee, Tai-Sik;Lee, Kkoch-Nim;Koo, Ja-Kyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.317-321
    • /
    • 2006
  • Construction companies do not take necessary steps for sudden change in the Construction market, In order to over come the problem, it is necessary to make Corporate Strategy through correct Market analysis. If construction companies want to secure continuance profits, they must prepare proper strategy to advance into plant market. This research performs both external and internal environment analysis, External environment analysis is for overseas construction market and advanced foreign companies, and internal environment analysis is the current status of domestic companies. The research identifies some of the Key points, growth in foreign plant market is huge, but domestic companies do not have abundant construction experience on the same field and also they lack in high value-added techniques. They are far behind the advanced companies; they don't have proper skills of Procurement, engineering and project management. This study suggests a strategy for domestic companies to take necessary step to advance into plant construction market.

  • PDF

Research Trends of Scheduling Techniques for Domestic Major Industries (국내 주요 산업별 스케줄링 기법의 연구동향)

  • Lee, Jae-yong;Shin, Moonsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.1
    • /
    • pp.59-69
    • /
    • 2018
  • The up-to-date business environment for Korean manufacturers is very complex and rapidly changing. Especially, the companies have faced with various changes derived from small quantity batch production, diversification of customer demands, and short life cycles of products. Consequently, the Korean manufacturing companies are in need of more efficient production planning and scheduling techniques. In this paper, the research trend of scheduling techniques is investigated to provide relevant information to researchers in this field. Furthermore, some implications for future researches are presented regarding literatures published in Korea over the last 10 years. This paper presents an entire investigation into Korean research works on scheduling (2,569 papers) that are published from 2007 to 2016. Especially, detailed analysis was carried out in the following three industry : 1) semiconductor, 2) shipbuilding and 3) automobile. In this paper, approaches to scheduling presented in the literature are categorized into the following three categories : 1) application, 2) algorithm, and 3) simulation modeling. First, in the semiconductor industry, scheduling techniques related to semiconductor cleaning processes, photolithography processes, chemical processes, transport and transport equipment have been found to be dominant. Second, the shipbuilding industry is focused on assembly processes, transporter, crane and various existing production management system. On the other hand, the scheduling research of the automobile industry is mainly focused on the vehicle movement routing and procurement supply-chain planning algorithm in terms of logistics. The conclusion of this study are expected to provide many implications for various types of academic and practical follow-up studies related to scheduling in consideration of main characteristics of semiconductor, shipbuilding and automobile industries.

Information Technology Implementation in Supply Risk and Performance (공급위험과 성과를 위한 정보 기술 실행)

  • Kim, Minkyun;Chai, Sangmi
    • Management & Information Systems Review
    • /
    • v.33 no.1
    • /
    • pp.237-261
    • /
    • 2014
  • This study is to investigate the impact of information technology implementation on supply chain risk and performance. It focuses on how information technology adoption affects supply risk as well as performance. It collected one hundred fifty nine responses from supply executives and supply and purchasing managers of U.S manufacturing firms by applying a survey methodology. The research results provide empirical evidence that the use of information technology in the supply chain mitigates supply risk and improves performance. More importantly, information technology adoption involves three aspects: inbound and outbound communications, internal communications and administration and finally, mitigation of supply risks and improved performance via order taking and procurement. This research emphasizes the importance of IT implementation in supply risk management. It also points out how information technology adoption facilitates the impact of information technology in risk mitigation in the supply chain and in performance. Thus, supply and purchasing managers need to consider IT implementation and adoption when establishing their risk mitigating strategies within the supply chains.

  • PDF

A Study on the Work Breakdown Structure of Agricultural Facilities for Developing a Construction and Maintenance Information System -Focused on Vinyl house, Glass greenhouse, Cattle shed- (농촌시설물 시공 및 유지관리 정보화 시스템 구축을 위한 작업분류체계 구축에 관한 연구 -비닐하우스, 유리온실, 축사를 중심으로-)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee;Choi, Eung-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.147-155
    • /
    • 2009
  • Recently, the scale and technical complexity of agricultural production has been growing. Therefore, agricultural facilities are being gradually diversified, expanded, and made more complex. To furnish Korea's agricultural industry with international competitiveness, it is thus necessary to introduce new management techniques. The PCM (procurement-construction-maintenance) information management system for agricultural facilities is established by setting up its WBS (work breakdown structure). In this study, the WBS of a facility such as facility, space, element, works, and resources is analyzed. Following this analysts, a WBS of an agricultural facility that is appropriate for the PCM information system of an agricultural facility, is proposed by deriving it from actual WBS.

A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF