Linux it self does not support real-time. To solve this problem RTiK-Linux was designed to support real-time in the kernel space. However, since the user space does not support real-time, it is not easy to develop application. In this paper, we designed and implemented a RTiK-middleware to support real-time in the user space. RTiK-middleware provides real-time scheduling for user space through signal request period after to register process information with request period using apis on application. To evaluate the performance of the proposed RTiK-middleware, we measured the periods of generated real-time threads using RDTSC instructions, and verified that RTiK-middleware operates correctly within the error ranges of 1ms.
The Journal of Korean Institute of Communications and Information Sciences
/
v.28
no.11B
/
pp.1016-1022
/
2003
The EPON has been actively studied as one of the access networks for the economic configuration of FTTH. The EPON must support the dynamic bandwidth allocation to the subscribers in order to support the QoS due to its base on Ethernet technology EFM SG, which is actively working for the standardization of EPON, also recently decided to select DBA. Therefore in this paper, we designed a ONU buffer scheduling algorithm(AIWFQ) and a scheme of DBA(Class-based FCFS) for the OLT suitable for embodying MPCP of the EPON. In this paper, we proposed methods that the EPON system can make use of by measuring end to end process delay time and the buffer size in order to implement the algorithm by using the OPNET.
MES(Manufacturing Execution System) is a control system which supports basic activities(scheduling, working process and qualify management, etc) to execute working on the shop floor. As especially MES is a system to decrease the gap between production planning and operating, it executes functions that make decision between management and labor using real-time data. MES for real-time information processing requires certain conditions such as data modeling of RFID, which has recently attracted attentions, and monitoring of each product unit from manufacture to sales. However, in the middle of processing the unit with a RFID tag, transponders(readers) can't often read the tag due to reader's malfunctions, intentional damages, loss and the circumstantial effects; for that reason, users are unable to confirm the location of the product unit. In this case, users cannot avoid tracing the path of units with uncertain clues. In this paper, we suggest that the unique MES based on RFID and Bayesian Network can immediately track the product unit, and show how to evaluate it.
LEO Satellite performs the operations and missions by FSW(Flight Software) after separation from a launch vehicle. Many of the operations by FSW are automatically conducted by the algorithms of FSW. In the case of the IAC(Initial Activation and Checkout) operations, a mission scheduling, an orbit transition, etc, however, a decision and a control of the satellite operators or manufacturers are required in order to operate the satellite safely. For this, the wireless communication channel between a satellite and a ground station should be prepared to receive telemetries and to transmit tele-commands for controlling FSW properly. Therefore, the verification of the interface between KOMPSAT-3 and a ground station is essential. This verification test is named the satellite end-to-end test. In this paper, we show the design process of the satellite end-to-end test and test results.
Korean Journal of Construction Engineering and Management
/
v.6
no.4
s.26
/
pp.71-79
/
2005
As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.
The Journal of Korean Association of Computer Education
/
v.11
no.3
/
pp.81-89
/
2008
The failure occurrence of resources in the grid computing is higher than in a tradition parallel computing. Since the failure of resources affects job execution fatally, fault tolerance service is essential in computational grids. And grid services are often expected to meet some minimum levels of quality of service (QoS) for desirable operation. However Globus toolkit does not provide fault tolerance service that supports fault detection service and management service and satisfies QoS requirement. Thus this paper proposes fault tolerance service to satisfy QoS requirement in computational grids. In order to provide fault tolerance service and satisfy QoS requirements, we expand the definition of failure, such as process failure, processor failure, and network failure. And we propose resource scheduling service, fault detection service and fault management service and show implement and experiment results.
The Journal of Korean Institute of Communications and Information Sciences
/
v.29
no.2B
/
pp.272-278
/
2004
The EPON has been actively studied as one of the access networks for the economic configuration of FTTH. The EPON must support the dynamic bandwidth allocation to the subscribers in order to support the QoS due to its base on Ethernet technology. EFM SG, which is actively working for the standardization of EPON, also recently decided to select DBA. Therefore in this paper, we designed a ONU buffer scheduling algorithm (AIWFQ) and a scheme of DBA(Class-based FCFS) for the OLT suitable for embodying MPCP of the EPON. In this paper, we proposed methods that the EPON system can make use of by measuring end to end process delay time and the buffer size in order to implement the algorithm by using the OPNET.
Journal of the Institute of Electronics Engineers of Korea SD
/
v.46
no.2
/
pp.85-92
/
2009
This paper proposes a full-search block-matching motion estimation circuit with hybrid architecture combining systolic arrays and adder trees for an MPEG-4 encoder. The proposed circuit uses systolic arrays for motion estimation with a small number of clock cycles and adder trees to reduce required circuit resources. The interpolation circuit for 1/2 pixel motion estimation consists of six adders, four subtracters and ten registers. We improved the circuit performance by resource sharing and efficient scheduling techniques. We described the motion estimation circuit for integer and 1/2 pixels at RTL in Verilog HDL. The logic-level circuit synthesized by using 130nm standard cell library contains 218,257 gates and can process 94 D1($720{\times}480$) image frames per second.
Among modern computer vision and video surveillance systems, the pedestrian counting system is a one of important systems in terms of security, scheduling and advertising. In the field of, pedestrian counting remains a variety of challenges such as changes in illumination, partial occlusion, overlap and people detection. During pedestrian counting process, the biggest problem is occlusion effect in crowded environment. Occlusion and overlap must be resolved for accurate people counting. In this paper, we propose a novel pedestrian counting system which improves existing pedestrian tracking method. Unlike existing pedestrian tracking method, proposed method shows that average filter tracking method can improve tracking performance. Also proposed method improves tracking performance through frame compensation and outlier removal. At the same time, we keep various information of tracking objects. The proposed method improves counting accuracy and reduces error rate about S6 dataset and S7 dataset. Also our system provides real time detection at the rate of 80 fps.
Proceedings of the Korean Operations and Management Science Society Conference
/
2006.05a
/
pp.373-378
/
2006
Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.