• Title/Summary/Keyword: process scheduling

Search Result 797, Processing Time 0.027 seconds

Production/Distribution Scheduling for Integrated Supply Chain Management (통합 공급체인관리를 위한 생산/배송 스케줄링)

  • Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.4
    • /
    • pp.443-453
    • /
    • 2002
  • Many firms are trying to optimize their production and distribution systems separately, but possible profit increase by this approach is limited. Nowadays, it is more important to analyze these two systems simultaneously for the integrated supply chain management. This paper is a computational study to investigate the effectiveness of integrating production and distribution scheduling. We are interested in a multi-plant, multi-retailer, multi-product and multi-period industrial problem where the objective in solving production and distribution scheduling problem is to maximize the total net profit. Computational results on test problems of various sizes using the heuristic we developed show a substantial advantage of the integrated scheduling approach over the decoupled scheduling process. Sensitivity analysis on the parameter values indicates that, under the right conditions, the effectiveness of integrating production and distribution functions can be extremely high.

Low Power Time Synchronization for Wireless Sensor Networks Using Density-Driven Scheduling

  • Lim, HoChul;Kim, HyungWon
    • Journal of information and communication convergence engineering
    • /
    • v.16 no.2
    • /
    • pp.84-92
    • /
    • 2018
  • For large wireless sensor networks running on battery power, the time synchronization of all sensor nodes is becoming a crucial task for waking up sensor nodes with exact timing and controlling transmission and reception timing. However, as network size increases, this synchronization process tends to require long processing time consume significant power. Furthermore, a naïve synchronization scheduler may leave some nodes unsynchronized. This paper proposes a power-efficient scheduling algorithm for time synchronization utilizing the notion of density, which is defined by the number of neighboring nodes within wireless range. The proposed scheduling algorithm elects a sequence of minimal reference nodes that can complete the synchronization with the smallest possible number of hops and lowest possible power consumption. Additionally, it ensures coverage of all sensor nodes utilizing a two-pass synchronization scheduling process. We implemented the proposed synchronization algorithm in a network simulator. Extensive simulation results demonstrate that the proposed algorithm can reduce the power consumption required for the periodic synchronization process by up to 40% for large sensor networks compared to a simplistic multi-hop synchronization method.

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

Development of Simulation App Tool for Understanding 8 Process Scheduling Policies

  • Lee, Kyong-ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.9
    • /
    • pp.213-221
    • /
    • 2021
  • In this study, an simulation app was developed as one of the methods to help learners better understand the eight process scheduling policies of multi-programming. In learning, an app in the form of a simulation should provide a realistic environment and allow learners to practice. To do this, the needs of the learners were investigated and analyzed, and the purpose was set, designed, and programmed based on the learners' understanding. And it was shown that the apps as a tool to simulate the created eight scheduling policies are performing well. In particular, it was shown that the problem of not having a step-by-step various diagram and explanation for step-by-step various inputs, which is a limitation of paper textbooks, can be solved using these tools.

Customer Order Scheduling Problems with a Fixed Machine-Job Assignment

  • Yang, Jae-Hwan;Rho, Yoo-Mi
    • Management Science and Financial Engineering
    • /
    • v.11 no.2
    • /
    • pp.19-43
    • /
    • 2005
  • This paper considers a variation of the customer order scheduling problem, and the variation is the case where the machine-job assignment is fixed. We examine the parallel machine environment, and the objective is to minimize the sum of the completion times of the batches. While a machine can process only one job at a time, different machines can simultaneously process different jobs in a batch. The recognition version of this problem is known to be NP-complete in the strong sense even if there exist only two parallel machines. When there are an arbitrary number of parallel machines, we establish three lower bounds and develop a dynamic programming (DP) algorithm which runs in exponential time on the number of batches. We present two simple but intuitive heuristics, SB and GR, and find some special cases where SB and GR generate an optimal schedule. We also find worst case upper bounds on the relative error. For the case of the two parallel machines, we show that GR generates an optimal schedule when processing times of all batches are equal. Finally, the heuristics and the lower bounds are empirically evaluated.

Development of An On-line Scheduling Framework Based on Control Principles and its Computation Methodology Using Parametric Programming (실시간 일정계획 문제에 대한 Control 기반의 매개변수 프로그래밍을 이용한 해법의 개발)

  • Ryu, Jun-Hyung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.12
    • /
    • pp.1215-1219
    • /
    • 2006
  • Scheduling plays an important role in the process management in terms of providing profit-maximizing operation sequence of multiple orders and estimating completion times of them. In order to takes its full potential, varying conditions should be properly reflected in computing the schedule. The adjustment of scheduling decisions has to be made frequently in response to the occurrence of variations. It is often challenging because their model has to be adjusted and their solutions have to be computed within short time period. This paper employs Model Predictive Control(MPC) principles for updating the process condition in the scheduling model. The solutions of the resulting problems considering variations are computed using parametric programming techniques. The key advantage of the proposed framework is that repetition of solving similar programming problems with decreasing dimensionis avoided and all potential schedules are obtained before the execution of the actual processes. Therefore, the proposed framework contributes to constructing a robust decision-support tool in the face of varying environment. An example is solved to illustrate the potential of the proposed framework with remarks on potential wide applications.

The Operational Optimization of Semiconductor Research and Development Fabs by FAB-wide Scheduling (FAB-Wide 스케줄링을 통한 반도체 연구라인의 운용 최적화)

  • Kim, Young-Ho;Lee, Jee-Hyong;Sun, Dong-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.692-699
    • /
    • 2008
  • Semiconductor research and development(R&D) fabs are very different than production fabs in many ways such as the scales of production, job priority, production methods, and performance measures. Efficient operations of R&D fabs are very important to the development of new product, process stability, high yield, and ultimately company competitiveness. This paper proposes the fab-wide scheduling method for operational optimization of the R&D fabs. Most scheduling systems of semiconductor fabs have only focused on maximizing throughput of each separated areas without considering WIP(works in process) flows of entire fab. In this paper, we proposes the a fab-wide scheduling system which schedules all lots to entire fab equipment at once. We develop the MIP(mixed integer programing) model which allocates the lots to production equipment considering many constraints of all processes and the CP(constraint programming) model which determines the sequences of the lots in the production equipment. The proposed FAB-wide scheduling model is applied to the newly constructed R&D fab. As a result, we have accomplished the system based automated job reservation, decrease of the hot lot delay, increase of the queue time satisfaction, the high throughput by maximizing the batch sizes, decrease of the WIP TAT(Turn Around Time).

A Review on the CPU Scheduling Algorithms: Comparative Study

  • Ali, Shahad M.;Alshahrani, Razan F.;Hadadi, Amjad H.;Alghamdi, Tahany A.;Almuhsin, Fatimah H.;El-Sharawy, Enas E.
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.1
    • /
    • pp.19-26
    • /
    • 2021
  • CPU is considered the main and most important resource in the computer system. The CPU scheduling is defined as a procedure that determines which process will enter the CPU to be executed, and another process will be waiting for its turn to be performed. CPU management scheduling algorithms are the major service in the operating systems that fulfill the maximum utilization of the CPU. This article aims to review the studies on the CPU scheduling algorithms towards comparing which is the best algorithm. After we conducted a review of the Round Robin, Shortest Job First, First Come First Served, and Priority algorithms, we found that several researchers have suggested various ways to improve CPU optimization criteria through different algorithms to improve the waiting time, response time, and turnaround time but there is no algorithm is better in all criteria.

Multiobjective Hybrid GA for Constraints-based FMS Scheduling in make-to-order Manufacturing

  • Kim, Kwan-Woo;Mitsuo Gen;Hwang, Rea-Kook;Genji Yamazaki
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.187-190
    • /
    • 2003
  • Many manufacturing companies consider the integrated and concurrent scheduling because they need the global optimization technology that could manufacture various products more responsive to customer needs. In this paper, we propose an advanced scheduling model to generate the schedules considering resource constraints and precedence constraints in make-to-order (MTO) manufacturing environments. Precedence of work- in-process(WIP) and resources constraints have recently emerged as one of the main constraints in advanced scheduling problems. The advanced scheduling problems is formulated as a multiobjective mathematical model for generating operation schedules which are obeyed resources constraints, alternative workstations of operations and the precedence constraints of WIP in MTO manufacturing. For effectively solving the advanced scheduling problem, the multi-objective hybrid genetic algorithm (m-hGA) is proposed in this paper. The m-hGA is to minimize the makespan, total flow time of order, and maximum tardiness for each order, simultaneously. The m-hGA approach with local search-based mutation through swap mutation is developed to solve the advanced scheduling problem. Numerical example is tested and presented for advanced scheduling problems with various orders to describe the performance of the proposed m-hGA.

  • PDF

Parallel Video Processing Using Divisible Load Scheduling Paradigm

  • Suresh S.;Mani V.;Omkar S. N.;Kim H.J.
    • Journal of Broadcast Engineering
    • /
    • v.10 no.1 s.26
    • /
    • pp.83-102
    • /
    • 2005
  • The problem of video scheduling is analyzed in the framework of divisible load scheduling. A divisible load can be divided into any number of fractions (parts) and can be processed/computed independently on the processors in a distributed computing system/network, as there are no precedence relationships. In the video scheduling, a frame can be split into any number of fractions (tiles) and can be processed independently on the processors in the network, and then the results are collected to recompose the single processed frame. The divisible load arrives at one of the processors in the network (root processor) and the results of the computation are collected and stored in the same processor. In this problem communication delay plays an important role. Communication delay is the time to send/distribute the load fractions to other processors in the network. and the time to collect the results of computation from other processors by the root processors. The objective in this scheduling problem is that of obtaining the load fractions assigned to each processor in the network such that the processing time of the entire load is a minimum. We derive closed-form expression for the processing time by taking Into consideration the communication delay in the load distribution process and the communication delay In the result collection process. Using this closed-form expression, we also obtain the optimal number of processors that are required to solve this scheduling problem. This scheduling problem is formulated as a linear pro-gramming problem and its solution using neural network is also presented. Numerical examples are presented for ease of understanding.