1 |
Baker, K. R., 'Scheduling the Production of Components at a Common Facility,' lIE Transactions 20 (1988), 32-35
DOI
ScienceOn
|
2 |
Coffman, E. G., A. Nozari, and M. Yannakakis, 'Optimal Scheduling of Products with Two Subassemblies on a Single Machine,' Operations Research 37 (1989),426-436
DOI
ScienceOn
|
3 |
Ding, F. Y., 'A Pairwise Interchange Solution Procedure for a Scheduling Problem with Production of Components at a Single Facility,' Computers and Industrial Engineering 18 (1990),325-331
DOI
ScienceOn
|
4 |
Julien, F. M. and M. J. Magazine, 'Scheduling Customer Orders: An Alternative Production Scheduling Approach,' Journal of Manufacturing and Operations Management 3 (1990), 177-199
|
5 |
Potts, C. N. and L. N. Van Wassenhove, 'Integrating Scheduling with Batching and Lot-sizing: a Review of Algorithm and Complexity,' Journal of Operational Research Society 43 (1992), 395-406
DOI
ScienceOn
|
6 |
Webster, C. and K. R. Baker, 'Scheduling Groups of Jobs on a Single Machine,' Operations Research 43 (1995),692-703
DOI
ScienceOn
|
7 |
Yang, J., 'The Complexity of Customer Order Scheduling Problems on Parallel Machines,' Computers and Operations Research 32 (2005), 1921-1939
DOI
ScienceOn
|
8 |
Jordan, C., Batching and Scheduling: Models and Methods for Several Problem Classes, Springer, New York 1996
|
9 |
Gupta, J. N. D., J. C. Ho, and A. A. van der Veen, 'Single Machine Hierarchical Scheduling with Customer Orders and Multiple Job Classes,' Annal of Operations Research 70 (1997), 127-143
DOI
|
10 |
Santos, C. and M. Magazine, 'Batching in Single Operation Manufacturing Systems,' Operations Research Letters 4 (1985),99-103
DOI
ScienceOn
|
11 |
Roemer, T. A., and R. Ahmadi, 'The Complexity of Scheduling Customer Orders,' Working Paper, Anderson School of Management at UCLA, USA 1997
|
12 |
Yang, J. and M. E. Posner, 'Scheduling Parallel Machines for the Customer Order Problem,' Journal of Scheduling 8 (2005),49-74
DOI
ScienceOn
|
13 |
Yoon, S. H., 'Fabrication Scheduling of Products with Common and Unique Components at a Single Facility,' Journal of the Korean Operations Research and Management Science Society 28 (2003), 105-114
|
14 |
Yang, J., 'Scheduling Parallel Machines for the Customer Order Problem with Fixed Bach Sequence,' Journal of the Korean Institute of Industrial Engineers 29 (2003) 304-311
|
15 |
Blocher, J. D. and D. Chhajed, 'The Customer Order Lead Time Problem on Parallel Machines,' Naval Res. Logist. 43 (1996),629-654
DOI
ScienceOn
|
16 |
Liao, C. J., 'Optimal Scheduling of Products with Common and Unique Components,' International Journal of Systems Science 27 (1996),361-366
DOI
ScienceOn
|
17 |
Blocher, J. D., D. Chhajed, and M. Leung, 'Customer Order Scheduling in a General Job Shop Environment,' Decision Science 29 (1998), 951-981
DOI
ScienceOn
|
18 |
Gerodimos, A. E., C. A. Glass, and C. N. Potts, 'Scheduling the Production of Two-Component Jobs on a Single Machine,' European Journal of Operational Research 120 (2000), 250-259
DOI
ScienceOn
|
19 |
Graham, R. L., E. L. Lawler, J. K. Lenstra, and A .H. G. Rinnooy Kan, 'Optimization and Approximation in Deterministic Machine Scheduling: A Survey,' Annals of Discrete Mathematics 5 (1979), 287-326
DOI
|
20 |
Ahmadi, R., U. Bagchi, and T. A. Roemer, 'Coordinated Scheduling of Customer Orders for Quick Response,' Working Paper, Anderson School of Management at UCLA, USA 2004
|