1 |
K. P. Papalexandri and T. I. Dimkou, 'A parametric mixed integer optimization algorithm for multi-objective engineering problems involving discrete decisions.' Ind. Eng. Chem. Res. 37, 1866-1882, 1998
DOI
ScienceOn
|
2 |
V. Dua and E. N. Pistikopoulos(b), 'Optimization techniques for process synthesis and material design under uncertainty.' Trans. IChemE. 76, Part A, 408-416.1998
DOI
ScienceOn
|
3 |
V. Dua and E. N. Pistikopoulos, 'Algorithms for the solutions of multiparametric mixed-integer nonlienar optimization problems.' Ind. Eng. Chem. Res. 38, 3976-3987,1999
DOI
ScienceOn
|
4 |
A. Huercio, A. Espuna, and L. Puigjaner, 'Incorporating on-line scheduling strategies in integrated batch production control.' Comput. chem. Engng. 19, S609-S614, 1995
DOI
ScienceOn
|
5 |
N. Ishii and M. Muraki, 'A process-variability-based online scheduling system in multiproduct batch process.' Comput. chem. Engng. 20, 217-234, 1996
DOI
ScienceOn
|
6 |
K. B. Kanakamedala, G. V. Reklaitis, and V. Venkatasubramanian, 'Reactive Schedule Modification in Multipurpose Batch chemical Plants.' Ind. Eng. Chem. Res 33, 77-90, 1994
DOI
ScienceOn
|
7 |
M. Kim and I. Lee, 'Rule-based reactive rescheduling system for multi-purpose batch processes.' Comput. chem. Engng. 21, S1197-S1202, 1997
DOI
ScienceOn
|
8 |
M. Morari and J. H. Lee, 'Model predictive control:past, present and future.' Computers chem. Engng 23, 667-682, 1999
DOI
ScienceOn
|
9 |
J. Acevedo and E. N. Pistikopoulos, 'An algorithm for muitiparametric mixed-integer linear programming problems under uncertainty.' Oper. Res. Lett. 24, 139-148, 1999
DOI
ScienceOn
|
10 |
B. J. Cott and S. Macchietto, 'Minimizing the effects of batch process variability using online schedule modification.' Com put. Chem. Engng. 13, 105-113, 1989
DOI
ScienceOn
|
11 |
E. N. Pistikopoulos and V. Dua, 'Planning under uncertainty; a parametric optimization approach.' Proc. Third Int. Conf. on FOCAPO(J.F. Pekny and G.E. Blau, Eds), 1998
|
12 |
J. Acevedo and E. N. Pistikopoulos, 'A parametric MINLP algorithm for process synthesis problem under uncertainty.' Ind. Eng. Chem. Res. 35,147-158,1996
DOI
ScienceOn
|
13 |
J. Ryu, V. Dua, and E. N. Pistikopoulos, 'A bilevel programming framwork for enterprise-wide supply chain planning problems under uncertainty.' Foundautions of Computer-Aided Process Operations, 297-300,2003
|
14 |
G. Schilling and C. C. Pantelides, 'General algorithms for reactive scheduling of multipurpose plants.' AIChE Annual Meeting. Los Angeles, USA, 1997
|
15 |
J. P. Yin and M. G. Ierapetritou, 'A new approach for efficient rescheduling of multiproduct batch plants.' Ind. Eng. Chem. Res. 39,4228-4238, 2000
DOI
ScienceOn
|
16 |
M. T. Rodrigues, M. Gimeno C. Passos, and M. Campos, 'Reactive scheduling approach for multipurpose chemical batch plants.' Comput. chem. Engng. 20, S1215-S1220, 1996
DOI
ScienceOn
|
17 |
E. N. Pistikopoulos, V. Dua, N. A. Bozinis, A. Bemporad, and M. Morari, 'On-line optimization via off-line parametric optimization tools.' Comput. chem. Engng. 24, 183-188, 2000.
DOI
ScienceOn
|
18 |
A. Pertsinidis, I. E. Grossmann, and G. J. McRae, 'Parametric optimization of MlLP programs and a framework for the parametric optimization of MlNLPs. Comput.' Chem. Engng. 22, S205-S210, 1998
DOI
ScienceOn
|