• Title/Summary/Keyword: preventive optimal-maintenance

Search Result 117, Processing Time 0.028 seconds

Extension of PM Model with Random Maintenance Quality

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.13 no.3
    • /
    • pp.651-656
    • /
    • 2006
  • Wu and Clements-Croome (2005) investigate the optimization problem of PM policies for situations where the quality of PM is a random variable with a certain probability distribution. However, they assume that the cost of preventive maintenance is constant, not depending on the quality of PM. Thus, this paper considers a periodic PM model when PM cost depends on the quality of PM activity. The optimal PM policy are presented for the extended PM model and the numerical examples are presented for illustrative purpose.

Maintenance Policy Based on Cost and Downtime Following the Expiration of Combination Warranty (혼합보증이 종료된 이후의 비용과 비가동시간에 근거한 보전정책)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.6
    • /
    • pp.909-923
    • /
    • 2008
  • This paper considers the replacement model and the preventive maintenance model following the expiration of combination warranty for a repairable system. If the system fails after the combination warranty is expired, then it is minimally repaired at each failure. The criterion used to determine the optimal replacement policy and the optimal preventive maintenance policy is the overall value function based on the expected cost rate per unit time and the expected downtime per unit time. The numerical examples are presented for illustrative purpose when the failure time follows a Weibull distribution.

Burn-in When Minimal Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sang-Yeol
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2002.11a
    • /
    • pp.147-151
    • /
    • 2002
  • Burn-in is a widely used method to eliminate initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

  • PDF

A Bayesian Approach to PM Model with Random Maintenance Quality

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.18 no.3
    • /
    • pp.689-696
    • /
    • 2007
  • This paper considers a Bayesian approach to determine an optimal PM policy with random maintenance quality. Thus, we assume that the quality of a PM action is a random variable following a probability distribution. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal PM policy. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

Determining the Optimum Maintenance Period of the Steel Making Equipment Having Multiple Failure Types (다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출)

  • Song, Hong-Jun;Jun, Chi-Hyuck
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.27-33
    • /
    • 2003
  • The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.

PM Policy with Random Maintenance Quality Following the Expiration of Non-Renewing Warranty (비재생보증이 종료된 이후의 확률적 보전효과를 갖는 예방보전정책)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.1
    • /
    • pp.77-86
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policy following the expiration of non-renewing warranty. We assume that Wu and Clements-Croome's (2005) periodic PM model with random maintenance quality is utilized to maintain the system after the non-renewing warranty is expired. Given the cost structure to the user during the cycle of the product, we drive the expressions for the expected cost rate per unit time. Also, we obtain the optimal number and the optimal period by minimizing the expected cost rate per unit time. The numerical examples are presented for illustrative purpose.

Wear Limit of Tool by the Shift and Failure of a Machining Process (절삭공정의 변이와 고장에 의한 가공공구의 마모한계)

  • 이도경
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.35
    • /
    • pp.9-16
    • /
    • 1995
  • The degeneration of tool in material removal processing machinery can be characterized by wear, deflection, chattering and any failure in tool or in the material In be processed. In the previous studies, first three of them are analyzed as a preventive maintenance strategy in quality control area. The last of them, any failure, is analyzed as a preventive maintenance strategy in reliability area. In this research, we propose a simple integrated mathematical model which minimizes the cost of machinery failures and producing defects. We determine the optimal wear limit of tool by considering the percent defects. cost, the preventive maintenance cost, and the corrective maintenance cost.

  • PDF

The Optimal Maintenance Strategy of a Rail Bridge by Using Life Cycle Cost (생애주기 비용을 이용한 철도교량의 최적유지관리)

  • Yang Seung-le
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.544-549
    • /
    • 2005
  • Nowadays, most of bridge networks are complete or close to completion. The biggest challenge railroad./highway agencies and departments of transportation face is the maintenance of these networks, keeping them safe and serviceable, with limited funds. To maintain the bridges effectively, there is an urgent need to predict their remaining life from a system reliability viewpoint. And, it is necessary to develop the maintenance models based on system reliability concept. In this paper, maintenance models are developed for preventive maintenance and essential maintenance by using system reliability and lifetime distributions. The proposed model is applied to an existing railroad bridge. The optimal maintenance strategy of this bridge is obtained in terms of services life extension and cumulative maintenance cost.

Optimal Preventive Maintenance Policy for a Repairable System (수리 가능한 시스템에서의 최적 예방 보전 정책)

  • Ji Hwan Cha;Jong Tae Jung;Jae Joo Kim
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.2
    • /
    • pp.46-53
    • /
    • 2001
  • In this paper, a preventive maintenance(PM) policy for a repairable system is considered. The failure rate model proposed by Park et at.(2000) is generalized by assuming that after each PM not only the PM slows down the degradation process of the system but also reduces down the system failure rate by a certain fixed amount. Long-run expected cost rate of the PM policy is derived and the properties of joint solution of the optimal PM period and optimal number of PM which minimizes the expected cost rate are obtained. Numerical examples for the case of a Weibull-type failure rate are given.

  • PDF

Bayesian Method on Sequential Preventive Maintenance Problem

  • Kim Hee-Soo;Kwon Young-Sub;Park Dong-Ho
    • Communications for Statistical Applications and Methods
    • /
    • v.13 no.1
    • /
    • pp.191-204
    • /
    • 2006
  • This paper develops a Bayesian method to derive the optimal sequential preventive maintenance(PM) policy by determining the PM schedules which minimize the mean cost rate. Such PM schedules are derived based on a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) and may have unequal length of PM intervals. To apply the Bayesian approach in this problem, we assume that the failure times follow a Weibull distribution and consider some appropriate prior distributions for the scale and shape parameters of the Weibull model. The solution is proved to be finite and unique under some mild conditions. Numerical examples for the proposed optimal sequential PM policy are presented for illustrative purposes.