KIEE International Transactions on Power Engineering
/
v.5A
no.2
/
pp.97-102
/
2005
Voltage sags are the most widespread quality issues affecting distribution systems. This paper describes in some detail the voltage sag characteristics due to different types and locations of fault in a practical low voltage power distribution system encountered in the UK. The results not only give utility engineers very useful information when identifying parts of the system most likely to pose problems for customer equipments, but also assist the facility personnel to make decisions on purchasing power quality mitigation equipment.
In this paper, a novel delta/double-fork transformer based 18-pulse full-wave AC-DC converter is designed, modeled, simulated and developed to feed isolated DC varying loads. The proposed AC-DC converter is used for low voltage and large current DC loads in applications such as electrowinning, where isolation is required mainly for stepping down the supply voltage. The proposed converter improves power quality at AC mains and meets IEEE-519 standard requirements at varying loads.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.10
/
pp.58-67
/
2006
In this paper, real-time reactive power/power factor compensating equipment is suggested for improving power quality at electrical railway's substation in marshalling yard and designing optimal capacity of compensating equipment for actual apply at current marshalling yard. For this purpose, several kind of real-time reactive power/power factor compensating equipments are introduced and SVG(Static Var Generator) as optimal compensating equipment that is suitable for load characteristics of substation in marshalling yard is suggested. This paper shows proper simulations by suggested equipment using PSIM software and describe basic compensating principle and simulation results. Optimal capacity design for applying current marshalling yard is based on real measured power quality data. Power quality improvement that is performed by SVG as real-time reactive power/power factor compensating equipment is estimated at electrical railway's substation in marshalling yard. As reference, real-time reactive power/power factor compensating equipment is composed by voltage source inverter and DC capacitors.
Simic, Milan;Denic, Dragan;Zivanovic, Dragan;Taskovski, Dimitar;Dimcev, Vladimir
Journal of Power Electronics
/
v.12
no.5
/
pp.813-820
/
2012
This paper presents the development of a software supported acquisition system for metrological verification and testing of the equipment for monitoring and analysis of the basic electrical power quality parameters. The described procedure consists of two functionally connected segments. The first segment involves generation of the reference three-phase voltage signals, including the possibility of simulation of the various power quality disturbances, typical for electrical power distribution networks. The second part of this procedure includes the real-time recording of power quality disturbances in three-phase distribution networks. The procedure is functionally supported by the virtual instrumentation concept, including a software application developed in LabVIEW environment and data acquisition boards NI 6713 and NI 9215A. The software support of this system performs graphical presentation of the previously generated and recorded signal waveforms. A number of the control functions and buttons, implemented on the virtual instrument front panels, are provided to adjust the basic signal acquisition, generation and recording parameters.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.18
no.6
/
pp.220-229
/
2004
The AC railway system is quite differing from the general electric power system because it is single- phase and intermittently heavy loads. Thus, inevitably power quality problems are occurred in the AC railway system, i.e. voltage regulation voltage sags, voltage imbalance, and harmonic distortion. Recently, the power quality of the AC railway system becoming a hot issue because it is affect the control and safety of high-speed traction. In addition it is also affect the power quality of the electric power system. In this paper, single-phase Unified Power Quality Conditioner(UPQS) for the AC railway system is proposed to compensate the voltage sags and harmonic distortion. The configurations and control schemes of the proposed single-phase UPQC are presented. The effectiveness of the proposed single-phase UPQC application is verified by the PSCAD/EMTDC simulation works. It can be shown that the application of UPQC in the AC railway system is very useful to compensate the voltage sags and harmonic distortion from the results of related simulation works.
Kim Yeoung-Noh;Shin Bong-Il;Lee Hee-Chul;Kwak No-Hong;Jeon Young-Soo;Park Sang-Ho;Lee Il-Moo
Proceedings of the KIPE Conference
/
2006.06a
/
pp.432-434
/
2006
The additional matters appear to be considered in several aspects for building up power-quality measuring system of transmission system(high voltage system) compared to distribution system(middle or low voltage system). Like in distribution system, input signals are also received from PT and CT source of voltage and current respectively in transmission system and applied in accordance with a certain rate. In this case, very big error rate can be occurred according to the specification of the measuring system as the applying rate is bigger than in distribution system beyond comparison. In addition, when the abnormal signal occurred such as sag/swell, interruption, transient etc., power quality of other sires linked to the system also should be checked to find the accurate cause of the abnormal power-quality signals from the corresponding. site. Accordingly, the accurate diagnosis on the condition of power quality for the system depends on the way how the synchronization system is brought along for each site. This paper will suggest the solution for the most effective system building focused on how to solve the problem of the error rate and synchronization described in the above when building up the measuring system of power quality for transmission system.
The Transactions of the Korean Institute of Power Electronics
/
v.6
no.1
/
pp.27-33
/
2001
This paper presents a digital instrument for a DSP based power quality analysis in three phase power system where current waveform is non-sinusoidal. it is based on stand alone type TMS320C31 DSP(digital signal processor)board and on a special high-speed data acquisition system. Power quality of low power motor drives are analyzed and processed by using a simple average power algorithm, and result of power analysis are displayed by LCD in the proposed system. This paper also goes on to discuss the performance of an instrument prototype, both in terms of accuracy and speed of measurement under the transient and steady state condition.
To improve the power quality, various types of equipment are used. However, without determining the existing levels of power quality, electric utilities and customers cannot adopt suitable strategies and equipment to improve the power quality. Therefore, in this paper, power quality monitoring system is discussed.
This paper proposes a single-phase unified power quality conditioner (S-UPQC) for maintaining power quality issues in a microgrid. The S-UPQC can compensate the voltage and current harmonics, voltage sag, and swell as a dynamic voltage restorer (DVR), regardless of variations in the grid frequency. Odd harmonics are treated as even-order harmonics in a rotating frame to implement the harmonic compensators with only one repetitive controller (RC) without any harmonic extractor. The dynamic performance is improved and the delay time is reduced in the RC. The S-UPQC control scheme is designed to maintain accurate and stable operation under deviations of the grid frequency by using the Lagrange interpolation-based finite-impulse-response (LIFIR) filter approximation method. The proposed control schemes were validated through a simulation and experiment.
Journal of Institute of Control, Robotics and Systems
/
v.13
no.6
/
pp.531-536
/
2007
This paper presents a power quality assessment model based on the Analytic hierarchy process. This model can assess unified power quality index which provide an overall performance of the distribution system. To obtain the unified power quality index, we propose the use of the AHP model which has three states: [Ideal]-[Actual]-[Worst]. The proposed method is especially useful and effective for planning. We have applied the proposed method to an actual relatively large system, and verified the usefulness.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.