Study on the measuring system of power quality for transmission system

송전계통의 전기품질 측정 시스템에 관한 연구

  • Published : 2006.06.01

Abstract

The additional matters appear to be considered in several aspects for building up power-quality measuring system of transmission system(high voltage system) compared to distribution system(middle or low voltage system). Like in distribution system, input signals are also received from PT and CT source of voltage and current respectively in transmission system and applied in accordance with a certain rate. In this case, very big error rate can be occurred according to the specification of the measuring system as the applying rate is bigger than in distribution system beyond comparison. In addition, when the abnormal signal occurred such as sag/swell, interruption, transient etc., power quality of other sires linked to the system also should be checked to find the accurate cause of the abnormal power-quality signals from the corresponding. site. Accordingly, the accurate diagnosis on the condition of power quality for the system depends on the way how the synchronization system is brought along for each site. This paper will suggest the solution for the most effective system building focused on how to solve the problem of the error rate and synchronization described in the above when building up the measuring system of power quality for transmission system.

Keywords