• Title/Summary/Keyword: planning phase

Search Result 746, Processing Time 0.026 seconds

-A Study on qualify Assurance Activities in Planning / Design Phase - Mainly for the Quality Function Developyment - (기획.설계 단계에서의 품질 보증 활동에 관한 연구 - 품질 기능 전개 기법 적용 중심으로 -)

  • 이복영;한정오
    • Journal of the Korean Professional Engineers Association
    • /
    • v.26 no.1
    • /
    • pp.18-28
    • /
    • 1993
  • The Studies on Quality Assurance Activities at the Phase of Planning - Design Are Quite Rare, While Those Activies are very Important, This Study is Focused on the Applicability of Quality Function Development System to the Phase of Planning-Design, With a Matrix of the Quality Assurance Activities and Quality Function Develop-ment System. The Application of a Quality Function Development System to the Quality Assurance Activities (1) Makes it Easier to Easier out the Quality Level that Consumers Demand and Varies Rapidly, and (2) Makes it Possible to Link the Production to the Quality Level that Consumers Demand by the Quality Specification.

  • PDF

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Development of Cost Management Process during Design Phase based on Design to Cost (DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발)

  • Park, So-Hyun;Moon, Hyun-Seok;Hyun, Chang-Teak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

Information Security Activity of Analysis Phase in Information Security Model in Accordance with SDLC

  • Shin, Seong-Yoon;Lee, Tae-Wuk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.11
    • /
    • pp.79-83
    • /
    • 2016
  • In this paper, we define four levels of analysis, design, implementation, and testing of the configuration of the development phase by S/W development life cycle. In particular, it dealt with the stage of the analysis phase to prepare an information system developed intensively. Details of the derivation of the information security requirements, it can be seen that comes from the perspective of confidentiality, integrity, availability and accountability, etc. It dealt with from the first manifestations of the projects planning to final planning to establish information security in activities of the Information Security requirements. As an example exhibited by assessing the information security analysis phase activities of S corporations, it can be seen that the improved sales rise in information security activities.

A Study on the status and improvement of construction management in Daegu Gyeongbuk Institute of Science & Technology (대구경북과학기술연구원의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Kim, Hwa-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.32-38
    • /
    • 2007
  • Recently The public project ordering is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. The CM services of project all phase excepts a planning business are performed. But recently the CM services of project all phase including a planning business are increasing every year. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the planning business management, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Daegu Gyeongbuk Institute of Science & Technology.

  • PDF

A Study on the Effective Management Model for Planning Phase of Architect Office in Korea (건축사사무소의 효과적 기획관리모델에 관한 연구 경제성 향상 요인을 중심으로)

  • Yoon Seoung-Hyeon;Ahn Dong-Sic;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.281-285
    • /
    • 2004
  • The purpose of this study is to present an effective management model for planning phase of architect office in korea. The research method of this study includes a questionnaire survey and statistical analysis. The results of this study are as follows; The suggested model for planning and management involves business strategy, manpower strategy, technical strategy and marketing strategy. It is verified by correlation analysis and multiple linear regression from the questionnaire survey data.

  • PDF

Simulated Annealing Based Vehicle Routing Planning for Freight Container Transportation (화물컨테이너 운송을 위한 시뮬레이티드 어닐링 기반의 차량경로계획)

  • Lee, Sang-Heon;Choi, Hae-Jung
    • IE interfaces
    • /
    • v.20 no.2
    • /
    • pp.204-215
    • /
    • 2007
  • This paper addresses vehicle routing planning in freight container transportation systems where a number of loaded containers are to be delivered to their destination places. The system under consideration is static in that all transportation requirements are predetermined at the beginning of a planning horizon. A two-phased procedure is presented for freight container transportation. In the first phase, the optimal model is presented to determine optimal total time to perform given transportation requirements and the minimum of number of vehicles required. Based on the results from the optimal model, in the second phase, ASA(Accelerated Simulated Annealing) algorithm is presented to perform all transportation requirements with the least number of vehicles by improving initial vehicle routing planning constructed by greedy method. It is found that ASA algorithm has an excellent global searching ability through various experiments in comparison with existing methods.

Germany Goes Green - Innovations towards a Sustainable Regional Development

  • Gruehn, Dietwald
    • World Technopolis Review
    • /
    • v.1 no.4
    • /
    • pp.230-239
    • /
    • 2013
  • The paper deals with recent paradigm shift in German environmental policy, fundamentally modifying the German society towards a sustainable future development. Key elements of this development are forceful climate protection measures to contribute to global climate protection strategy and to fulfil international conventions, supplemented by a comprehensive strategy to promote the adaptation to climate change, the nuclear power phase out in the medium term, and innovative landscape and regional planning projects to strengthen regional identity and economic power. All this components are,complemented by a financial support program including incentives, tax reductions, and research funding.