1 |
K. P. Ramaswamy, S. N. Kalidindi, "Waste in Indian building construction projects", Proceedings of the 17th Annual Conference of International Group for Lean Construction, Taipei, Taiwan, 2009, retrieved June 13, 2013 at http://iglc.net/?page_id=28
|
2 |
A. Serpell, A. Venturi, J. Contreras, "Characterization of waste in building construction projects", In Lean Construction, Alarcon (Ed.), A.A. Balkema, Rotterdam, The Netherlands, pp. 67-77, 1995.
|
3 |
I. D. Tommelein, G. Ballard, Lookahead planning: screening and pulling, Technical Report No. 97-9, Construction Engineering and Management Program, Civil and Environmental Engineering Department., University of California, Berkeley, CA, USA, 1997.
|
4 |
J. P. Womack, D. T. Jones, Lean thinking, Free Press, Simon and Schuster, NY, USA, p.354, 1996.
|
5 |
C. Formoso, S. Lucio, D. C. Claudia, E. L. Issato, "Material waste in building industry: Main causes and prevention", Journal of Construction Engineering and Management, ASCE, vol. 128, no. 4, pp. 316-325, 2002.
DOI
ScienceOn
|
6 |
F. R. Hamzeh, G. Ballard, I. D. Tommelein, "Improving construction workflow-the connective role of lookahead planning", Proceedings of the 16th Annual Conference of International Group for Lean Construction, Manchester, UK, 2008, retrieved June 13, 2013 at: http://iglc.net/?page_id=40
|
7 |
F. R. Hamzeh, G. Ballard, I. D. Tommelein, "Is the last planner system applicable to design? A case study", Proceedings of the 17th Annual Conference of International Group for Lean Construction, Taipei, Taiwan, 2009, retrieved June 13, 2013 at: http://iglc.net/?page_id=28
|
8 |
H. D. Khanh, S. Y. Kim, "Identifying causes for waste factors in high-rise building projects: A survey in Vietnam", Journal of Civil Engineering, KSCE, vol. 18, no. 4, pp. 865-874, 2014.
DOI
ScienceOn
|
9 |
F. R. Hamzeh, "The lean journey: implementing the last planner system in construction", Proceedings of the 19th Annual Conference of International Group for Lean Construction, Lima, Peru, 2011, retrieved June 13, 2013 at: http://iglc.net/?page_id=232
|
10 |
F. R. Hamzeh, G. Ballard, I. D. Tommelein, "Rethinking lookahead planning to optimize construction workflow", Lean Construction Journal, ISSN 1555-1369, pp. 15-34, 2012.
|
11 |
G. Howell, G. Ballard, "Beyond can-do?", Proceedings of the 2nd Annual Conference of International Group for Lean Construction, Santiago, Chile, 1994, retrieved June 13, 2013 at: http://iglc.net/?page_id=120
|
12 |
B. T. Kalsaas, "Work-time waste in construction", Proceedings of the 18th Annual Conference of International Group for Lean Construction, Haifa, Israel, 2010, retrieved June 13, 2013 at: http://iglc.net/?page_id=225
|
13 |
B. Memarian, P. Mitropoulos, "Production practices for high reliability in concrete construction", Proceedings of the 20th Annual Conference of International Group for Lean Construction, San Diego, USA, 2012, retrieved June 13, 2013 at: http://iglc.net/?page_id=277
|
14 |
L. Koskela, Application of new production philosophy to construction. Tech. Rep. No. 72, CIFE, Stanford, CA, USA, 1992.
|
15 |
L. Koskela, "Lean production in construction", In Lean Construction, Alarcon (Ed.), A.A. Balkema, Rotterdam, The Netherlands, pp. 1-10, 1993.
|
16 |
A. Koskenvesa, L. Koskela, T. Tolonen, S. Sahlstedt, "Waste and labor productivity in production planning: case Finnish construction industry", Proceedings of the 18th Annual Conference of International Group for Lean Construction, Haifa, Israel, 2010, retrieved June 13, 2013 at: http://iglc.net/?page_id=225
|
17 |
A. Mossman, 5+1 crucial and collaborative conversations for predictable design and construction delivery. The Change Business Ltd., 2012, retrieved Nov. 15, 2012 at: http://bit.ly/LPS-5cc
|
18 |
T. Ohno, Toyota Product System: Beyond large-scale production, Productivity Press, Cambridge, MA, USA, p.143, 1988.
|
19 |
L. F. Alarcon, "Modeling waste and performance in construction", In Lean Construction, Alarcon (Ed.), A.A. Balkema, Rotterdam, The Netherlands, pp. 51-66, 1994.
|
20 |
G. Ballard, G. Howell, "Shielding production: an essential step in production control", Journal of Construction Engineering and Management, ASCE, vol. 124, no. 1, pp. 11-17, 1998.
DOI
ScienceOn
|
21 |
L. F. Alarcon, "Tools for the identification and reduction of waste in construction projects", In Lean Construction, Alarcon (Ed.), A.A. Balkema, Rotterdam, The Netherlands, pp. 365-377, 1994.
|
22 |
G. Ballard, I. D. Tommelein, L. Koskela, G. Howel, "Lean construction tools and techniques", Design and Construction Building in Value, Rick Best and Gerard De Valenche (Ed.), Woburn, MA: Elsevier Science, pp. 227-255, 2002.
|
23 |
G. Ballard, G. Howell, "Implementing lean construction: stabilizing work flow", In Lean Construction, Alarcon (Ed.), A.A. Balkema, Rotterdam, The Netherlands, pp. 101-110, 1994.
|
24 |
G. Ballard, "Lookahead planning: the missing link in production control", Proceedings of the 5th Annual Conference of International Group for Lean Construction, Gold Coast, Australia, 1997, retrieved June 13, 2013 at: http://iglc.net/?page_id=113
|
25 |
G. Ballard, The last planner system of production control, PhD dissertation, University of Birmingham, Birmingham, UK, 2000.
|
26 |
G. Ballard, G. Howell, "An update on Last Planner", Proceedings of the 11th Annual Conference of International Group for Lean Construction, Copenhagen, Denmark, 2003, retrieved June 13, 2013 at: http://iglc.net/?page_id=94
|
27 |
J. Christian, D. Hachey, "Effects of delay times on production rates in construction", Journal of Construction Engineering and Management, ASCE, vol. 121, no. 1, pp. 20-26, 1995.
DOI
ScienceOn
|
28 |
D. Ciampa, "The CEO's role in time-based competition", In Time-based Competition, Blackburn (Ed.), Business One Irwin, Homewood, IL, pp. 273-293, 1991.
|
29 |
A. S. I. Conte, "Last planner, look ahead, PPC: a driver to the site operations", Proceedings of the 6th Annual Conference of International Group for Lean Construction, Gramado, Brazil, 1998, retrieved June 8, 2013 at: http://iglc.net/?page_id=111
|
30 |
A. Enshassi, "Materials control and waste on building sites", Journal of Building Research and Information, vol. 24, no. 1, pp. 31-34, 1996.
DOI
ScienceOn
|
31 |
C. T. Formoso, E. L. Issato, E. H. Hirota, "Method for waste control in the building industry", Proceedings of the 7th Annual Conference of International Group for Lean Construction, Berkeley, CA, USA, 1999, retrieved June 13, 2013 at: http://iglc.net/?page_id=107
|
32 |
C. Fillao, V. Revelo, "Applying LPS to a construction project: a case study in Quito, Equador", Proceedings of the 10th Annual Conference of International Group for Lean Construction, Gramado, Brazil, 2002, retrieved June 13, 2013 at: http://iglc.net/?page_id=101
|