• 제목/요약/키워드: planning phase

검색결과 741건 처리시간 0.024초

건설기획단계에서의 위험요인 도출 (An Extraction of the Risk Events in the Construction Planning Phase)

  • 권순오;김선규;이낙운
    • 산업기술연구
    • /
    • 제25권B호
    • /
    • pp.99-106
    • /
    • 2005
  • The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.

  • PDF

Interactive Fuzzy Linear Programming with Two-Phase Approach

  • Lee Jong-Hwan
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • 제6권3호
    • /
    • pp.232-239
    • /
    • 2006
  • This paper is for applying interactive fuzzy linear programming for the problem of product mix planning, which is one of the aggregate planning problem. We developed a modified algorithm, which has two-phase approach for interactive fuzzy linear programming to get a better solution. Adding two-phase method, we expect to obtain not only the highest membership degree, but also a better utilization of each constrained resource.

민간 개발 프로젝트 기획단계의 분석절차 및 리스크 관리 모델 구축 (Establishment of Analysis Process and Risk Management Model of Planning Phase in Private Development Project)

  • 허열;김수용;양진국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.408-413
    • /
    • 2004
  • 민간 개발 프로젝트의 초기 기획단계는 프로젝트 전체의 성패를 좌우하는 중요한 부분이다. 하지만 기존의 기획단계 분석결과의 신뢰도는 중요도에 비해 높지가 않다. 따라서 기존 민간 개발 프로젝트 기획단계의 사례연구 및 연구자료 분석을 통해 근원적인 문제점을 분석하였다. 그 결과 기획단계의 업무 절차나 방법에 관한 체계적 분석 모델의 구축이 되지 않은 것에 그 원인이 있는 것으로 나타났다. 이에 본 연구에서는 그 해결방법으로 기획단계 분석절차 모델과 리스크 관리 모델 구축을 통해 체계적 분석방법을 제시하고자 한다. 제시된 분석방법은 기획단계 분석결과의 신뢰성을 증대시킬 수 있을 것으로 기대된다. 이와 함께 프로젝트 진행단계별 가이드라인을 제시함으로써, 프로젝트의 효율적 수행을 지원할 것으로 기대된다.

  • PDF

향토산업육성사업의 성과관리를 위한 PDCA Cycle의 적용 (A Study on the Application of PDCA Cycle for Performance Management of Promotion Project for Local Industry)

  • 손은일;호시노 사토시;송정수
    • 농촌계획
    • /
    • 제19권2호
    • /
    • pp.139-148
    • /
    • 2013
  • This study verified for the necessity for the comprehensive analysis of outcomes resulting from the local industry promotion project in many respects. To analyze the operation planning for performance management of local industry promotion project, this study redesigns the so-called PDCA(Plan${\rightarrow}$Do${\rightarrow}$Check${\rightarrow}$Act) model which is also known as Deming Cycle and verifies some hypotheses. To accomplish study purposes, 169 response samples from 85 project groups which drive the local industry promotion project were verified using SPSS 12.0. The findings are as follows: First, there was a positive relationship between the planing phase and the implementation phase. Second, there was also a positive relationship between the implementation phase and completion of the project phase. Third, there was a positive relationship between the planing phase and completion of the project phase. Finally, the implementation phase was a partial mediator on the relationship between the planing phase and completion of the project phase. Based on these findings, the implications and the limitations of the research findings were discussed, and recommendations for future research were provided.

QFD 및 Stage-gate 모델을 활용한 국방분야 개발단계 품질관리 방안 연구 (A Study on the development quality control by application of QFD and Stage-gate in defense system)

  • 장봉기
    • 품질경영학회지
    • /
    • 제42권3호
    • /
    • pp.279-290
    • /
    • 2014
  • Purpose: The purpose of this study is to propose adoption of QFD and Stage-gate in order to analyze the quality of korea defense system. Methods: Drawing change data of initial production phase in korea defense system were anlayzed and a practical method was proposed. Results: The results of this study are as follows; Off line Quality Control should be introduced in development phase. Specially, in case of defense system, the best method is QFD(Quality Function Deployment) and Stage-gate process. At first, QFD 1 step defines product planning from VOC(Voice Of Customer), QFD 2 step specifies part planning from product planning, QFD 3 step defines process planning from part planning, QFD 4 step defines production planning from previous process planning. Secondly, Stage-gate process is adopted. This study is proposed 5 stage-gate in case of korea defense development. Gate 1 is located after SFR(System Function Review), Gate 2 is located after PDR(Preliminary Design Review), Gate 3 is located after CDR(Critical Design Review), Gate 4 is located after TRR(Test Readiness Review) and Gate 5 is located before specification documentation submission. Conclusion: Off line QC(Quality Control) in development phase is necessary prior to on line QC(Quality Control) in p roduction phase. For the purpose of off line quality control, QFD(Quality Function Deployment) and Stage-gate process can be adopted.

전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로 (A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan)

  • 성현찬;김귀곤
    • 환경영향평가
    • /
    • 제6권1호
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF

정성변수를 고려한 공공아파트 기획단계 공사비 예측모델 (Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects)

  • 지성민;현창택;문현석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.91-101
    • /
    • 2012
  • 공공아파트 프로젝트의 기획단계에서 수행되는 적정 공사비 예측은 기획부터 유지관리까지 전(全) 단계에 걸쳐서 영향을 미치게 되므로 명확한 예측기준 및 방법이 제시되어야 한다. 그러나 현재까지 다양한 다중회귀모델을 활용한 공사비 예측 방법이 개발되어 왔으나, 정성변수를 포함하여 공사비를 예측하는 방법에 대한 연구는 부족한 상황이다. 따라서 본 연구에서는 기획단계 활용을 위한 정성변수를 포함하는 공사비 예측모델을 개발하고자 하였다. 이를 위하여 공사비 영향요인을 분석 및 추출하고, 회귀분석을 위한 독립변수를 선정하였다. 그리고 정성변수를 포함하는 공사비 예측모델을 개발하며 사례적용을 통한 검증을 실시하였다. 개발된 공사비 예측모델과 "RESAMPLING 기법"을 사용하여 구조형식별 공사비 가산비율을 제시하였다. 본 연구에서 제시한 더미회귀모델과 가산비율을 활용하면, 일반적인 공사비 예측과 함께 동일한 평형, 세대수, 연면적에서 평면형식과 구조형식을 변경시켰을 때의 공사비 예측이 가능할 것으로 기대된다.

양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안 (A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning)

  • 김진호
    • 한국건축시공학회지
    • /
    • 제8권3호
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

지속가능한 도시개발사업 추진을 위한 계획시스템 개선방안 -환경생태계획 도입을 중심으로 - (Improving of Planning System for Sustainable Urban Development -Focus on Introducing Environmental and Ecological Planning-)

  • 최희선;권영한
    • 환경정책연구
    • /
    • 제8권3호
    • /
    • pp.27-51
    • /
    • 2009
  • 본 연구는 도시화 과정의 하나로 일어나는 개발사업이 지속가능한 형태로 추진되기 위한 방안을 모색하였으며, 그 중에서도 현재 대규모 개발사업인 신도시를 중심으로 적용하고 있는 환경생태계획의 실태와 문제점을 심층 검토하고 개선방안을 도출하고자 하였다 특히 도시 관련 개발사업 중 크게 구분할 수 있는 도시개발사업(도시개발법에 근거)과 택지개발사업(택지개발촉진법에 근거)의 입지 및 개발방식의 차별성을 고려하여 개선방안을 제시하였다. 우선, 선행 연구결과들을 바탕으로 설정한 원칙과 문제점에 근거하여 환경생태계획 대상 사업 규모를 설정하였으며, 환경생태계획의 절차적 개선방안에서는 크게 입지 및 지구지정 단계, 개발계획단계, 실시계획 단계, 사후관리 단계로 구분하여 문헌과 전문가 의견수렴을 바탕으로 문제점 및 해결방안을 제시하였다. 계획체계 측면 개선을 고려한 환경생태계획의 내용적 범위는 계획의 개요, 환경생태구상, 공간구조 골격 구상, 도시환경 재생 및 영향 저감계획으로 구분하여 도출되었다. 특히 도시개발사업은 복원 혹은 새롭게 창출해야 하는 조성녹지 확보와 이를 고려한 생태적 연결성 확보, 그리고 생태면적률 확보가 택지개발사업은 보전지역과 환경용량, 광역녹지축 등의 고려가 차별성 있게 고려되어야할 것으로 보인다. 이상의 결과들을 종합하여 환경생태계획과 개발계획, 환경성평가 각각의 기능과 연계성을 정립하였으며, 이들 간의 연계성 정립을 통해 장기적으로 지속가능한 토지개발이 가능한 형태로 발전될 것으로 판단되었다.

  • PDF

인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델 (Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network)

  • 한형동;김정환;윤중호;서종원
    • 대한토목학회논문집
    • /
    • 제31권6D호
    • /
    • pp.829-837
    • /
    • 2011
  • 공사비 견적이란 건설공사를 수행하는데 소요되는 공사비를 산정하는 것으로, 공사 기획단계에서 사용하는 개략견적은 다양한 목적으로 사용된다. 한편, 도로공사의 경우, 현행 사용되는 개략견적방법은 과거의 실적자료를 산술평균하여 단위 km당 공사비를 제시한 것으로 실제 개략공사비로 활용하기에는 어려움이 있다. 본 연구에서는 기획단계의 도로공사견적 산정방식에 대한 한계를 해결하기 위하여, 인공신경망을 적용한 개략공사비 모델을 제시하는 것을 목적으로 한다. 도로건설 공사입찰을 위한 기본설계도면 작성 이후 공사비를 결정하는 변수를 포함한 과거 실적 자료를 바탕으로 인공신경망을 적용하여 기획단계에서 공사비 예측이 가능한 도로 공사비를 개략견적 하는 모델을 설계하였으며, 시행착오방식을 이용하여 모델의 변수들을 최적화하였다. 또한 최적화된 모델을 통해 나온 결과를 회귀분석을 적용한 결과와 비교하여 정확도가 뛰어남을 검증하였다. 제안된 인공신경망모델은 차후 도로건설공사의 개략공사비 산정을 위한 활용될 것으로 기대된다.