• Title/Summary/Keyword: planning and production factors

검색결과 189건 처리시간 0.022초

수요 예측 평가를 위한 가중절대누적오차지표의 개발 (A New Metric for Evaluation of Forecasting Methods : Weighted Absolute and Cumulative Forecast Error)

  • 최대일;옥창수
    • 산업경영시스템학회지
    • /
    • 제38권3호
    • /
    • pp.159-168
    • /
    • 2015
  • Aggregate Production Planning determines levels of production, human resources, inventory to maximize company's profits and fulfill customer's demands based on demand forecasts. Since performance of aggregate production planning heavily depends on accuracy of given forecasting demands, choosing an accurate forecasting method should be antecedent for achieving a good aggregate production planning. Generally, typical forecasting error metrics such as MSE (Mean Squared Error), MAD (Mean Absolute Deviation), MAPE (Mean Absolute Percentage Error), and CFE (Cumulated Forecast Error) are utilized to choose a proper forecasting method for an aggregate production planning. However, these metrics are designed only to measure a difference between real and forecast demands and they are not able to consider any results such as increasing cost or decreasing profit caused by forecasting error. Consequently, the traditional metrics fail to give enough explanation to select a good forecasting method in aggregate production planning. To overcome this limitation of typical metrics for forecasting method this study suggests a new metric, WACFE (Weighted Absolute and Cumulative Forecast Error), to evaluate forecasting methods. Basically, the WACFE is designed to consider not only forecasting errors but also costs which the errors might cause in for Aggregate Production Planning. The WACFE is a product sum of cumulative forecasting error and weight factors for backorder and inventory costs. We demonstrate the effectiveness of the proposed metric by conducting intensive experiments with demand data sets from M3-competition. Finally, we showed that the WACFE provides a higher correlation with the total cost than other metrics and, consequently, is a better performance in selection of forecasting methods for aggregate production planning.

불규칙한 형상의 박판제품에 관한 블랭킹 및 피어싱용 공정설계 시스템(II) (An Automated Process Planning System for Blanking or Piercing of Irregular-Shaped Sheet Metal Products (ll))

  • 최재찬;김병민;김철;김재훈;김호관
    • 한국정밀공학회지
    • /
    • 제14권7호
    • /
    • pp.39-48
    • /
    • 1997
  • This paper describes the process planning system of a computer-aided design of blanking and piercing for irregularly shaped sheet metal products. An approach to the system is based on knowledge-based rules. The process planning system is designed by considering several factors, such as the complexity of blank geometry, production feasibility of products, and punch profile complexity. Therefore this system which was implemented production feasibility check and strip layout module can carry out a process planning considering a production feasibility area of both internal and external features, a dimension of blanked hole, a coner and a fillet radius for irregualrly shaped sheet metal products and generate the strip layout in graphic froms. Knowledges for process planning are extracted from plasticity theories, handbooks, relevant references and empirical know- hows of experts in blanking companies. This provides powerful capabilities for process planning system of irregularly shaped sheet metal products.

  • PDF

중소기업 낭비제거에 의한 생산속도 향상 실험분석 연구 (A study on experimental analysis of production speed improvement by waste elimination of middle and small-sized companies)

  • 이성일;강경식
    • 대한안전경영과학회지
    • /
    • 제18권4호
    • /
    • pp.131-137
    • /
    • 2016
  • In unlimited competition era changed rapidly, productivity improvement and raw cost reduction by working improvement are very important for the survival of middle and small-sized companies. At this moment, middle and small-sized companies are cleary important in domestic industry. Therefore, this researcher applied TPS(Toyota production system) 7 wastes by experiment planning method for wastes of lots of working processes at the manufacturing site of automobile assembly manufacturing company, D company, analyzed current system of D company applied so as to verify if value creation works and factors were minimized during the production and drew results by analyzing experimental planning for analyzing waste elimination.

바이오매스 부존특성을 고려한 농촌지역 바이오에너지 보급전략 (Strategic Planning for Bioenergy Considering Biomass Availability in Rural Area)

  • 홍성구
    • 한국농공학회논문집
    • /
    • 제50권4호
    • /
    • pp.51-58
    • /
    • 2008
  • Unit costs for energy production in bioenergy facilities are dependent upon both fixed cost for facility construction and operational costs including biomass feedstock supply. With the increase of capacity, unit fixed cost could be decreased while supply cost tends to increase due to the longer transportation distance. It is desirable to take into account biomass availability in planning bioenergy facilities. A cumulative curve relationship was proposed to relate biomass availability and cumulative products of biomass amount and transportation distance. Optimum size of gasification facilities was affected by collection cost, biomass cumulative relationship. Based on biomass availability of Icheon-City, optimum sizes were about $400kW_{th}$ for gas production, and about $200kW_{el}$ for power generation. Unit cost of bioenergy production could be substantially reduced by reducing collection cost through supplying biomass from diverse sources including land development areas where significant amount of waste wood is generated. When planning bioenergy facilities, however, biomass availability and spatial distribution are key factors in determining the size of capacity.

반도체 제조를 위한 고도화 계획 및 일정 관리 시스템 구축 : 국내 반도체 업체 사례 (Advanced Planning and Scheduling (APS) System Implementation for Semiconductor Manufacturing : A Case at Korean Semiconductor Manufacturing Company)

  • 임승길;신용호
    • 산업공학
    • /
    • 제20권3호
    • /
    • pp.277-287
    • /
    • 2007
  • Semiconductor manufacturing is one of the most complex and capital-intensive processes composed of several hundreds of operations. In today’s competitive business environments, it is more important than ever before to manage manufacturing process effectively to achieve better performances in terms of customer satisfaction and productivity than those of competitors. So, many semiconductor manufacturing companies implement advanced planning and scheduling (APS) system as a management tool for the complex semiconductor manufacturing process. In this study, we explain roles of production planning and scheduling in semiconductor manufacturing and principal factors that make the production planning and scheduling more difficult. We describe the APS system implementation project at Korean semiconductor manufacturing company in terms of key issues with realistic samples.

What Do Learners Do While Planning? Learners' Use and Perceptions of Planning for an Oral Narrative Task

  • Park, Su-Jung
    • 영어어문교육
    • /
    • 제15권3호
    • /
    • pp.223-248
    • /
    • 2009
  • Previous research on the impact of pretask planning on subsequent second language (L2) production has mainly focused on the linguistic quality of planned production, while learners' thought processes and perceptions about planning have been relatively less explored. In addition, few previous planning studies have examined whether the learners did in fact follow the pretask instructions, thus leaving the role of pretask instructions in the planning process unexplored. Therefore, the present study investigated whether pretask instructions affect attentional allocation as well as what cognitive operations planners engage in and what their perceptions about planning are. Forty-three Korean EFL classroom learners were divided into two groups: before having time to plan for an oral story retelling task, one group received general instructions, while the other group received specific instructions. The findings, based on both quantitative and qualitative data analysis, indicated no large effects of pretask instructions on the planners' attentional focus. Rather, the qualitative analysis identified a number of other factors that influenced learners' decision making as well as their general processes and approaches to planning and their perceptions about planning and thinking aloud while planning. Implications for L2 teaching as well as limitations of the study are discussed.

  • PDF

A study Note on the Production Process of the Year-end Special Documentary on the Inter-Korean Summit of KTV

  • Hakjae, Lee
    • International Journal of Advanced Culture Technology
    • /
    • 제10권4호
    • /
    • pp.228-229
    • /
    • 2022
  • This paper is about KTV special documentary "Baekdu to Halla, It's Peace Now" which looks back on the journey of President Moon Jae-in to the 3rd inter-Korean summit following former Presidents Kim Dae-jung and Roh Moo-hyun, following the 2018 inter-Korean summit held under the slogan of 'Peace and a New Future'. The documentary was produced in the form of a road documentary that looked back at the meaningful results of the summit meeting with the MC through related places and various people, narrated by singer Kang San-Ae. Based on this case, the difference between the development of road documentaries and general informational documentaries about the existing production process is identified, and the differences between the production format, production characteristics, and development method of road documentaries are described. I would like to present an example of how it can be desirable to set the format of the road documentary according to the production environment of broadcasting companies and planning factors.

A Study on the Reproduction Strategy through the Planning Process of Baby Shark

  • Cho, Hyung Kyung
    • International Journal of Advanced Culture Technology
    • /
    • 제8권3호
    • /
    • pp.101-105
    • /
    • 2020
  • In this study, the aim is to understand the strategy of video content production with the case of the baby shark development process of Pink Fong Company, the content is described about the successful planning and strategy of baby shark which has become a global content, and the main point describes the planning of the production process and marketing strategies for each country. The findings of the conclusions resulted in the application of the standards of globalization and the local understanding of culture as the main factors for content success. If the Pink Pong Company's method is applied through this, it is possible to apply what is the main issue of creative content production Reproduction in the future.

PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구 (A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members)

  • 전영훈;신은영;윤원건;김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

합성 PC 부재의 현장생산 및 설치 공정계획의 영향요소 분석 (An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.176-177
    • /
    • 2013
  • The composite PC rahmen structure, called Green Frame, allows the main structural members such as PC column and beam to be produced on the site, resulting in a reduction of PC member transportation cost and the margin of PC plant (operation cost and profit), making it more economic than the bearing wall structure. To apply the Green Frame to practice, not only installation but also insitu-production process should be considered. Therefore, this study analyse the influence factors on insitu-production and installation schedule of composite precast concrete members. The results shall be used as basic criteria on the planning of insitu-production and installation of Green Frame.

  • PDF