Browse > Article
http://dx.doi.org/10.12812/ksms.2016.18.4.131

A study on experimental analysis of production speed improvement by waste elimination of middle and small-sized companies  

Lee, Sung-Ill (Department of Industrial management Engineering, MyoungJi University)
Kang, Kyung-Sik (Department of Industrial management Engineering, MyoungJi University)
Publication Information
Journal of the Korea Safety Management & Science / v.18, no.4, 2016 , pp. 131-137 More about this Journal
Abstract
In unlimited competition era changed rapidly, productivity improvement and raw cost reduction by working improvement are very important for the survival of middle and small-sized companies. At this moment, middle and small-sized companies are cleary important in domestic industry. Therefore, this researcher applied TPS(Toyota production system) 7 wastes by experiment planning method for wastes of lots of working processes at the manufacturing site of automobile assembly manufacturing company, D company, analyzed current system of D company applied so as to verify if value creation works and factors were minimized during the production and drew results by analyzing experimental planning for analyzing waste elimination.
Keywords
Experiment planning method; TPS(Toyota production system); SNR;
Citations & Related Records
연도 인용수 순위
  • Reference
1 2 persons including Mun Jung-mun.(2002), "Mesures to imrpove productivity by eliminating waste of construction process", Collected papers of construction society.
2 Park Sang-young.(2007), "Improvement of manufacturing process and quality of optical engine module with taguchi experiment planning", Master's thesis.
3 Park Sang-young.(2006), "improvement of manufacturing process and quality of optical engine module with taguchi experiment planning", Academic journal of Korea facility management, 89-98.
4 Park Sung-hyun.(1997), "Application experiments design focusing on taguchiexperiment planning", Youngjimunhwasa.
5 Park Sung-hyun.(2005), "Modern experimental planning", Minyoungsa.
6 Lee Sang-bok.(2008), "Experiment planning focusing on exemplary problems with mini tap", Iretech, 15.
7 Yang Jong-taek.(2001), "A study on management outcomes of Toyoga production", 14.
8 Jung Young-ho.(2003), "A study on rear shock pressure process with taguchi planning", Master's thesis.
9 Hyun So-young.(2001), "A study on performance improvement of dense press structure with taguchi planning", Master's thesis of mechanical engineering.