• Title/Summary/Keyword: pilot excavation

Search Result 26, Processing Time 0.021 seconds

A Case Study on the Application of Safely Analysis for the Tunnel Adjacent to the Pier (교각에 근접한 터널의 안정성 평가에 대한 사례 연구)

  • 이선복;윤지선
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2003
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t)=a[1-exp(-bt)].

Safety analysis for the tunnel adjacent to the pier (교각에 근접한 터널의 안정성 평가)

  • Lee, Sun-Bok;Yoon, Ji-Son
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.4
    • /
    • pp.313-324
    • /
    • 2004
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t) = a[1-exp(-bt)].

  • PDF

Behavior of shallow 2-Arch tunnel due to excavation under horizontal discontinuity plane (수평 불연속변 하부에 굴착한 얄은 심도의 2-Arch 터널의 거동)

  • Cheon, Eun-Sook;Kim, Hong-Moon;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.227-237
    • /
    • 2005
  • In this study, the behavior of shallow 2-Arch tunnel due to excavation under horizontal discontinuity plane was verified experimentally. The model tests were carried out by varying the overburden height and the location of the discontinuity plane. The model tests followed exactly the real 2-Arch tunnel construction stages. As a result, it is discovered that stress-transfer mechanism and loosening area around the 2-Arch tunnel depends on the overburden heights and the location of the discontinuity plane. And central pillar load is also dependent on overburden height, location of discontinuity plane and construction stages.

  • PDF

Behavior of 2-Arch Tunnel with Stiffness of Grouting (그라우팅 강성도에 따른 2-Arch 터널의 거동)

  • Lee, Jong-Min;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.4
    • /
    • pp.260-266
    • /
    • 2010
  • In this study, wish to analyze effect that affect on each tunnel (right and left tunnel) according as proceeding of leading tunnel (right tunnel), following tunnel (left tunnel) and pilot tunnel excavation through behavior of tunnel and surrounding base by model tests. And stress-transfer mechanism that occurs from in-situ loosing area and arching effect by difference of stiffness ratio and overburden heights were verified experimentally. The model tests were carried out by varying the stiffness of reinforced area and overburden height, measured deformation of tunnel and displacement of surrounding base. The model tests followed exactly the real 2-Arch tunnel construction stages.

A study on pilot Test of the Composition Presplitting Angle Cut method in tunnel blasting (터널 심발부의 선균열을 이용한 발파공법의 현장시험에 관한 연구)

  • Hwang, Hak;Lee, Tai Ro
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.287-300
    • /
    • 2002
  • Composition Presplitting Angle Cut (COPA-Cut) is a newly developed blasting method for tunnel excavation. Contrary to existing methods, COPA-Cut first creates presplitting by tension crack in cut. In this study, field tests measuring the advance efficiency, noise and ground vibration were performed in order to verify the presplitting effect. To compare the economy and workability, tests were simultaneously performed by COPA-Cut and existing method on the same condition. Results show that COPA-Cut increased advance efficiency and decreased noise and ground vibration. Also, it was confirmed that COPA-Cut is superior to existing method in terms of economy, workability and quality control.

  • PDF

New Construction and Design Method of Two Arch Tunnel (최신 투 아치 터널의 굴착 공법과 구조 및 설계)

  • Yun, Seok-Ryul;Kwon, Oh-Hyun;Seo, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.938-945
    • /
    • 2004
  • In order to cope with ever growing traffic flow and complexity in the urban area, construction demands for expanding and realigning of existing urban roads and massive development of underground space within the urban area are in its increasing trend, it is fact that, mainly due to lack of statistical data accumulation through real construction, technology and construction practice to support such demands can hardly be said to have been established enough and leave many things still to be developed. These circumstances therefore came to motivate me to get into a study for a particular subject of "Design Basics for Closely Neighbored Twin Tunnel" among others, and also to put forward subjects required to be further studied in this connection in the future as follows: 1) To make a new economical design model for closely neighbored twin tunnel not only to make a drain for center perfect but also a tunnel construction safe. 2) Further efforts should be exerted for establishment of general standards for design and construction of various types of large cross-section tunnels including Twin structure.

  • PDF

An Investigation of the deformation of underground excavations in slat and potash mines

  • Kwon, Sang-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1998.05a
    • /
    • pp.83-114
    • /
    • 1998
  • The most widely accepted method for understanding the deformation mechanism of rock is from the use of computer simulation. However, if the changes in rock properties after excavation are significant this will prevent the computer simulation kent predicting the deformation with acceptable accuracy. If the deformations are, however, carefully measured in situ, the resulting data can be more useful far predicting the deformational behavior of underground openings, since the effect of the parameters which influence the deformational behavior are included in the measurement. In this study, extensive data analyses were carried out using the deformation measurements from the Waste Isolation Pilot Plant (WIPP), which is a permanent nuclear waste repository The results from computer simulations were compared with field measurements to evaluate the assumptions used in the computer simulations, For better description of the deformational behavior around underground excavations, several techniques were developed, namely: (a) the calculation of the zero strain boundary; (b) the evaluation of the influence of adjacent excavations on the deformational behavior of pre-excavated openings; (c) the description of the deformational behavior using in situ measurements; (d) the calculation of the shear stress distribution; and (e) the application of a Neural Network for the prediction of opening deformation.

  • PDF

Application of Prefabricated Retaining Walls with Steel Lagging (강재 요소를 적용한 조립식 흙막이 벽체에 관한 연구)

  • Hong, Jong woo;Choi, Jae Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1277-1285
    • /
    • 2015
  • It has been known that the conventional retaining wall system with timber lagging and H pile has several problems such as the irregular gap between H-piles, cutting or adding to standard timber, back fill over first step excavation, and especially break-down accident at the disjoint of wall system. In the practical excavation, these problems may lead to worker's accident and the inefficiency of construction economy. To solve the above problems, a new method using prefabricated retaining wall was proposed and verified. The characteristics of the new method is to replace timber wall as free-sliding steel-lagging and connector. To check its verification and application, laboratory tests such as bending strength, tensile strength, and fatigue strength were carried out. Also, a pilot test in the field and numerical simulations under various ground conditions were performed. From the researches, it is found that the prefabricated retaining wall plate can be superior to the conventional timber lagging plate in the strength. It is also found that the proposed methods can be effective in the reuse of retaining wall plate and safe in the disjoint of wall system. Finally, it is desired that the proposed method will be effective in the reduction of the imported timbers and helpful in the safety of retaining wall construction.

A Case Study on Electronic Recognition Sensor for Underground Facility Management System (지중 매설물 이력 관리 시스템 개발을 위한 전자인식기의 현장 적용성 검증 연구)

  • Jung, YooSeok;Kim, Soullam;Kim, Byungkon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.777-785
    • /
    • 2021
  • Many utility lines are buried underground to provide various functions of the city. Because historical records are not managed systematically, damage has occurred during excavation. In addition, the demand for an underground facility management system is increasing as the aerial underground project is progressing. By attaching an electronic recognition sensor to an underground facility, such as pipelines, the management history and site conditions can be carefully managed. Therefore, in this study, electronic recognition sensors, such as BLE Beacon, UHF RFID, geomagnetic sensor, and commercial marker, were tested to analyze the strengths, weaknesses, and field applicability through a pilot project. According to the limited research results collected through two pilot projects, the installation depth is most important to demonstrate the performance of the electronic reader. In addition, because it should be used in urban areas, the influence of environmental interference should be minimized, and there should be no performance degradation over time. In the case of the geomagnetic recognizer, the effect of environmental interference was large, and performance degradation occurred over time using the BLE Beacon. In the field situation, where the installation depth can be controlled to less than 40cm, the utility of the battery-free UHF RFID was the best.

A Case Study of PC-Culvert Construction with Foundation Plate (기초판 보강형 PC 암거의 시공사례 연구)

  • You, Jun;Choi, Chang-Ho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.2
    • /
    • pp.13-19
    • /
    • 2011
  • Precast culvert system is generally constructed with a series of process such as excavation, ground mitigation, placement of culverts, anti-leakage packing between adjacent culverts, post-tensioning for PS strands and backfilling. In this process inappropriate ground mitigation often causes differential settlement and, correspondingly, makes water-leakage to be occurred between adjacent boxes. This study was performed to understand the behavioral characteristics of recently proposed precast foundation plate to support precast culvert system through on-site pilot construction. The gap between two adjacent culverts, increment of earth pressure at the bottom of culvert, vertical settlement of top of the culverts were monitored using various sensors. The monitoring results showed that the proposed foundation plate provides better culvert system in the points of less gap development, earth pressure and settlement at the adjacent of two culverts.