• Title/Summary/Keyword: overhead catenary system

Search Result 71, Processing Time 0.032 seconds

Study for Catenary System in High Speed Railway Long Tunnel applied UIC Standard (UIC 규격을 적용한 고속철도 장대터널구간의 전차선로 검토)

  • Ahn, Young-Hoon;Song, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1924-1929
    • /
    • 2010
  • In long tunnel If we reduce the length of system height on catenary system, tunnel construction cost is cut down. It is because of tunnel section curtailment. So that we have review reduction of system height according to tunnel section. We have designed reduction of system height considered characteristics of overhead contact systems within UIC 799 code.

  • PDF

Numerical characterization of real railway overhead cables

  • Sanchez-Rebollo, Cristina;Velez, Enrique;Jimenez-Octavio, Jesus R.
    • Wind and Structures
    • /
    • v.21 no.1
    • /
    • pp.105-117
    • /
    • 2015
  • This paper presents a numerical characterization of real railway overhead cables based on computational fluid dynamics (CFD). Complete analysis of the aerodynamic coefficients of this type of cross section yields a more accurate modelling of pressure loads acting on moving cables than provided by current approaches used in design. Thus, the characterization of certain selected commercial cables is carried out in this work for different wind speeds and angles of attack. The aerodynamic lift and drag coefficients are herein determined for two different types of grooved cables, which establish a relevant data set for the railway industry. Finally, the influence of this characterization on the fluid-structure interaction (FSI) is proved, the static behavior of a catenary system is studied by means of the finite element method (FEM) in order to analyze the effect of different wind angles of attack on the stiffness distribution.

Simulation-based Parametric Study of the Current Collection System of High Speed Trains (시뮬레이션에 의한 고속전철용 집전시스템 매개변수 연구)

  • 한형석
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.4
    • /
    • pp.279-285
    • /
    • 2003
  • In an electric traction system in which power is supplied from a catenary via a pantograph, the mechanical design of the catenary and pantograph is clearly of importance in relation to the problem of current collection at high speed. A computer-simulation technique is used to study the effects of changing parameters of pantograph and catenary on the quality of current collection at high speed. The current collection system is evaluated on the basis of the contact-force variations and displacement responses of the pantograph and contact wire. This study shows that current-collection quality is determined primarily by the overhead line parameters rather than by the pantograph. The results can be applied to optimize the design of current-collection systems.

Safety Assurance of Dropper Clamp in Overhead Catenary System(I) (전차선로 드롭바 클램프 안전성 확보(I))

  • Lee, Ki-Won;Cho, Yong-Hyeon;Park, Young;Min, Byung-Il;Kwon, Sam-Young;Seok, Chang-Sung
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.223-226
    • /
    • 2007
  • In the electrical railway, for the improvement of a train speed, it is necessary to study not only the dynamic behaviors of overhead catenary system but the fatigue behaviors of components for a safety assurance according to the increase of vibration level. One of the critical components in the system is a dropper. Therefore, the dynamic force acting on a dropper was measured in the Chungbuk Line and analyzed to figure out the dynamic characteristics the dropper. And in order to assure the safety of dropper clamp and cable, we proposed a test facility as well as test method based on the test results For the further study, we will measure the dynamic forces in the conventional line and high-speed line and make up the test condition, so that the safety of dropper clamps can be assured.

  • PDF

Implementation Technique of Real-time Monitoring System for High-Speed Rail Contact Wire with High Tension (고속철도 전차선로 고장력 실시간 모니터링 기술 구현)

  • Cho, Yong Hyeon;Park, Young;Jung, Hyun Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.8
    • /
    • pp.1256-1261
    • /
    • 2015
  • Along with the increase of railway catenary system operation speed to 400 km/h, there have been growing demands for good quality current collection systems that satisfy quality standards as well as criteria for safe working. Retaining uniform elasticity tension of contact wires is essential in maintaining high quality contact between pantograph and OCL (Overhead Contact Line) of current collection systems in high speed railways. Therefore, the tension of contact wire must be kept within tight tolerance limits in both working conditions and adverse weather conditions of catenary system. In accordance with these conditions, this paper presents a real time monitoring system for the tensioning device of the newly installed catenary system on the special route of Honam high speed line for 400 km/h operation. For the verification of the true value of tension of contact wires, we have developed ring-type tensioning sensors which were installed on supporting points of mast which compose the catenary system. According to the field test performed on the Honam high speed line catenary system, variation of tension was measured accurately in real-time.

A Study on the Effects of Construction Tolerances on the Current Collection Performance for High Speed Catenary System (고속전차선로의 시공 허용오차가 집전성능에 미치는 영향에 관한 연구)

  • Kim, Tae-Hun;Seo, Ki-Bum;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1782-1788
    • /
    • 2015
  • In this paper, analysis of the effects for construction tolerances on the current collection performance of high speed catenary system. The height of the contact wire is the geometrical position of the cantilever directly affects the current collection performance. Contact force when the height of the contact wire exceeds the construction tolerance were analyzed. As a result, the maximum contact force was analyzed to more than 350[N] that are recommended by EN50119. And when the geometrical position of the cantilever to exceeds the construction tolerance, the analysis results of uplift at the mast support points, it becomes 127[mm] that are recommended by UIC 799. If the construction tolerances exceeds the reference value, the current collection performance is deteriorated. Therefore, catenary system require high precision construction. In the future, there is a need for continuing research on the tolerance of catenary system in the actual operating state.

On the Implementation of an Advanced Judgement Algorithm for Contact Loss of Catenary System (전차선의 집전상태 판단 알고리즘 구현)

  • Park, Young;Jung, Ho-Sung;Yun, Il-Kwon;Kim, Wonha
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.850-854
    • /
    • 2014
  • Analyzing dynamic performance between pantograph and contact wire depends on mechanical and electrical conditions such as contact force, currents, aerodynamics of pantograph and tension of overhead contact wire. For the characteristic of dynamic performance between pantograph and overhead contact wire, various evaluation systems are used to measuring of the interaction of the contact line and the pantograph. Among the various methods, the contact force and percentage of arcing are intended to prove the safety and the quality of the current collection system on the train. However, these methods are only capable of measuring on the train which are installed measurement systems. Therefore in this paper, a track-side monitoring system was implemented to measure electrical characteristics from active overhead contact wire systems in order to constantly estimate current collection performance of railway operation. In addition, a method to analyze loss of contact phenomena was proposed. According to simulation results, the proposed system was capable of measuring abnormal electrical behavior of pantograph and contact wires on the track-side. The advantage of the proposed system is possible to detect loss of contact or any other electrical abnormalities of all types of trains within sections from sub to sub without the need to install any on-board equipment on trains.

Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side (선로변 전차선과 조가선의 전류를 이용한 집전성능 분석 기술)

  • Park, Young;Shin, Seung-Kwon;Lee, Kiwon;Kim, Jaemoon;Kim, Wonha
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.573-576
    • /
    • 2013
  • In this paper, analysis method for current collection performance based on real-time current of catenary system is proposed. An innovative method based on track-side of railway system is used for measurement of currents for overhead contact line during the collection with pantograph. The evaluation of a qualitative ratio for current collection performance were conducted using proposed algorithm under various conditions such as laboratory and track-side. To check the validity of our approach, we compared between calculation results from current of contact wire and measurement results from arcing of pantograph using simulator in laboratory conditions. The results show that the behavior of current collection performance were analysis from currents of overhead contact line in AC electric railway system.

Technique of Tension Length Calculation for 350km/h High Speed Catenary System (최고운행속도 350km/h급 전차선로 장력구간길이 계산 기법)

  • Chang, Sang-Hoon;Lee, Ki-Won;Kwon, Sam-Young;Park, Jae-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.932-939
    • /
    • 2011
  • This paper deal with technique of tension length calculation for 350km/h high speed catenary system. Tension length affects in facility investment. Possibility of overlap increasing a tension length and the equipment investor decreases in order to decrease. Considers the parameter which specifies and the grudge which is possible long the fact that decides a tension length is the aim which is important plans overhead contact line. The element which decides a tension length with next following; (i) Operating range of tension device, (ii) Change of the horizontal tension which affects possibility of the effect which operates to the line and span, (iii) Tension of wire material the tensile force which is relation, (iv) Wire thermal expantion which relates with a standard temperature, (v) Curve radius, (vi) Wind velocity, (vii) Thermal range of overhead contact wire and mechanical design of tension mechanism etc.

  • PDF