• Title/Summary/Keyword: optimal planning

Search Result 1,257, Processing Time 0.031 seconds

Development of Optimal Process Planning for Exit Burr Minimization in Milling Operation (절삭가공 시 출구 버어의 최소화를 위한 최적 가공계획 알고리즘의 개발)

  • Kim, Young-Jin;Kim, Ji-Hwan;Jung, Hee-Chul
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.16 no.1
    • /
    • pp.33-39
    • /
    • 2007
  • One of the most important processes is the face milling in processing task. It makes the smooth surface of processed goods. In processing stage, the formation of burr is inevitable. The formed burr decreases a detailed drawing and effects the safety of workers. So, it causes a deburring process for removing and a bottle-neck condition. Therefore, the study which can minimize the generation of burr is needed. In this paper, complex feature, such as line, arc, circle, spline is studied more reality than any other papers. And also, the algorithm which can predict the path of generated burr is established. Moreover, the finality goal is that the system which can produce tool-path minimized has to be developed.

Heuristics for Synchronization of Production and Transportation Planning in the Supply Chain (공급사슬에서 생산 및 물류의 동기화를 위한 발견적 기법)

  • Jeong Jeong-U;Lee Yeong-Hae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.159-166
    • /
    • 2006
  • The aim of synchronization of production and transportation planning in the supply chain is to increase the flexibility and to decrease various costs. The suggested model in this study synchronizes the timing to supply to a downstream manufacturer directly after production and to be consumed in a downstream manufacturer right after receipt. This model deals with the frequent delivery in small amount which is a new trend of the transportation not governed the economy of scale principle. Moreover, various types of transportation governed by the economy of scale principle or not are considered. Then, the two-phase mathematical model is suggested to obtain optimal job sequence and production quantity for each tasks. But, it is difficult to gain optimal solutions if there is a transportation governed by the economy of scale principle in the supply chain, or the size of the problem is increased. Thus, heuristic algorithms based on simulated annealing and genetic algorithm are suggested to find good solutions in the reasonable time.

  • PDF

Optimal Routing Based on Genetic Algorithms for Distribution System Planning (유전 알고리즘을 이용한 배전 계통 계획의 최적 경로 탐색)

  • Kim, Min-Soo;Kim, Byung-Seop;Shin, Joong-Rin;Yim, Han-Suck
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.137-140
    • /
    • 1999
  • This paper presents an application of the Genetic Algorithms(GA) to solve the optimal routing problem(ORP) in power distribution system planning. Since the ORP is, in general, modeled as a mixed integer problem with some various mathematical constraints, it is hard to solve. In this paper, a new approach was made using the GA method for the ORP to overcome the disadvantages which many conventional methods generally have. For this approach, proposed was in this study a appropriately designed fitness function suited for the ORP. The proposed algorithm has been tested in sample network and the results are presented.

  • PDF

An Algorithm for Estimating Time-cost-Quality Trade-offs in the Selection of the optimal Design Specifications (최적품질설계(最適品質設計)를 위한 비용(費用), 품질제조시간(品質製造時間)의 종합적(綜合的) 최적화방안(最適化方案))

  • Lee, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.4 no.1
    • /
    • pp.13-19
    • /
    • 1976
  • In the quality planning phase, the techniques for measuring cost-quality trade-offs are used for the selection of the optimal design specifications when design flexibility permits significant trade-offs to be made. But the product quality is not only depends on the developing cost, but also the time for developing that product. Therefor it is important to seek a methodology for estimating time-cost-quality trade-offs associated with the quality planning projects. This paper is aimed to find a methodology of time-cost-quality trade-offs and to develop a proper algorithm.

  • PDF

Decision Making Model for Optimal Earthwork Allocation Planning (최적 토량배분 계획을 위한 의사결정 모델)

  • Gwak, Han-Seong;Seo, Byoung-Wook;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.162-163
    • /
    • 2016
  • This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.

  • PDF

Optimal Production Capacity and Outsourcing Production Planning for Production Facility Producing Multi-Products (다제품을 생산하는 생산설비에 대해 최적 생산용량과 외주생산계획)

  • Chang, Suk-Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.4
    • /
    • pp.110-117
    • /
    • 2012
  • The demand for facility used in producing multi-products is changed dynamically for discrete and finite time periods. The excess or the shortage for facility is occurred according to difference of the facility capacity size and demand for facility through given time periods. The shortage facility is met through the outsourcing production. The excess facility cost is considered for the periods that the facility capacity is greater than the demand for the facility, and the outsourcing production cost is considered for the periods that the demand for facility is greater than the facility capacity. This paper addresses to determine the facility capacity size, outsourcing production products and amount that minimizes the sum of the facility capacity cost, the excess facility cost and the outsourcing production cost. The characteristics of the optimal solution are analyzed, and an algorithm applying them is developed. A numerical example is shown to explain the problem.

An Optimal Path Planning of the Autonomous Guided Vehicle in the Environment with Dynamic Obstacles (동적 장애물 환경에서 자율운송장치의 최적 경로 계획)

  • Lee, Yun-Bae
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.3
    • /
    • pp.343-353
    • /
    • 1995
  • The path navigation of autonomous guided vehicle(AGV) or autonomous mobile robot(AMR) assumed that the environment was completely known and the obstacles were fixed. So that, in an environment only partly known or not known at all, the previous works were not successful since the path exploration techniques involved in the work were neither directly applicable nor extensible. In order to improve such problems, this paper was adopted the quadtree technique and proposed the algorithm for an optimal path planning autonomously in an environment and proved a validity through a simulation.

  • PDF

A Study on the Development of Industrial Power Management System (수용가 전력관리시스템 개발 연구)

  • Moon, Young-Hwan;Seong, Ki-Chul;Yoon, Sang-Hyun;Kim, Eon-Chung
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.550-552
    • /
    • 1995
  • Real time informations from industrial power system in operation can be used for efficient energy conservation, optimal operation of electrical equipments, and expansion planning of apparatus. Requirements for energy conservation and supplied power quality in customers are increasing significantly because of their effects on the production cost and efficiency. Thus, the development of low cost power management system which can can operate in domestic power system properly is substantially requested. In this research, operation software for real time monitoring and control system in customer power system has been developed to achieve the above purposes. The development of the operating software and related technologies are expected to be applied successfully for reducing electricity cost, enhancing power quality, determining facility expansion planning, operating optimal power system, increasing production efficiency, and reducing maintenance cost.

  • PDF

Path Planning for Manipulators Using Fourier Series (퓨리에 급수를 이용한 매니퓰레이터 경로 계획)

  • 원종화;최병욱;정명진
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.29B no.10
    • /
    • pp.27-36
    • /
    • 1992
  • This paper proposes a numerical method of motion planning for manipulators using Foruier series. For a redundant manipulator, we predetermine the trajectories of redundant joints in terms of the Nth partial sum of the fourier series. then the optimal coefficients of the fourier series are searched by the Powell's method. For a nonredundant or redundant manipulator, CS02T-continuous smooth joint trajectory for a point-to-point task can be obtained while considering the frequency response. We apply the proposed method to the 3-link planar manipulator and the PUMA 560 manipulator. To show the validity of the proposed method, we analyze solutions by the Fast Fourier Transform (FFT). Also, several features are discussed to obtain an optimal solution.

  • PDF

A Discrete Optimal Control Model for Capacity Expansion Planning of FMS (유연생산(柔軟生産) 시스템(FMS : Flexible Manufacturing Systems)의 용량확충을 위한 이산적 최적 제어 모델)

  • Park, Tae-Hyeong;Kim, Seung-Gwon;Kim, Seong-In;Gang, Seok-Hyeon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.14 no.2
    • /
    • pp.131-141
    • /
    • 1988
  • As flexible manufacturing technology has become available across a broad range of applications, an increasingly large number of firms have confronted decisions about when to adopt the FMS technology and the size of FMS at that time. For small to medium size firms that should invest under budget limitation and high investment risk, proper size of FMS adoption at proper time is very important. In this paper the discrete optimal control theory has been used to make decisions about the size and timing of FMS capacity expansion over a planning period. Sensitivity analysis is presented for analysing the behavior of the model to variations of model parameters.

  • PDF