• Title/Summary/Keyword: operation standard

Search Result 2,591, Processing Time 0.032 seconds

Standard Operation Time Estimation Using Features in Mold Die Manufacturing (특징형상을 사용한 사출금형 표준 가공공수계산)

  • 이충수;노형민
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.1
    • /
    • pp.223-231
    • /
    • 1994
  • When manufacturing mold dies, an operation sheet is required for each part of the mold dies. The consistent estimation of standard operation time in the operation sheet is difficult, because the estimation is mainly based on subjective judgement. In order to resolve it, concept of feature is introduced in this study. For CAD/CAPP integration, feature technology is being implemented to represent geometrical and technological information of part drawings. A feature database has already been designed, and then used to generate data for process and operation planning modules. Related to this former research, standard operation time is calculated using the feature information and tables used in a real factory.

A study on Standard Safety Operation Evaluation Method for Improving Safety Activity (안전활동 개선을 위한 표준 안전작업 평가기법 설계)

  • Yang, Kwang-Mo;Yang, Hyun-Hoo;Kang, Yun-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.4
    • /
    • pp.39-47
    • /
    • 2007
  • An industrial injury prevention has a basis on fundamental spirit of human respect rather than only injury prevention in company. The employer should recognize employee as a core part of an industrial management and use as a starting point of safety and health management rather than means of production. There are many reason for unsafety action without safety operation. The reason is no standard safety operation in company or the workers never get a enough education. Standard safety operation is prepared by paper for accurate directions and orders and operators must read the paper to prevent an error of action. Also an essential particular is safety of equipment and machine must be assumed to establish standard safety operation then safety of operations will be possible.

A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting (터널발파시 실제 작업시간과 품셈의 비교 분석)

  • Kim, Yang-Kyun;Kim, Hyung-Mok
    • Explosives and Blasting
    • /
    • v.33 no.3
    • /
    • pp.14-20
    • /
    • 2015
  • Tunnel blasting that plays the most important role in the construction of a drill & blast tunnel, shows a big difference in operation time according to various factors such as rock mass quality, tunnel dimension, machine performance, and the skill level of tunnel crews. This paper analyzes the differences between the time calculated by the standard of estimate and actual operation time based upon field investigations on blasting operation time in three tunnels of Korea. The result shows that actual blasting time is generally about 8%~16% less than the standard of estimate in cases that normal operations are performed. If the time delayed by unforeseen situations is included, however, it is presumed that the number of cases that actual operation time exceeds the standard of estimate are considerable. This study aims to help make a judgement over the appropriacy of the standard of estimate through continuous investigations on actual operation time, as well as improve the productivity of tunnel excavation.

Development of Standard Operation System of Emergency Restoration for Railway Accidents (철도사고유형별 임시복구 표준운영체계(안) 개발)

  • Park, Yong-Gul;Sung, Deok-Yong;Choi, Sung-Yong;Suh, Sang-Kyo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.819-828
    • /
    • 2009
  • This paper suggests to standardize railway accident restoration types as the code and standard operation system for efficient railway accident management. First of all, the damage types of have been carefully analyzed and reclassified. This study suggested the combination of 3 distinct code factors: restoration class, restoration object, and restoration location to standardize them. In addition, this study suggested procedures to make the standard operation system of emergency restoration, defined the worst case of emergency restoration and the important events. Therefore, the standard operation system of emergency restoration is developed. It shall play a major role as the database system for railway accident management, minimum of damage and rapid control of accident.

A Study on Calculation of Recycling Standard Cost for Efficient Operation of EPR (효율적인 EPR 운영을 위한 재활용 기준비용 산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.121-126
    • /
    • 2011
  • The provisions regarding the standard cost for recycling stated under the Extended Producer Responsibility (EPR) since 2002, include different and complicated obligatory steps to be taken on a variety of subject items regarding the collection, the transportation and the treatment, making the corporations face in their calculating and executing the standard cost. This study presents more objective calculation scope and standard for the purpose of efficient operation of the standard cost for recycling, in consideration of the general industry perception toward cost issue as well as domestic/overseas case studies regarding the standard cost for recycling. Besides, the study presents the checking items and the calculation contents per step to calculate the standard cost for recycling. Therefore, it is expected not only to be used as the objective standard to calculate the standard cost for recycling, but also to contribute to increasing the work efficiency in the following ongoing re-calculation process and to maintaining the consistent operation of the institution.

A Study on Priority Factor Analysis of Standard Method for Risk Measurement (위험성 측정을 위한 표준안전작업 중점사항 분석에 관한 연구)

  • Yang, Kwang-Mo;Kim, Min-Jun;Cho, Jung-Hyun;Park, Jae-Hyun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.04a
    • /
    • pp.27-33
    • /
    • 2007
  • There are many reason for unsafety action without safety operation. The reason is no standard safety operation in company or the workers never get a enough education. Standard safety operation is prepared by paper for accurate directions and orders and operators must read the paper to prevent an error of action. Also an essential particular is safety of equipment and machine must be assumed to establish standard safety operation then safety of operations will be possible.

  • PDF

Improvement of Drought Operation Criteria in Agricultural Reservoirs (농업용 저수지 이수관리를 위한 저수율 가뭄단계기준 개선)

  • Mun, Young-Sik;Nam, Won-Ho;Woo, Seung-Beom;Lee, Hee-Jin;Yang, Mi-Hye;Lee, Jong-Seo;Ha, Tae-Hyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.4
    • /
    • pp.11-20
    • /
    • 2022
  • Currently, the operation rule of agricultural reservoirs in case of drought events follows the drought forecast warning standard of agricultural water supply. However, it is difficult to preemptively manage drought in individual reservoirs because drought forecasting standards are set according to average reservoir storage ratio such as 70%, 60%, 50%, and 40%. The equal standards based on average water level across the country could not reflect the actual drought situation in the region. In this study, we proposed the improvement of drought operation rule for agricultural reservoirs based on the percentile approach using past water level of each reservoir. The percentile approach is applied to monitor drought conditions and determine drought criteria in the U.S. Drought Monitoring (USDM). We applied the drought operation rule to reservoir storage rate in extreme 2017 spring drought year, the one of the most climatologically driest spring seasons over the 1961-2021 period of record. We counted frequency of each drought criteria which are existing and developed operation rules to compare drought operation rule determining the actual drought conditions during 2016-2017. As a result of comparing the current standard and the percentile standard with SPI6, the percentile standard showed severe-level when SPI6 showed severe drought condition, but the current standard fell short of the results. Results can be used to improve the drought operation criteria of drought events that better reflects the actual drought conditions in agricultural reservoirs.

Best Measurement Capability and Standard Test Facility for the Water-level Gauges (수위계 표준시험장치 개발 및 최고측정능력에 관한 연구)

  • Shin, Gang-Wook;Hong, Sung-Taek
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.10
    • /
    • pp.1012-1017
    • /
    • 2007
  • Rain data and water-level data are importantly used for dam operation at flood period. Because dams are directly controlled by the water-level data, the characteristic of the water-level gauges is necessary to be managed. Thus, we developed the standard test facility and method for testing the water-level gauges which are a float type, a supersonic type and a radar type. And we calculated the uncertainty of the standard test facility to maintain the accuracy of water-level gauges. Through development of this facility, we could obtain the characteristics and the calibration factor of the water-level gauges. And, this study showed that the standard test facility can be widely used for dam operation and basin management.

A Process Planning System for Machining of Dies for Auto-Body Production-Operation Planning and NC Code Post-Processing

  • Dongmok Sheen;Lee, Chang-Ho;Noh, Sang-Do;Lee, Kiwoo
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.2 no.3
    • /
    • pp.69-78
    • /
    • 2001
  • This paper presents a process and operation planning system and an NC code post-processor for effective machining of press dies for production of cars. Based on the machining feature, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor adjusts feedrates along the tool path to reduce machining time while maintaining the quality. The adjustment rule is selected based on the machining load estimated by virtual machining.

  • PDF

A design of Floating Point Arithmetic Unit for Geometry Operation of Mobile 3D Graphic Processor (모바일 3D 그래픽 프로세서의 지오메트리 연산을 위한 부동 소수점 연산기 구현)

  • Lee, Jee-Myong;Lee, Chan-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.711-714
    • /
    • 2005
  • We propose floating point arithmetic units for geometry operation of mobile 3D graphic processor. The proposed arithmetic units conform to the single precision format of IEEE standard 754-1985 that is a standard of floating point arithmetic. The rounding algorithm applies the nearest toward zero form. The proposed adder/subtraction unit and multiplier have one clock cycle latency, and the inversion unit has three clock cycle latency. We estimate the required numbers of arithmetic operation for Viewing transformation. The first stage of geometry operation is composed with translation, rotation and scaling operation. The translation operation requires three addition and the rotation operation needs three addition and six multiplication. The scaling operation requires three multiplication. The viewing transformation is performed in 15 clock cycles. If the adder and the multiplier have their own in/out ports, the viewing transformation can be done in 9 clock cycles. The error margin of proposed arithmetic units is smaller than $10^{-5}$ that is the request in the OpenGL standard. The proposed arithmetic units carry out operations in 100MHz clock frequency.

  • PDF