• Title/Summary/Keyword: on-site implementation

Search Result 495, Processing Time 0.024 seconds

Development of Construction Site Access Management Automation System based on Hand Vascular Pattern

  • Gu Taek Kim;Ji Woong Yeom;Kyong Hoon Kim;Choong Hee Han;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.499-505
    • /
    • 2009
  • Along with the changing pattern that the construction project is getting complicated, large-scaled and up-to-dated, necessity of efficient management of manpower and resources of the construction site is being increased. In particular, considering that the construction site requires a lot of labor force and in terms of the construction cost, labor cost shares 30-40%, labor management has become a very important factor. In this study, in order to support a stable and successful construction project implementation and supplement the existing system being utilized at the current site, construction site access management automation system based on hand vascular pattern, a biometrics system, is intended to be developed. Relevant theory for the system development and the problem of existing RFID system were evaluated and based on this findings, a system design and DB composition chart were envisaged. In addition, by applying this developed system to a number of sites, its result was analyzed

  • PDF

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

Application of Parameters-Free Adaptive Clonal Selection in Optimization of Construction Site Utilization Planning

  • Wang, Xi;Deshpande, Abhijeet S.;Dadi, Gabriel B.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.1-10
    • /
    • 2017
  • The Clonal Selection Algorithm (CSA) is an algorithm inspired by the human immune system mechanism. In CSA, several parameters needs to be optimized by large amount of sensitivity analysis for the optimal results. They limit the accuracy of the results due to the uncertainty and subjectivity. Adaptive Clonal Selection (ACS), a modified version of CSA, is developed as an algorithm without controls by pre-defined parameters in terms of selection process and mutation strength. In this paper, we discuss the ACS in detail and present its implementation in construction site utilization planning (CSUP). When applied to a developed model published in research literature, it proves that the ACS are capable of searching the optimal layout of temporary facilities on construction site based on the result of objective function, especially when the parameterization process is considered. Although the ACS still needs some improvements, obtaining a promising result when working on a same case study computed by Genetic Algorithm and Electimze algorithm prove its potential in solving more complex construction optimization problems in the future.

Homepage Integration Strategy and Implementation of Public Institutions (기관의 홈페이지 통합 관리 방안 설계 및 시스템 구현)

  • Hwang In-A;Yang Maeng-Ho;Go Yeong-Cheol;Lee Hae-Cho
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2005.10a
    • /
    • pp.675-688
    • /
    • 2005
  • It is essential for any public institution to establish a systematical scheme and a management system to maintain the contents and securities of its ever-expandingweb-site with efficiency. The general users want a reliable system and a simple and stress-free web environment, and expect the public institutions to maintain the accuracy and conformity of information they provide to the public. In かis study, 1 examined a web-site owned by a certain governmental research institute for the current maintenance status and problems to seek an effective and easy-to-use scheme for both users and web managers. Based on what I teamed from my study, 1 moved on to design a web integration system and tested it on the above mentioned web-site for analysis.

  • PDF

On-Site vs. Laboratorial Implementation of Camera Self-Calibration for UAV Photogrammetry

  • Han, Soohee;Park, Jinhwan;Lee, Wonhee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.34 no.4
    • /
    • pp.349-356
    • /
    • 2016
  • This study investigates two camera self-calibration approaches, on-site self-calibration and laboratorial self-calibration, both of which are based on self-calibration theory and implemented by using a commercial photogrammetric solution, Agisoft PhotoScan. On-site self-calibration implements camera self-calibration and aerial triangulation by using the same aerial photos. Laboratorial self-calibration implements camera self-calibration by using photos captured onto a patterned target displayed on a digital panel, then conducts aerial triangulation by using the aerial photos. Aerial photos are captured by an unmanned aerial vehicle, and target photos are captured onto a 27in LCD monitor and a 47in LCD TV in two experiments. Calibration parameters are estimated by the two approaches and errors of aerial triangulation are analyzed. Results reveal that on-site self-calibration excels laboratorial self-calibration in terms of vertical accuracy. By contrast, laboratorial self-calibration obtains better horizontal accuracy if photos are captured at a greater distance from the target by using a larger display panel.

A Study on Effective Web Site Implementation using Reliability Measurement (신뢰도 측정을 통한 효과적인 웹 사이트 구축 방안에 관한 연구)

  • Kwon, Young-Gik;Cui, Jun;Kwon, Dong-Hoon
    • Journal of Korea Multimedia Society
    • /
    • v.14 no.6
    • /
    • pp.802-812
    • /
    • 2011
  • In this paper, we derived 7 reliability measurement factors for effective web site construction through literature research and empirically measured reliability of the web site using "Xenu" and "Yslow" which are reliability measurement tools. We selected and tested total 12 domestic and foreign web sites. As a result of measuring those 12 web sites, the reliability level was varied in a number of aspects according to 7 measurement factors, and we suggested alternatives based on those 7 factors in order to build the effective web site.

A Comparative Study of the Perceptions by Stakeholder on the Problems and Difficulties at Implementation Stages of the Agricultural Environment Conservation Program (농업환경보전프로그램 이행단계별 문제점 및 애로사항에 대한 이해당사자별 인식 비교)

  • Kim, Soo-Jin;Bae, Seung-Jong;Yoo, Seung-Hwan;Na, Ra;Son, Jeong-Woo;Hur, Seung-Oh
    • Journal of Korean Society of Rural Planning
    • /
    • v.29 no.4
    • /
    • pp.201-210
    • /
    • 2023
  • The Agricultural Environmental Conservation Program is a useful system for creating sustainable agriculture and environmentally friendly and comfortable rural areas. However, there are still many problems and difficulties, such as the establishment of necessary activities and plans by the residents themselves, and improvements are required. The degree of importance and difficulties according to the implementation stage of each stakeholder was quantified and compared with each other, and the specific difficulties recognized by on-site support organizations were structurally analyzed. It was analyzed that the importance and difficulties of the project implementation stage for local government officials and the project implementation planning stage for on-site support organizations were very high, indicating that they perceived the most need for improvement. On the other hand, 21 specific problems and difficulties were derived based on the results of the literature survey and stakeholder interviews. As a result of the structural analysis using the DEMATEL method, the most influential factor was the low understanding of the project by residents, the most influential factor was the lack of collecting and reflecting residents' opinions, the most central factor was the lack of collecting and reflecting residents' opinions, and the most causal factor was the lack of education and promotion of the project. The results indicate that a more stable system can be established if continuous promotion and education, periodic meetings and discussions, active reflection of residents' opinions in project implementation plans, and simplification of implementation inspection and project cost execution through the implementation inspection platform are promoted. Despite the limitations, considering that no institutional analysis of agricultural environmental conservation programs has been conducted so far, the results of this study are expected to serve as a basis for the establishment of relevant policies in the future.

A Study on Software Dev. Project Management System Acquisition and Implementing on project site (SW개발 프로젝트 관리시스템 도입 및 적용사례에 대한 연구)

  • Jeon, Hyeong-Kweon;Park, Koo-Rack;Jung, Jin-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.5
    • /
    • pp.91-98
    • /
    • 2015
  • In this paper, we introduce PMS's main function and main effect which implemented medium and large scale software development project site, and we propose importance and improvement nacessity of PMS implementation. PMS's main functions are developed based on best practices which CMMI model and PMBOK. Also, each PMS has specialized unique function according to it's target industry area or related I.T solutions which has infra dependency. The effectiveness of PMS implementation on project site is seperated two types, one is qualitative effect, the other quantitative effect. Representative qualitative effects are improvement of enterprise's image and competency. Also representative quantitative effect is reduction of project management cost as a financial effect. As far as project size is increase, PMS's needs and necessariness will be increase, so we need to improve PMS;s function according to project management's global trend and software customer's requisition.

Design And Implementation Of A Lecture Supporting Web Site Construction System Using Remote Execution Techniques (원격실행 기술을 이용한 강의지원 웹사이트 자동생성시스템 설계 및 구현)

  • Im, In-Taek;Kim, Jae-Il;Song, Gyu-Baek;Kim, Jong-Geun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.6
    • /
    • pp.1911-1922
    • /
    • 2000
  • Recently, various web page development tools for both the beginner and the experienced user are introduced. These tools allow them to generate web pages easily and quickly. However the web pages generated by the tools have lots of functional limitations. Generally authors must have much knowledge for web authoring tools, HTML, CGI programming to open web sites for special purpose. Especially, most of the lecture supporting web site necessarily requires much effort to construct it as well as special functions using CGI, Javascript, Java Applet, etc. to generate dynamic web pages. In order to solve above mentioned limitations, we design and implement an automatic web site construction system using RASIS based on remote execution technologies.

  • PDF