• Title/Summary/Keyword: non-working days

Search Result 65, Processing Time 0.028 seconds

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea (국내 건설공사의 기후조건에 의한 작업불능일 예측방법 개선)

  • Lee, Keun-Hyo;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.100-108
    • /
    • 2006
  • Non-working days affected by weather conditions of the construction-sites have been estimated without proper data. They are usually estimated based on project engineer's own experience and intuition. As a result, they cause not only economic loss to time-adjustment but also conflicts among project participants. It becomes more difficult to predict the weather nowadays than before due to tendency of recently weather change. Therefore, this paper presents an improved estimation method for non-working days, which could minimize estimation errors. The estimation method is developed based on analysis of regional characteristics and weather conditions which affect project duration.

Calculation of Non-Working Days due to Weather Factors during Structural Steel Works (기후요소에 의한 철골공사 작업불가능일 산정에 관한 연구)

  • Lee, Duk-Hyung;You, Jung-Sik;You, Jae-Kil;Jung, Jae-Hun;Jung, Hee-Kyung;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.137-145
    • /
    • 2006
  • Calculating non-working days is very important element for the accurate estimation of construction time. And non-working days are largely affected by weather factors such as rainfall, wind velocity, snowfall and temperature. In the case of concrete works, there are lots of referable information for the calculation of non-working days due to the weather factors. However, for the structural steel works, there are very limited information only. Through literature survey and interviews with a few engineers, this paper established the weather factors that affect steel structural works and the impact of those factors. Based on the factors and the expected impact of the factors together with the weather data during the last 15 years in Seoul region gathered from Korea Meteorological Administration, this paper suggests the monthly non-working day of structural steel work due to weather factors. This information can be used for the early estimation of construction time.

A Study on the Effective Decision-Making Support Model for Construction Duration by the Hypothetical Weather Simulation (가상기후 시뮬레이션에 의한 공기산정 의사결정 지원모델에 관한 연구)

  • Jeong Suk-Nam;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.74-81
    • /
    • 2000
  • The duration of construction in the construction works contains non-working days as well as working days. The duration is so relevant to climate that it should be calculated after fully considered about the regional climate in which construction processes. In most construction fields, however, there has been a frequent adjustment of duration because the field supervisor's experiences have decided non-working days indiscriminately without any accurate information about weather. Not only has that done great economic damages, but also caused many problems in interests among construction subject. So, in this study, we will analyse the elements of climate which has influences on the duration and implement the hypothetical weather simulation. By connecting the results of simulation with the duration of construction, we will propose the decision-making support model for the efficient calculation of duration when the field supervisor makes the projects schedule.

  • PDF

Development of Sliding Roof System for High-rise Construction Factory Using Quality Function Deployment (품질기능전개를 이용한 고층건물 건설공장 구조체의 개폐식 지붕 시스템 개발)

  • Kim, Chang-Won;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.131-132
    • /
    • 2011
  • Non-working days owing to climatic factors have been negatively affected in productivity of construction, such as delays of project completion times, decrease productivity of construction. Especially non-working days of steel erection work is about 58 days, it is influenced deleteriously to estimating uncertain construction duration. To solve this problem, Construction Factory(CF) and sliding roof system installed CF's upper side are developed in korea recently. This study is proposed the design of sliding roof system through assess relation of requirements and technical characteristics using Quality Function Deployment(QFD). The basis data for applying QFD is collected from literature reviews and questionnaires/interviews targeting system developer, experts and researchers.

  • PDF

Impact of Working Capital Management on Firm's Profitability: Empirical Evidence from Vietnam

  • NGUYEN, Anh Huu;PHAM, Huong Thanh;NGUYEN, Hang Thu
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.3
    • /
    • pp.115-125
    • /
    • 2020
  • This paper investigates the impact of working capital management on the firm's profitability. The research sample includes 119 non-financial listed companies on Vietnam stock market over a period of 9 years from 2010 to 2018. Two statistical approaches include Ordinary least squares (OLS) and fixed effects model (FEM) are employed to address econometric issues and to improve the accuracy of the regression coefficients. The empirical results show the negative and significant impacts of the working capital management, which measured by cash conversion cycle (CCC) and three components of the CCC including accounts receivable turnover in days (ARD), inventory turnover in days (INVD), and accounts payable turnover in days (APD) on the firm's profitability measured by return on assets (ROA) and Tobin's Q. It implies that firms can increase profitability by keeping the optimization of the working capital management measured by the CCC, which includes shortening the time to collect money from clients, accelerating inventory flow and hold the low payment time to creditors. Besides, the profitability of firms was impacted by the sale growth rate, firm size, leverage, and age. Therefore, this paper provides a new insight to managers on how to improve the firm's profitability with working capital management.

A Study on the Design of Non-working Days Process by Analyzing Business Information (업무정보 분석을 통한 작업불능일 산정 프로세스 설계에 관한 연구)

  • Kim, Beop-su;Bang, Hong-soon;Choi, Byung-Ju;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.61-69
    • /
    • 2018
  • Construction projects consist of long-term on-site production, and most disciplines are featured by outdoor works. Therefore, when a process plan is established, non-working days are calculated and reflected in a process schedule to comply with the planned construction period. However, necessary information and working methods are different in the course of the work, so the method of calculation varies depending on persons even for the same site, and the result is also very different. Therefore, scientific and quantitative understanding of business information is needed. This study reconstructed non-working day estimation process by collecting and organizing the information necessary for non-working day estimation, and designed the demonstration screen based on the reconstructed process and verified through expert interview at each stage. As a result, it showed about 69% reduction of work time and reliability of 92% work information matrix, and 80% of the experts evaluated the systemization of the relevant work. This study is expected to improve the understanding of work and increase the efficiency of work performance, and the study on systemization in the future should be continued.

Vibration of rotating machinery due to proximity (Proximity에서 유도된 회전기계의 이상 진동)

  • 구재량;황재현;김두영;윤완노;김연환
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.532-535
    • /
    • 2003
  • Vibration of rotating machinery is a factor that is something to do with abnormal machinery. Former days, Perception of vibration at rotating machinery had used Shaft rider type. Shaft rider type was adhered to surface of shaft and detected vibration of rotating machinery. Recently, Perception of vibration at rotating machinery uses to non-contact sensor. Working principle of non-contact sensor is used of eddy current. Vibration at rotating machinery appears to deviation of eddy current. In this paper, We investigate abnormal vibration due to non-contact sensor.

  • PDF

A Study of the Non-market Effects of Five-day Workweek (주5일 근무제도 실시의 노동시장 외적 효과)

  • Park, Cheolsung
    • Journal of Labour Economics
    • /
    • v.37 no.4
    • /
    • pp.59-88
    • /
    • 2014
  • I estimate the non-market effects of implementing five-day workweek controlling for the individual-job fixed effect. I find that the implementation of five-day workweek has improved an individual's subjective health status, increased the frequency of exercises, increased the probability to get education or training other than job training, improved subjective quality of life, increased spending for leisure and cultural activities, and improved an individual's satisfaction with the job and the employer. Much of the effects are due to reduction not of working hours but of working days.

  • PDF

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.