Browse > Article
http://dx.doi.org/10.6106/KJCEM.2018.19.5.061

A Study on the Design of Non-working Days Process by Analyzing Business Information  

Kim, Beop-su (Department of Architectural Engineering, Chungbuk University)
Bang, Hong-soon (Department of Architectural Engineering, Chungbuk University)
Choi, Byung-Ju (Department of Architectural Engineering, Chungbuk University)
Kim, Ok-kyue (Department of Architectural Engineering, Chungbuk University)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.5, 2018 , pp. 61-69 More about this Journal
Abstract
Construction projects consist of long-term on-site production, and most disciplines are featured by outdoor works. Therefore, when a process plan is established, non-working days are calculated and reflected in a process schedule to comply with the planned construction period. However, necessary information and working methods are different in the course of the work, so the method of calculation varies depending on persons even for the same site, and the result is also very different. Therefore, scientific and quantitative understanding of business information is needed. This study reconstructed non-working day estimation process by collecting and organizing the information necessary for non-working day estimation, and designed the demonstration screen based on the reconstructed process and verified through expert interview at each stage. As a result, it showed about 69% reduction of work time and reliability of 92% work information matrix, and 80% of the experts evaluated the systemization of the relevant work. This study is expected to improve the understanding of work and increase the efficiency of work performance, and the study on systemization in the future should be continued.
Keywords
Non-Working Days Process Reengineering; Business Information;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ko, K. J. (2015). "A Study on the Trend of Unaccountable Days in Regional Areas with the Change of Climate." Incehon University A master's thesis.
2 Kim, B. S. (2012). "TACT Process Reengineering for Improving the Usability in Construction Sites." Chungbuk University A master's thesis.
3 Kim, S. H. (2015). "Non-working Day Estimation in High-Rise Building Construction with Wind Load by Radiosonde and Weibull Distribution." SungKyunKwan University A master's thesis.
4 Lee, K. H. (2005). "Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects." Ajou University A master's thesis.
5 Lee, Y. Y., and Woo, S. K. (2014). "Improvement of the Estimation Method of Criteria of Non-working Days Due to Weather Conditions." Annual Report of the Korea Institute of Construction Management, pp. 275-276.
6 Park, I. B. (2009). "A Study on the Estimation o fNon-working Days Due to Climate Condition." ChungJu University A master's thesis.