• Title/Summary/Keyword: multi project

Search Result 768, Processing Time 0.024 seconds

Application of Model-Based Systems Engineering to Large-Scale Multi-Disciplinary Systems Development (모델기반 시스템공학을 응용한 대형복합기술 시스템 개발)

  • Park, Joong-Yong;Park, Young-Won
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.8
    • /
    • pp.689-696
    • /
    • 2001
  • Large-scale Multi-disciplinary Systems(LMS) such as transportation, aerospace, defense etc. are complex systems in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating design status effectively among all of the stakeholders. The processes and methods of systems engineering which includes system requirement analysis; functional analysis; architecting; system analysis; interface control; and system specification development provide a success-oriented disciplined approach to the project. This paper shows not only the methodology and the results of model-based systems engineering to Automated Guided Transit(AGT) system as one of LMS systems, but also propose the extension of the model-based tool to help manage a project by linking WBS (Work Breakdown Structure), work organization, and PBS (Product Breakdown Structure). In performing the model-based functional analysis, the focus was on the operation concept of an example rail system at the top-level and the propulsion/braking function, a key function of the modern automated rail system. The model-based behavior analysis approach that applies a discrete-event simulation method facilitates the system functional definition and the test and verification activities. The first application of computer-aided tool, RDD-100, in the railway industry demonstrates the capability to model product design knowledge and decisions concerning key issues such as the rationale for architecting the top-level system. The model-based product design knowledge will be essential in integrating the follow-on life-cycle phase activities. production through operation and support, over the life of the AGT system. Additionally, when a new generation train system is required, the reuse of the model-based database can increase the system design productivity and effectiveness significantly.

  • PDF

Calculation of the Peak-delay Force Reduction Parameter of Multi-Directional Random Waves Acting on a Long Caisson Breakwater (장대 케이슨 방파제에 작용하는 다방향 불규칙파랑의 파력감소계수 산정)

  • Jung, Jae-Sang;Kim, Bum-Hyung;Kim, Hyung-Jun;Cho, Yong-Sik
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.10
    • /
    • pp.843-850
    • /
    • 2010
  • By employing multi-directional random waves, a parameter controlling the force acting on a long caisson breakwater is investigated in detail. Both JONSWAP (Joint North Sea Wave Project) and asymmetric directional spectra are adopted for frequency and directional spectra. It is found that the parameter decreases as the length of caisson and the angle of main direction of incident waves increase. Furthermore, the parameter is much similar to that of regular waves as the maximum spreading parameter $s_{max}$ increases. The parameter, however, decreases as asymmetry parameter ${\mu}$ increases when the main direction of incident waves is oblique to the breakwater.

Design of a Multi-Band Low Noise Amplifier for 3GPP LTE Applications in 90nm CMOS (3GPP LTE를 위한 다중대역 90nm CMOS 저잡음 증폭기의 설계)

  • Lee, Seong-Ku;Shin, Hyun-Chol
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.5
    • /
    • pp.100-105
    • /
    • 2010
  • A multi-band low noise amplifier (LNA) is designed in 90 nm RF CMOS process for 3GPP LTE (3rd Generation Partner Project Long Term Evolution) applications. The designed multi-band LNA covers the eight frequency bands between 1.85 and 2.8 GHz. A tunable input matching circuit is realized by adopting a switched capacitor array at the LNA input stage for providing optimum performances across the wide operating band. Current steering technique is adopted for the gain control in three steps. The performances of the LNA are verified through post-layout simulations (PLS). The LNA consumes 17 mA at 1.2 V supply voltage. It shows a power gain of 26 at the normal gain mode, and provides much lower gains of 0 and -6.7 in the bypass-I and -II modes, respectively. It achieves a noise figure of 1.78 dB and a IIP3 of -12.8 dBm over the entire band.

A Simple Multi-rate Parallel Interference Canceller for the IMT-2000 3GPP System (IMT-2000 3GPP 시스템을 위한 간단한 다중 전송률 병렬형 간섭제거기)

  • Kim, Jin-Kyeom;Oh, Seong-Keun;Sunwoo, Myung-Hoon
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.38 no.12
    • /
    • pp.10-19
    • /
    • 2001
  • In this paper, we propose an effective but simple multi-rate parallel interference canceller(PIC) for the international mobile telecommunications-2000(IMT-2000) 3rd generation partnership project (3GPP) system. For effective multi-rate processing, we define the basic block as one symbol period of the dedicated physical control channel(DPCCH) having the lowest data rate and common to all users. Then, decision and interference cancellation are performed at every basic block. For an asynchronous channel, we propose an advance removal scheme that removes in advance multiple access interference(MAI) due to the next blockof other users with shorter delay. Introducing a pipeline structure at a sample base, we can implement efficiently the PIC using the advance removal scheme with a minimum hardware and no extra computations. Through computer simulations, we analyze the bit error rate(BER) performance of the proposed PIC with respect to signal-to-noise ratio(SNR) and the number of users.

  • PDF

A Landscape Planning of Multi-purpose Dam in Hwabuk (화북 다목적댐 조경계획)

  • Ahn Gye-Dong;Kim Yong-Geun;Min Kwon-Sik;Kang Hyun-Kyung;Kwon Jeon-O;Shin Ji-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.1 s.114
    • /
    • pp.107-119
    • /
    • 2006
  • The Korea Water Resources Corporation(KOWACO) proposed bidding for an alternative design for Hwabuk Multi-purpose Dam in March of 2004. The site is located in Hakseong-ri, Goro-myeon, Gunwi-gun, Gyeongsangbuk-do and has adrainage area of $87.52km^2$. The purpose of this project is to establish an environmentally friendly plan for minimizing the damage that was caused by the construction of the Hwabuk Multi-purpose Dam. The design principle of KOWACO was the restoration of the natural environment, a harmonious landscape, and the creation of a space of regional and local culture. The basic concept of this project involves an ecological-restoration axis and a functional-connection axis. The site is divided into four spaces: (1) the space of memory and symbol, (2) the space of nature and ecology, (3) the space of regional and local culture, and (4) the space of the regional economy. There are four sub-spaces in the space of memory and symbol: the track forest, the time forest, the memory room, and the sun plaza. There are three sub-spaces in the space of nature and ecology: the habitat of aquatic birds, the wind forest, and the eco-corridor. There are five themed parks in the space of regional and local culture: the culture and relic room, the wildflower garden, the ecological pond, the insect observation park, and the pyogo maze. There are three areas in the space of the regional economy: the forest pension, the waterside pension, and the community center, as Dungdungi village was reorganized to serve as a lodging complex. These themed parks, working together, can offer an effective space for nature, culture, rest, and experience.

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

Projecting the spatial-temporal trends of extreme climatology in South Korea based on optimal multi-model ensemble members

  • Mirza Junaid Ahmad;Kyung-sook Choi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.314-314
    • /
    • 2023
  • Extreme climate events can have a large impact on human life by hampering social, environmental, and economic development. Global circulation models (GCMs) are the widely used numerical models to understand the anticipated future climate change. However, different GCMs can project different future climates due to structural differences, varying initial boundary conditions and assumptions about the physical phenomena. The multi-model ensemble (MME) approach can improve the uncertainties associated with the different GCM outcomes. In this study, a comprehensive rating metric was used to select the best-performing GCMs out of 11 CMIP5 and 13 CMIP6 GCMs, according to their skills in terms of four temporal and five spatial performance indices, in replicating the 21 extreme climate indices during the baseline (1975-2017) in South Korea. The MME data were derived by averaging the simulations from all selected GCMs and three top-ranked GCMs. The random forest (RF) algorithm was also used to derive the MME data from the three top-ranked GCMs. The RF-derived MME data of the three top-ranked GCMs showed the highest performance in simulating the baseline extreme climate which was subsequently used to project the future extreme climate indices under both the representative concentration pathway (RCP) and the socioeconomic concentration pathway scenarios (SSP). The extreme cold and warming indices had declining and increasing trends, respectively, and most extreme precipitation indices had increasing trends over the period 2031-2100. Compared to all scenarios, RCP8.5 showed drastic changes in future extreme climate indices. The coasts in the east, south and west had stronger warming than the rest of the country, while mountain areas in the north experienced more extreme cold. While extreme cold climatology gradually declined from north to south, extreme warming climatology continuously grew from coastal to inland and northern mountainous regions. The results showed that the socially, environmentally and agriculturally important regions of South Korea were at increased risk of facing the detrimental impacts of extreme climatology.

  • PDF

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

A Study on a development plan for multi-transportation in Incheon: Focused on Incheon and main cities in Northern China (인천지역의 복합운송체계별 발전방안 연구 - 인천과 상해이북지역 중심으로 -)

  • Chung, Tae-Won
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.1
    • /
    • pp.259-276
    • /
    • 2010
  • This study shows how Incheon will advance into roadmap as multi-transport hub in Northeast Asia hereafter and be proposed an urgent tasks and roles to construct a multi-transportation system for Incheon, which has both an international airport and port. The multi-transportation point of view of inter-major cities competitiveness of total scores was proposed 1. Shanghai(64.8 points), 2 in Hongkong(64.5), 3 in Incheon(62.9), and 4 in Busan(60.4) and Incheon was estimated to have enough competitiveness to be the international multi-transport hub in Northeast Asia. Sea & Air transportation revealed the most important multi-transportation in the Incheon region. In conclusion, this research suggests a development plan for multi-transportation in Incheon. Firstly, it proposes construction of sea & air transportation distribution center and agreement that simplifies logistic process between Incheon and Tianjin, secondly, suggests to activate project for the purpose of creating a better sea-land transportation system between Incheon and Shanghai.

A Comparative Study between Korea and the United States on Executive and Supportive Programs for the Multifamily Housing Remodeling (공동주택 리모델링 시행 프로그램에 관한 한.미간 비교연구 - 미국 리모델링 관련 제도와 전문가 대상 면접조사 결과를 중심으로 -)

  • Yoon, Chung-Sook;Seidel, Andrew D.;Abrams, Robin F.;Kim, Suk-Kyung
    • Journal of the Korean housing association
    • /
    • v.18 no.6
    • /
    • pp.45-55
    • /
    • 2007
  • The study is based on a two-year research study titled 'A study on the Development of the Programs for Housing Policy to support Multi-family Housing Remodeling in Korea'. The primary purpose of this two-year study was to recommend governmental program initiatives for supporting multi-family housing remodeling activities in Korea. As a part of this research study, this article was written based on the results from the two surveys regarding multi-family housing remodeling in the United States and Korea, and a focus group with housing researchers affiliated to the Joint Center for Housing Studies. Major research findings are presented as follows: First, there have been various types of supportive programs for single- and multi-family housing remodeling in the United States. Those have focused on lower income families than middle income families. Compared with the programs in the United States, the apartment remodeling in Korea has been focusing on small population of the multi-family housing owners. Apartment remodeling in Korea needs supportive programs for rental housing remodeling and the housing remodeling for low-incomes. Second, there have been various types of remodeling activities made in multi-family housing properties in the United States. Size of remodeling project also varied. Their remodeling activities were based on the long-term repairing plans initiated by professional apartment management groups. For making our multi-family housing properties more sustainable, we also need to have the long-term repairing plans. Third, the apartment property remodeling has been regarded as a substitute of reconstruction of apartment properties. However, remodeling should be regarded as one of the most efficient ways to extend the life-cycle of apartment buildings. Thus, benefits and executive plans of apartment remodeling should be studied by a professional research center under our governmental responsibilities as done in the United States.