• Title/Summary/Keyword: mega project

Search Result 101, Processing Time 0.025 seconds

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

Evaluation test of applicability of Compressed Air Foam fire extinguishing system for train fire at rescue station in Subsea tunnel (해저터널 구난역 열차화재시 압축공기포(Compressed Air Foam) 소화설비의 적용성 평가 실험)

  • Park, Byoung-Jik;Shin, Hyun-Jun;Yoo, Yong-Ho;Park, Jin-Ouk;Kim, Hwi-Seong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.413-418
    • /
    • 2016
  • Recently, a mega project such as Korea-China or Korea-Japan undersea tunnel project has been emerged for detail discussion and the interest in undersea tunnel is on the rise. More severe damage by train fire is expected in undersea tunnel comparing to ground tunnel and thus the study on more efficient fire extinguishing system, besides existing disaster prevention design is underway. To that end, a full-scale fire tests using CAF fire extinguishing system which has been developed by modifying traditional foam fire extinguishing system for fire suppression at rescue station in timely manner were conducted over 7 times. The test was conducted after setting the rescue station in virtual tunnel with a car of KTX. As a result of using compressed air foam directly to the fire source, 30 liter of Heptane combustibles was extinguished within 1 minutes. Applicability of compressed air foam to train fire at rescue station in undersea tunnel was has been proven and further study is considered required while changing the nozzle angle and location so as to achieve quick and easy extinguishing goal, making use of the advantage of CAF, as well as to reduce the fire water and chemicals required.

Problems and Suggestions for Improvement Derived from an Analysis of the Work of the Urban & Residence Environment Improvement Project -Focused on the Establishment of Preparation Committee and Association Committee- (도시 및 주거환경정비사업의 업무분석을 통한 문제점과 개선 사항 -조합설립추진위원회와 조합설립 업무를 중심으로-)

  • Ryu, Han-Guk;Son, Bo-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.39-47
    • /
    • 2010
  • The government has routinely made efforts to improve the living environment and infrastructure of less-developed areas through large area urban remodeling projects, which are in themselves attempts to overcome the disadvantages of piecemeal local area development. Such projects are very complex, and various stakeholders are involved. However, the data on such projects has not been well managed, and has not lent itself to being easily adopted to similar projects. In addition, there are numerous fragmented mega-projects that seem to be performed based on "rules of thumb" To address this issue, the work process of many urban and residence project types should be standardized otherwise the participants will be confused to work properly. In particular, typical residents who lack knowledge about building redevelopment, building remodeling, urban environment improvement projects, and the like think that it is difficult to establish the preparation committees and association committees for the projects. Therefore, we examined previous researches related to the urban and building renovation to solve the prescribed present problems. This paper presents the three necessary research performances: first, we analyzed the administrative work process in the related laws; second, we examined the practical work process of the preparation committee and association committee stages; and finally we deduced the problem and presented the required improvements.

Analysis on the Differences of Point of View between Architect and Urban Planner on the Evaluation of International Urban Design Competition (국제설계경기 평가에서 건축가와 도시계획가의 관점차이 분석)

  • Lee, Sangho;Leem, Yountaik;Jeon, Jong Nyoung
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.7
    • /
    • pp.417-431
    • /
    • 2013
  • During the development process of mega-project, individual buildings including skyscrapers are built following the master plan. It is not a difficult thing to see the gap of standpoint between the urban planners and architects on the project. This study aims to analyze the difference between architect and urban planner's point of view in evaluating international design competition works which the internationally distinguished honorable design companies(SOM, Jerde Partnership, Studio Daniel Libeskind, Foster+Partners and Asymptote Architecture) submitted as the ideas of Yongsan International Business District Design. Furthermore, we made an attempt to quantify the weight of each factors of urban design by each group. Architect and urban planner's viewpoint were revealed with seven architects and seven urban planners evaluating the international design competition works through AHP(Analytical Hierarchy Process). AHP structure was made of two step hierarchy in terms of Master Plan and Landmark Tower. Eight evaluation criteria were set up such as the concept, land use, transportation, feasibility of Master Plan and the concept, location, functional efficiency and aesthetic beauty of Landmark Tower. Results show that Architect have different point of view from that of urban planner. While the architect's weight of evaluation criteria is on the Landmark Tower(0.505), urban planner's weight is on Master Plan(0.642). Feasibility, the location of Landmark Tower and land-use are very important evaluation criteria to architect and urban planner in common. Functional efficiency of Landmark Tower is in architect's favour and transportation is in urban planner.

The Sociocultural Codes for Interpreting Racism in Puerto Rico (푸에르토리코의 인종주의를 읽는 세 가지 사회문화적 코드)

  • Lee, Euna
    • Cross-Cultural Studies
    • /
    • v.44
    • /
    • pp.7-28
    • /
    • 2016
  • This study examines the sociocultural background of negritude by delving into Caseríos, Reggaeton, and $Trigue{\tilde{n}}os$, which are interrelated with the racism deeply embedded in Puerto Rican society. These terms have also been discussed in relation to the ideological discourse of racial democracy, which has caused Puerto Rican people to be blind to silenced inequality and hegemonic racial policies. Caseríos, housing projects for the poor urban class, are targeted by the state - sponsored project 'Mano Dura'. Due to the policing, control and surveillance of this anticrime project, Caseríos became perceived even more as residential communities of violence, poverty, and insecurity generally connected to the stigmatization of blackness. Reggaeton emerged as a mega hit genre of transnational Puerto Rican music in the 2000s, which in turn, drew attention to both the afrodiaspora in New York and the urban musical power in the Island. This musical genre serves to highlight the meaningfulness of black heritage in the national cultural identity of Puerto Rico. $Trigue{\tilde{n}}idad$ has recently become a common racial cultural term that embraces a broader racial paradigm of mestizaje. This term can function as an alternative concept of blackness, but it has not yet been transformed into enough cultural politics to resist ongoing racial democracy. The three terms intrinsically address both the uprooted racism and potential methods of challenging it. This paper argues the necessity of stronger and more responsive cultural politics to defy the pervasiveness and invisibility of racial discrimination in Puerto Rico.

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.

The Study for an Improved Methodology of Rail Investment Rating System (철도투자평가체계 개선방안의 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Jin, Hak-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2192-2204
    • /
    • 2011
  • Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.

  • PDF

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - (비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 -)

  • Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.38-46
    • /
    • 2014
  • The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity.

China's 'One Belt and One Road' Initiative and Strategy: Development and Limitations (중국의 '일대일로'(一帶一路) 구상과 전략: 발전과 한계)

  • Heur, Heung-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.7
    • /
    • pp.335-347
    • /
    • 2019
  • China's 'One Belt and One Load' initiative is a mega-infrastructure project that connects China and the Eurasian Economies Area by overland and sea routes. Therefore, if it goes smoothly, It will be a new engine for economic development in China and the world, and It is expected to be a factor that will change the structure of the international economy. Especially, the Eurasian continent is likely to develop into the center of the global economy. But China's 'One Belt and One Load' initiative is not only macro and long-term, but also implies complexity, making it hard to be optimistic about development. China's 'One Belt and One Load' initiative is not only strongly promoted as a long-term national development strategy to be completed by 2049, but also strong economic complementarity between China and 'One Belt and One Load' consecutive countries. And many of the successive countries are expecting 'One Belt and One Load' construction. Therefore, there is no possibility at all. In particular, the possibility of development can not be completely ruled out, given the various policies of 'One Belt and One Load' currently being pursued by China. Even if it doesn't go smoothly, the process alone will have significant economic effects on China and neighboring countries, so it will be meaningful. With the help of information technology.