• Title/Summary/Keyword: maintenance Strategy

Search Result 516, Processing Time 0.031 seconds

Development of the Preventive Maintenance System for an Urban Transit (도시철도 차량을 위한 예방보전시스템 개발)

  • Ha, Seong-Hoon;Chang, Suk-Hwa;Yoo, Woo-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.1
    • /
    • pp.1-7
    • /
    • 2007
  • This paper addresses a the maintenance system based on the concept of RAMS (Reliability, Availability, Maintenance, Safety) for the effective maintenance of the urban transit. A systematic approach for developing a cost-effective maintenance strategy based on the component reliability of the system in question is performed according to the following steps : definition of function, functional failures of the systems, construction of RBD (Reliability Block Diagram), and the calculation of reliability indices. The developed preventive maintenance system generates maintenance plan and repair request based on the analysed RAMS data of components and maintenance experience.

The Linkage Strategies Between Productivity Metrics and Financial Accounting Metrics in TPM and PAC Activities (TPM, PAC 활동에서 생산성지표와 재무회계 지표의 연계방안 전략)

  • Choi, Sungwoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.151-161
    • /
    • 2013
  • This paper proposes a strategic model of linkage between productivity metrics and financial accounting metrics to properly evaluate the financial effect of TPM activities and the business performance. This linkage strategy provides a connection tool for clear communication between factory-level and headquarters that the metrics proposed by this paper ultimately improves a quality of support from the management by receiving the factors required for productivity activities in the practical field. This factor includes such as equipment, raw materials and labors. Here, we propose that chain reaction models using break down structure of productivity metrics and financial metrics enhance the knowledge sharing of KPI (Key Performance Indicator) which generally tend to create oversimplified communication between management in headquarters and employees in the practical fields. The productivity metrics include OEE(Overall Equipment Effectiveness) of TPM (Total Productive Maintenance), OLE (Overall Labor Effectiveness) of PAC(Performance and Analysis and Control) activities, and OYE (Overall Yield Effectiveness) of TMM(Total Material Management) activities. The financial accounting metrics include ROE(Return on Equity), ROA(Return on Asset), and AVR(Added-Value Rate). The suggested chain reaction model selects the financial metrics as initial stage and branch down until final stage of productivity metrics. When demand exceeds supply, an ideal speed rate, the lean OEE strategy can be initially applied to reduce the gap between the demand and supply, then apply variable costing to estimate correct amount of operating profit. In addition, the paper presents a new type of model for linkage between financial accounting metrics including CAPEX(Capital Expenditure), OPEX(Operating Expenditure), EVA(Economic Added Value), DCL(Degree of Combined Leverage), and TPM productivity activities including AM(Autonomous Maintenance), PM(Preventive Maintenance), MP(Maintenance Prevention) and QM(Quality Maintenance). In order to support the evidence of proposed linkage strategy, a case analysis on 52 projects from national TPM contest from 2011 to 2012 is analyzed. The case presents the classification of CAPEX and OPEX activities from TPM, and proposes the correct implementation of financial effect for TPM projects.

Analysis on a Combined Model of Competitive Bidding and Strategic Maintenance Scheduling of Generating Units (발전력의 경쟁적 입찰전략과 전략적 보수계획에 대한 결합모형 연구)

  • Lee, Kwang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.9
    • /
    • pp.392-398
    • /
    • 2006
  • Maintenance scheduling of generating units (MSU) has strategic dimension in an oligopolistic market. Strategic MSU of gencos can affect a market power through capacity withdrawal which is related to bidding strategy in an generation wholesale market. This paper presents a combined framework that models the interrelation between competitive bidding and strategic MSU. The combined game model is represented as some sub-optimization problems of a market operator (MO) and gencos, that should be solved through bi-level optimization scheme. The gradient method with dual variables is also adopted to calculate a Nash Equilibrium (NE) by an iterative update technique in this paper. Illustrative numerical example shows that NE of a supply function equilibrium is obtained properly by using proposed solution technique. The MSU made by MO is compared with that by each genco and that under perfect competition market.

A Study on Employment Strategy Based on Employment Information Filtering (취업정보 필터링 기반 취업전략에 관한 연구)

  • Yoon, Sunhee
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.251-258
    • /
    • 2019
  • This study proposed a system that can improve the employment rate and maintenance employment rate by filtering information related to employment in analyzing big data for students who want to find employment. The subject was a two-year female university, the existing employment strategy participated in the job search with simple information such as school grades and personality. As a result, the maintenance employment rate was relatively low due to the decrease in the satisfaction of students seeking employment and the incompatibility with the post-employment aptitude. In order to solve these problems, we propose a system that determines and filters whether the input data in the process of analyzing big data such as employment-related information to improve employment and maintenance employment rates.

Application of Reliability Centered Maintenance Strategy to Safety Injection System for APR1400

  • Rezk, Osama;Jung, JaeCheon;Lee, YongKwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.1
    • /
    • pp.41-58
    • /
    • 2016
  • Reliability Centered Maintenance (RCM) introduces a systematic method and decision logic tree for utilizing previous operating experience focused on reliability and optimization of maintenance activities. In this paper RCM methodology is applied on safety injection system for APR-1400. Functional Failure Mode Effects and Criticality Analysis (FME&CA) are applied to evaluate the failure modes and the effect on the component, system and plant. Logic Tree Analysis (LTA) is used to determine the optimum maintenance tasks. The results show that increasing the condition based maintenance will reduce component failure and improve reliability and availability of the system. Also the extension of the surveillance test interval of Safety Injection Pumps (SIPs) would lead to an improved pump's availability, eliminate the unnecessary maintenance tasks and this will optimize maintenance activities.

A Case Study on the Information Systems Operations and Maintenance (정보시스템 운영 및 유지보수 업무에 관한 사례 연구)

  • Hwang Kyung Tae;Nam Kichan;Kim Hwasik
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.3
    • /
    • pp.77-87
    • /
    • 2004
  • The importance of information systems(IS) operations and maintenance is increasing as the costs of IS operations and maintenance take larger share of total IS costs and organization's dependency on IS is increasing. However, this area has received relatively little attention from scholars and practitioners despite of its significance. The main objectives of this study are to provide practical guidelines for improving IS operations and maintenance practices, and to propose a research framework for this area. To accomplish this objectives, the following three issues are investigated. First, IS operations and maintenance practices of a case company are analyzed. Second, the current practices are compared with best practices. Finally, suggestions are made based on the analyses to improve the IS operations and maintenance practices.

  • PDF

Performance Analysis of Urban Railway Rolling Stock Condition-based Maintenance Process Redesign Applying Mobile-IoT (모바일 사물인터넷을 적용한 도시철도 차량 상태기반 유지보수 프로세스 재 설계안 성과 분석)

  • Hyun-Soo Han;Kyoung-Soo Seo;Tae-Wook Kang
    • Journal of Information Technology Applications and Management
    • /
    • v.29 no.6
    • /
    • pp.63-80
    • /
    • 2022
  • In this paper, we study structural changes and performance gains in condition-based maintenance process redesign when mobile IoT technology is embedded into urban railway rolling stock. We first develop condition-based maintenance To-Be process model in accordance with the IoT deployment scheme. Secondly, we draw upon theoretical framework of redesign process analysis to develop performance evaluation method suitable to predictive maintenance shift from As-Is ordinary maintenance practice. Subsequently, To-Be process performance evaluations are conducted adopting both the quantitative and qualitative method for time, cost, and dependability dimensions. The results ascertain the considerable benefits captured through detection abnormality prior to actual rolling stock failure occurrence, and details of performance improvements and enhancement of standardization level is revealed. The procedures and results presented in this paper offers useful insights in the fields of IoT economic analysis, condition based maintenance, and business process redesign.

Optimal inspection frequency to mitigate the risk of building system failure

  • Au-Yong, Cheong Peng;Ali, Azlan Shah;Ahmad, Faizah;Chua, Shirley Jin Lin
    • Structural Engineering and Mechanics
    • /
    • v.64 no.3
    • /
    • pp.347-352
    • /
    • 2017
  • The poor maintenance practice increases the possibility of system failure. Subsequently, the consequences of failure fall on the aspects of output, safety and healthy, environmental integrity, system quality, and customer satisfaction. Conditionbased maintenance is seen as a potential strategy to improve performance. Whereby, the key success factor of this maintenance strategy is identified as the system inspection. This study aims to investigate the association between system breakdown rate and frequency of inspection. A mixed method approach is implemented by distributing questionnaire and interviewing for data collection. Subsequently, descriptive analysis, correlation analysis and regression are adopted to analyse the collected data from 100 respondents and the results are validated with interview data of 10 interviewees. The research result establishes significant relationship between the system breakdown rate and the frequency of inspection. Additionally, the result of regression analysis confirms that the frequency of inspection is the significant predictor of system breakdown rate. Planning of accurate inspection frequency is crucial to secure the system performance. Hence, the research signifies the importance to carry out regular inspection towards the building systems and components. As a recommendation, the maintenance personnel should assess the risk criticality of the building systems. Then, continuously monitor the condition of critical building systems; regularly inspect the condition of non-critical building systems and randomly inspect all of them.

A Study on the Efficient Maintenance of Geo-Spatial Information (지형정보의 효율적 유지관리 방안)

  • Lee, Bo-Mi
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.12 no.3
    • /
    • pp.1-12
    • /
    • 2009
  • This study aims to analyze the existing problem of geo-spatial information maintenance and then, show maintenance strategies suitable for new integrated environments. We look for AS-IS which is provider-centered, top-down, and also drive implications from analyzing oversea best practice. For analyzing of geo-spatial maintenance pattern, we polled about 20 local governments and private enterprise to find out AS-IS of geo-spatial information and result in maintenance pattern and component. From this, we suggest 4 kinds of strategies. This study shows the strategy not only which decide the question about the problem of existing geo-spatial maintenance but which find a way of combining and utilizing all geo-spatial information which is 8 criteria basic geographical information. This is a win-win program of all organization which produce, construct, make full use of national geo-spatial information.

  • PDF