• Title/Summary/Keyword: long-term cost

Search Result 994, Processing Time 0.033 seconds

Time Domain Fatigue Analysis on the Upper Rolling Chock of IMO Type B Tank (IMO Type B 탱크 상부 Rolling Chock에 대한 시간영역 피로해석)

  • Park, Myong-Jin;Park, Jun-Seok;Won, Sun-Il;Choi, Byung-Ki;Park, Kweong-Won;Paik, Young-Min;Kim, Yooil
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.5
    • /
    • pp.380-387
    • /
    • 2016
  • Present research target to develop the procedure of long-term fatigue analysis of the structural details near the upper rolling chock of IMO type B tank by using the time domain modal analysis technique where both the contact and friction behavior can be accurately simulated. In order to perform the time domain analysis focused on the contact and friction, the entire model of the hull and tank was condensed with DOF reduction technique, which is obtained by transforming the global finite element model into its quasi-static modal coordinate. Modal analysis using the quasi-static deformation modes is chosen as a cost effective time domain simulation method and this is based on the fact that the structural response of the tank is quasi-static. Based on the developed cost effective time domain simulation method, the long-term fatigue analysis procedure for the structural details near the rolling chock and key of independent type tank is targeted to be established. The developed fatigue assessment procedure takes into account, wave induced stress and both contact and friction induced stress without loss of accuracy.

Infrastructure Asset Management Policy and Strategy Development (사회기반시설물 유지관리를 위한 자산관리체계 도입 전략)

  • Chin, Kyung-Ho;Chae, Myung-Jin;Lee, Giu;Lee, Kyo-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.67-77
    • /
    • 2009
  • Infrastructure asset management can be defined as the long term and cost effective management strategy to meet the required service level. In most developed countries, the major motivations of the introduction of asset management are increment in number of assets, extension of maintenance field, accounting approaches of public facilities, performance-based FM(Facility Management), limitations of public funds and public-private partnership, life cycle cost approach, and the development of information technology. This paper discusses the strategic and stepwise methods of introducing infrastructure asset management. Strategic approaches are suggested to develop the practical methods of condition and value assessment of assets, and long-term capital investment plan for optimized decision making(ODM). Required systematic processes are analyzed in terms of resource and technical limitations and detailed implementation plan for each development phases are suggested.

Reducing of Authentication Signaling Traffic in LTE Networks (LTE 네트워크에서 인증 시그널링의 감소 기법)

  • Kim, Seonho;Jeong, Jongpil
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.1 no.2
    • /
    • pp.109-118
    • /
    • 2012
  • As a result of the prevalence of smartphone, various mobile services became faster by LTE networks. Because many mobile devices are used more wireless services, heavy signaling traffic for authentication could be generated. Authentication is an important factor in wireless networks to identify devices; it is the start of wireless networks. This paper analyzes previous patterns for more effective authentication in accessing of another external networks. We propose a fast authentication scheme for minimizing of signaling cost between the authentication server and external networks. And we calculate the rate of authentication occurrence in LTE networks using mathematical modeling as well as the change of signaling cost for authentication in various network environments. Finally, we calculate the optimized number of authentication data and show the effectiveness for authentication signaling costs.

Caffe Bene: Creating Values for Customers

  • Ahn, Kwangho;Yoo, Changjo;Kim, Youngchan
    • Asia Marketing Journal
    • /
    • v.14 no.3
    • /
    • pp.185-197
    • /
    • 2012
  • Caffe Bene, one of the most notable coffeehouse chain brands in Republic of Korea, gives us some thought-provoking issues in terms of sustainable success. Despite harsh competition among various coffeehouse brands, Caffe Bene has been accomplished astonishing outcomes in domestic market and now ranked 2nd place in sales among the global coffeehouse franchise in 2010 and 2011. These achievements were possible mainly because Caffe Bene adopted distinctive shop design, maintained aggressive marketing strategy, developed new menu, and combined the unique Korean culture with ordinary concept of café to make its place attractive. However, since Korean coffeehouse market is getting saturated and consumers are becoming savvy about coffee, Caffe Bene needs to find a new solution to overcome growth stagnation. Besides, many experts pointed out that irrational increase in the number of stores might hurt its business in the aspect of managing distribution channel and providing consistent services. Also, customers of Caffe Bene have shown that it has to complement its critical weaknesses: inferior coffee taste and relatively high price for a cup of coffee. Especially, some people view that the company is shifting its high rental fee, interior cost and PPL marketing cost to consumers by charging high price for coffee. To get over the problems, Caffe Bene is currently using C/S Consumer Management System though experts are questioning about the efficacy because of the conflict between purpose of the system and the headquarters' plan. Present CEO Kim also announced that the company will complete its logistics system in the latter half of 2012 to provide stores with more high quality coffee beans to improve taste of coffee. Thus, in this case, we describe how Caffe Bene succeeded in Korean market and enumerate its key success factors. Also, we specify the long-term goals of Caffe Bene and introduce the current policies and strategies to show how the company is working on to achieve its ultimate goal. By reading and analyzing this business case, students could get useful insights regarding franchise management and think about issues on competing in a saturated market. Also, it would be worthwhile to generate creative solutions for the problems that Caffe Bene is now facing to broaden the practical perspective.

  • PDF

A Survey of Public Preferences on Repeat Dispensing (장기처방약의 조제방식에 대한 일반인의 선호도 조사: 분할조제 관점에서)

  • Young Mi Lee;Daejin Kim;Eunjoo Lee;Hyun Soon Sohn
    • Korean Journal of Clinical Pharmacy
    • /
    • v.34 no.1
    • /
    • pp.30-38
    • /
    • 2024
  • Background: This study examined the public's perceptions of repeat dispensing as one of the measures to reduce the harmful effects of long-term prescriptions in Korea. Methods: From January 11 to 25, 2021, an online survey was conducted for adults using convenience sampling. A self-developed questionnaire was used. Results: There were 310 respondents, of which 228 (73.5%) preferred repeat dispensing. When considering the additional fee payment, 188 (60.6%) preferred repeat dispensing, and 54 (67.5%) out of a total of 80 chronic disease patients preferred it. It was confirmed that there was a difference in the willingness to repeat dispensing considering the additional cost depending on whether the patient had a chronic disease and the distance from home to the nearest pharmacy. As a result of subgroup analysis for patients with chronic diseases, frequency of outpatient visit, number of prescription days, method of packaging pharmaceuticals, and distance from home to the nearest pharmacy were identified as variables that could well predict the willingness to repeat dispensing considering paying additional fees. The preference for repeat dispensing may vary depending on conditions such as additional cost range, frequency and period of prescription use, disease and patient characteristics, so a careful approach is necessary. Conclusion: It is necessary for the government to consider the introduction of repeat dispensing with interest in the public demand.

A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works (실적공사비에서 전기공사의 적정이윤율 분석에 관한 연구)

  • Seo, S.S.;Jang, Y.G.;Kim, K.G.;Hyun, S.Y.;Wang, Y.P.;An, J.H.;Park, M.Y.;Sohn, H.K.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2129_2131
    • /
    • 2009
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower, if current rate of profit (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works (전기분야 실적공사비 적산제도에서 이윤산정 분석 및 제안)

  • Seo, S.S.;Lim, S.H.;Kwon, Y.M.;Kim, H.G.;Kim, J.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.155-159
    • /
    • 2007
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower if current rate of exceeds (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process (선박건조공정의 미세 통합 일정 관리 체계 구축에 관한 연구)

  • Kim, Yong-Seop;Lee, Dae-Hyung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.44 no.1 s.151
    • /
    • pp.48-54
    • /
    • 2007
  • Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.

The Application of VE Technique for the Economizing Resources (VE기법 활용으로 자원절약)

  • 강성호;임경수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.27-35
    • /
    • 1978
  • Since we have been discussing tile relationship of economizing at this paper. Value engineering (VE), as the term is generally understood, is concerned with reducing the cost of units or equipments which go into production. Until recently, our immediately problems of resources has been a short-term strategy. But due to the shortage of resources, our chief raw materials depend on the importation. In order to cope with such a present problems, first of all the policy of economizing resources by which the loss of materials can be minimized, and resources can be applied to more effectively, should be advanced to all things. Therefore, as the method of policy for the long tel.m for the sake of the use of resources, and as VE technical method can be assured in resonablity, it can be established of permanent organization (VE Team).

  • PDF