A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process  

Kim, Yong-Seop (Hong-Ik University)
Lee, Dae-Hyung (Hong-Ik University)
Publication Information
Journal of the Society of Naval Architects of Korea / v.44, no.1, 2007 , pp. 48-54 More about this Journal
Abstract
Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.
Keywords
IHOP; Scheduling; Dock process;
Citations & Related Records
연도 인용수 순위
  • Reference
1 홍윤기, 정은경, 전진, 김세영, 1997, '조선공정계획에서 탑재순서생성,' 산업공학회 제 10권, 제 1호, pp. 189-207
2 김용태, 2002, Dock 의 자원제약을 고려한 조선탑재 Network 작성, 울산대학교 석사학위논문
3 대한조선학회, 1996, 선박건조공학, 동명사
4 유지성, 2003, 제약만족기법을 이용한 탑재네트워크의 부하평준화, 서울대학교 석사학위논문
5 차희철, 2002, Dock의 자원과 작업환경을 고려한 탑재, 시뮬레이션, 울산대학교 석사학위논문