• 제목/요약/키워드: lifting management

검색결과 138건 처리시간 0.023초

웨이브렛 변환 계수의 특성을 이용한 생체 영상 암호화 알고리즘 (Biometric Image Cryptographic Algorithm Based on the Property of Wavelet Transform Coefficient)

  • 신종홍
    • 디지털산업정보학회논문지
    • /
    • 제12권2호
    • /
    • pp.41-49
    • /
    • 2016
  • Lossless encryption methods are more applicable than lossy encryption methods when marginal distortion is not tolerable. In this research, the author propose a novel lossless symmetric key encryption/decryption technique. In the proposed algorithm, the image is transformed into the frequency domain using the lifting wavelet transform, then the image sub-bands are encrypted in a such way that guarantees a secure, reliable, and an unbreakable form. The encryption involves scattering the distinguishable frequency data in the image using a reversible weighting factor amongst the rest of the frequencies. The algorithm is designed to shuffle and reverse the sign of each frequency in the transformed image before the image frequencies are transformed back to the pixel domain. The results show a total deviation in pixel values between the original and encrypted image. The decryption algorithm reverses the encryption process and restores the image to its original form. The proposed algorithm is evaluated using standard security and statistical methods; results show that the proposed work is resistant to most known attacks and more secure than other algorithms in the cryptography domain.

고구마의 수확 후 관리현황과 개선방안 (Postharvest Procedures on Storage, Management and Utilization of Sweetpotato)

  • 안영섭;정병춘;이준설;정미남;김학신
    • 한국작물학회:학술대회논문집
    • /
    • 한국작물학회 2004년도 추계학술발표회
    • /
    • pp.36-41
    • /
    • 2004
  • Postharvest handling of sweetpotatoes is inevitable procedure for the maintenance, storage, management and utilization of high fresh quality of storage roots. It ranges in degree from simple lifting of roots, carrying them from field to storage house and immediate consumption after cooking, to sophisticated methods of curing, and storage under controlled conditions followed by processing into a high quality food products. Postharvest saleability, quality and nutritional value of roots and the presence or absence in roots of bitter, toxic furanoterpenoid phytoalexins or mycotoxins depends greatly on the degree and types of treatment to which produce is subjected. Climatic and soil conditions before harvest and contamination or attack by microorganisms or insect pests in the field may initiate or enhance subsequent postharvest deterioration. Careless postharvest handling can lead to both quantitative and qualitative losses which may be extremely high in some circumstances. Research has concentrated on the improvement of preharvest conditions to increase yield and lower decrease rates. However, such efforts are wasted unless they go hand in hand with others designed to reduce the high degree of loss associated with careless postharvest handling.

  • PDF

임금근로자의 고용형태에 따른 건강수준의 차이 분석 - 유해위험요인 노출을 경유한 영향 경로 - (Analysis of health inequality by the type of employment on health among employees - Pathway of the effect via the exposure of hazardous factors -)

  • 이경용
    • 대한안전경영과학회지
    • /
    • 제16권2호
    • /
    • pp.81-90
    • /
    • 2014
  • Flexible production system has been expanded to all sectors of economy with the change of labor market and diversification of employment. The unstable employment with irregular work has replaced stable employment with regular work. This study has investigate the impact pathway of the type of employment on health status especially ill-health symptoms experiences. Among the first Korean Working Conditions Survey data, the employee's response data was used to analyze the path way with multiple regression analysis. The result has shown the direct effect of the type of employment on ill-health symptoms experience. Indirect effect of the type of employment was found the pathway via the exposure to noise, high temperature, low temperature, dust, skin contact to chemicals, painful posture, heavy material handling, standing position, repetitive movement of hands. However the exposure to the other hazardous factors such as organic solvent, wholebody vibration, radiation, lifting people, infectious materials were not influenced by the type of employment.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Productivity Analysis of Spray Task in an International Airport

  • Kisi, Krishna P.;Kayastha, Rujan
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.632-639
    • /
    • 2022
  • The objective of this study is to analyze the productivity, efficiency, and factors affecting the productivity of a spray task from an international airport project. The study is focused on the productivity analysis of the Subcontractor whose job was to supply and apply sprayed-applied fire-resistive material (SFRM) on steel members to achieve the necessary fire ratings on the building structures of the Hamad International Airport, Qatar. The study analyzed the productivity of the four sprayer teams who completed the task at three locations and three areas of the airport. The study found that the productivity of the individual team observed during the SFRM spray task was not only different but was also observed different when they worked at varying floor heights where different factors affecting productivity were predominant. The study found that the efficiency was lowest (47.32%) when the spray team had to work at second-floor heights and factors affecting productivity such as limited accessibility for material movement and lifting, site congestion, lack of continuity of operation due to priority areas and frequent re-handling of machines and tools were present. Besides, the factors such as adverse weather conditions and sub-trades interference affected productivity at all locations. The findings show that productivity depends on multiple factors and those factors need to be identified and addressed to improve productivity. The findings also show that the estimated efficiency was hard to achieve but possible since Team 4 had 97% efficiency on the first floor of the airport.

  • PDF

선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안 (Modular Building Construction Process Development by Benchmarking International Best Practices)

  • 신현규;안용한
    • 한국건설관리학회논문집
    • /
    • 제17권6호
    • /
    • pp.3-12
    • /
    • 2016
  • 본 연구의 목적은 모듈러 건축 프로젝트를 수행하는데 발생할 수 있는 위험요인을 도출하고, 해외 선진사례 분석을 통해 도출한 관리요소를 벤치마킹함으로써 국내 적용 가능한 모듈러 건축 시공 프로세스를 제안하는 것이다. 본 연구를 수행하기 위해 해외 대표적인 모듈러 건축 사례인 미국 애틀랜틱 야드 B2 프로젝트를 분석하고 내용분석법을 통해 모듈러 건축 시공 단계에서 발생할 수 있는 위험요인을 도출하였다. 본 연구결과인 모듈러 건축 시공 프로세스를 기반으로 모듈러 건축 설계, 제작 단계부터 시공 단계에 발생되는 위험요인을 고려하여 관리한다면, 시공 과정에서 발생할 수 있는 잠재적인 위험요인을 사전에 방지하고, 시행착오를 줄여 모듈러 건축 시공성도 향상시킬 수 있을 것이다. 또한, 모듈러 건축 프로젝트를 효율적으로 관리함으로써 모듈러 공법의 장점인 공기 단축 및 공사비 절감을 실현하고, 결과적으로 시공품질을 확보하여 모듈러 건축 활성화에 기여할 수 있을 것이다.

건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 - (Development of the procurement system for Just-in-Time Building Construction)

  • 신봉수;김창덕
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.235-244
    • /
    • 2004
  • 도심지의 대형 공사를 그것도 짧은 공기 내에 수행함에 있어 가장 중요한 과제로 부각되는 것은 건설 주요 자원의 효율적인 관리이다. 즉 자재, 인원, 장비 등의 적기적소 조달이 주요 관리 항목이 되고 있다. 또한, 자원의 적기적소 조달을 위한 생산 단계별 생산주체간의 효율적인 정보의 교환은 성공적인 공사 수행에 절대적인 영향을 끼치게 된다. 따라서 이러한 정보를 효율적으로 관리하여 주요 자원을 조달, 운반, 양중, 적치, 설치 각 단계별로 관리할 수 있도록 하는 주요 자원 관리 시스템의 개발이 필수적이다 본 연구에서는 자동차 제조 산업 등 타 산업분야에서 성공적으로 사용된 적시생산의 기본적인 원리와 정보전달기법, 즉 간판시스템의 기본개념을 응용하여 건설프로젝트 자원정보관리시스템을 개발하였다. 또한, 이 시스템을 콘크리트 타설 공사에 적용하였다. 현장의 콘크리트 공사 흐름을 분석한 후, 가치흐름맵핑(VSM)을 통해 정보관리 개선 후 개선모델(FSM)을 제시하고, 이를 실제 초고층주상복합 건물현장의 자원정보관리에 적용하였다. 또한 현장 적용 시 도출된 적용성 등 문제점을 보완하여, 시스템의 추후 사용성을 제고하였다.

한국 노인장기요양시설 및 재가 요양보호사들의 노동환경과 노동조건 개선방안 (The Strategy for Improving Work Environment and Working Conditions among Long-term Health Care Workers in Korea)

  • 손미아;김태운;예상은;황은아;최민서;윤재원
    • 보건행정학회지
    • /
    • 제32권4호
    • /
    • pp.368-379
    • /
    • 2022
  • Background: This study aimed to establish a strategy to improve the poor working environment and working conditions among long-term healthcare workers in Korea. Methods: A total of 600 questionnaires with which long-term health care workers participated in the targeted base areas of each city and province nationwide were distributed directly and 525 responses were collected and 506 responses were analyzed. Surveys, on-site field visits, and in-depth interviews were also conducted to understand the working environment as well as conditions and establish a strategy for improving the working environment among long-term healthcare workers to understand the demands of working conditions and working conditions. Results: Korean long-term care workers firstly and mostly enumerated their risk factors for ill-health when lifting or moving elderly recipients directly by hand (69.9%), followed by increased physical workload with old beds, tools, and facilities (42.3%) in the workplaces, shortage of manpower (32%), and source of infection (30%). To improve the working environment as well as conditions, Korean long-term care workers considered improving low-wage structures, ergonomic improvements to solve excessive physical loads, and increasing various bonus payments as well as implementing the salary system, positive social awareness, and increasing resting time. Of 506 responses, 92.3% replied that the long-term care insurance system for the elderly should be developed to expand publicization at the national level. Conclusion: This study proposes to improve the low-wage structure of Korean long-term care workers, automation and improvement of facilities, equipment, and tools to eliminate excessive physical loads (beneficiary elderly lifting), and reduction of night labor.

개발제한구역관리계획의 환경성 강화방안 연구 - 수도권 개발제한구역관리계획을 대상으로 - (A Study on the Environmental Enhancement of the Development Restricted Zone(DRZ) Management Plan)

  • 성현찬;전성우;이은정
    • 한국환경복원기술학회지
    • /
    • 제23권6호
    • /
    • pp.1-14
    • /
    • 2020
  • Under the 「National Land Planning and Utilization Act」, Development Restriction Zones(DRZ) is one of the designated use district where the Minister of Land, Infrastructure and Transport deems it necessary to control urban development in order to prevent urban sprawl and conurbation and ensure a healthy living environment for citizens by conserving the natural environment surrounding metropolitan cities. DRZ was first designated around the Seoul Metropolitan city in 1971, and had been expanded to the 14 metropolitan areas across the country since 1977. The designated areas were accounted for about 5.4% of the total national land and its importance was demonstrated by contributing to control urban sprawl, curbing real estate speculation, and providing green space to citizens. However, DRZ has been repeatedly relaxed its regulations and allowed development under government. As a result, much of the green areas was damaged and several cities were merged and extended(conurbation). In particular, deregulation implemented for the purpose of securing land as part of national projects and local outstanding business(i.g. constructions of national rental housing, industrial complex, and international stadium) have caused continuous environmental damage around the metropolitan cities. In addition, the habitat fragmentation is in serious situation. Thus, the systematic plans for managing DRZ are necessary, since it is concerned that urban environment become deteriorate in the mid- to long-term. This study aims to continuously protect the urban environment from lifting DRZ. Therefore, firstly, we examined the environmental status through analyzing DRZ Management Plan which shall be drawn up by the Special Metropolitan City Mayor, the Metropolitan City Mayor or the Mayer/Do governor having jurisdiction, every five years to collectively manage DRZ. Secondly, we investigated the actual condition in DRZ based on the case study of Management Plan in Metropolitan areas(i.e. Seoul Metropolis, Gyeonggi-do, and Incheon Metropolis). Finally, we suggested the seven feasible improved political plan for managing DRZ.

초고층 건설공사 시공단계 리스크 요인 도출 및 분석 (Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project)

  • 김수용;김성현;양진국
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.90-98
    • /
    • 2016
  • 고층 건설 프로젝트는 다양한 위험 요인이 있다. 주요 위험 요인은 시간 지연과 비용의 증가 등의 부정적인 결과이다. 따라서, 본 연구는 PROMETHEE 기법을 사용하여 초고층 건설공사 시공 단계에서의 위험 요인을 분석하였다. 이를 위해, 본 연구는 전문가 표적집단면접법(FGI)을 통해 위험 인자를 확인 하였다. 그리고 PROMETHEE는 초고층 건설공사 위험 분석을 위한 설정 평가기준으로 사용 하였다. 다음으로, 평가지표 계산의 기준은 PDRI에서 정의 레벨을 사용하여 구성하였다. 선호지수 및 평가 지표는 설문을 통해 규명되었다. 이러한 과정을 통해, PROMETHEE 기법을 이용하여 본 연구는 초고층 건설공사 시공 리스크의 중요도를 산정하였다. 그 결과, 높은 수준의 위험 요인은 다음과 같이 나타났다. 이것은 '재료 리프팅 운영 계획', '아웃리거 벨트 트러스 건설', '고층 건물의 기초 작업 계획'과 '고층 건물의 구조 개념을 고려'이다.