• Title/Summary/Keyword: life cycle management

Search Result 1,502, Processing Time 0.025 seconds

Calculation Model for Function & Cost Score based on Normalization Method in Design VE (정규화 기법 기반의 설계VE 기능 및 비용 점수 산출 모델)

  • Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.98-106
    • /
    • 2015
  • VE aims at reduction in a budget, improvement of function, structural safety and quality security for public construction projects. However, there is possibility for the structural safety and quality security review to be insufficient because related regulations are mostly composed of analysis on economic efficiency of design. In addition, due to the misconception about VE as a cost saving methodology, an alternative is being presented which still focuses mainly on cost saving, but with no objective evaluation of function related to cost. In order to improve this, the government adopted the reduction of life cycle cost and proposal of value improvement, and let people specify the cost and function of the original plan versus the alternative plan, and the value changes between them. However, it is written mainly into practical convenience rather than theoretical basis since a specific way is not suggested. The current method sets a different starting point by applying the attributional difference of function and cost. Furthermore, an evaluation standard for correlating is an important element in rational decision making for assessing and choosing an alternative. This paper analyzes the process and method of function & cost scoring when performing VE and suggests a mathematical normalization model in order to support rational decision making when selecting an optimum plan.

VRIO Model Based Enterprise Capability Assessment Framework for Plant Project (VRIO 모델 기반의 기업역량평가 프레임워크 제시에 관한 연구 - 플랜트 사업을 중심으로 -)

  • Min, Byeong Su;Min, Jang Hee;Jang, Woosik;Han, Seung-Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.61-70
    • /
    • 2016
  • Construction enterprises have performed various projects such as buildings, infrastructure and plant projects in the international market. Among these, the plant project's amount of orders accounted for about 68.9% of all. However, because of the enterprises won a contract with a low-budget for plant project in the last 10 years, the profit has dropped dramatically. And it is forecasted that there are extreme competition for bid award of plant projects because of the current falling oil prices and raising interest rates. In this circumstance, the comprehending of enterprises strength and weakness must be a priority to get a sustainable competitive advantage. Therefore this research suggests the enterprises's capability assessment framework and it is in order to diagnose the korean construction enterprises capabilities. The framework is based on the VRIO model that is on the basis of resource based theory. First, the capability assessment indices and their importance and priority that based on the life-cycle of plant project is deducted by literature review and survey. Second, the 5 point likert score applied VRIO survey is conducted to diagnose the enterprises and quantified the survey result using the fuzzy theory. Lastly, the competitvie implication and capability assessment are deducted.

A Case Study on Economic Analysis of a Solar Water Heating System and a Ground Source Heat Pump System Applied to a Military Building (군 복지시설의 지열시스템과 태양열시스템 경제성 평가 사례 연구)

  • Lee, Jong-Chan;Park, Young-Ho;Lee, Ghang;Lee, Sang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.111-118
    • /
    • 2009
  • This study is to analyze the performance of SWH(Solar Water Heating) and GSHP(Ground Source Heat Pump) systems by evaluating their energy efficiency and LCC(Life Cycle Cost) as being applied to the OO hall as a selected building in the Army. The OO hall, used as bathrooms, dining rooms, accommodations and offices, has reinforced concrete structure system with three floors above the ground and one underground, and its total floor area is approximately 2,917$m^2$. Two energy simulations are conducted to predict the yearly cooling and heating energy of the selected building: One is for analysis of an air-conditioning energy consumption using the e-Quest program, and another is for two new-renewable energy facilities as a water heating source using the RETScreen. The installed capacity of two new-renewable energy facilities is determined according to the 5% level of total standard construction cost. As a briefly result, SWH system is more energy-effective than GSHP system. Considering the break-even point, it is expected that SWH can take only 3 years 11 months to pay for itself in savings while the investment of GSHP can be recovered in more than 16 years 6 months.

The Effects Of Structured Methods On Object Orientation : A Knowledge Interference Prospective (구조지향 방법론이 객체지향 방법론에 미치는 영향 : 지식간섭의 관점에서)

  • Kim, In-Jai;Jeong, Duke-Hoon
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.859-864
    • /
    • 2002
  • The life cycle of new information technologies is getting shorter, and the technologies are becoming more complex and difficult to understand. The need to better understand adoption of object orientation motivates this paper. Adoption of object orientation should certainly be influenced by prior software process technologies, such as the process-oriented structured methods, because object orientation is considered to be a paradigm shift from conventional software process technologies. This study aims to empirically analyze knowledge interference of the structured methods with object orientation. A two factorial quasi-experimental design is set forth. The period of experience using the structured methods and the period of experience using object orientation are selected as two independent variables, and the perceived ease of use is chosen as one dependent variable. Data are gathered from active members of Data Processing Management Association (DPMA), who have experiences in using both the structured methods and object orientation. The final results empirically show that previous experience using the structured methods negatively influences the perception of using object orientation that is one of critical factors to technology adoption. It is suggested here that a future study dealing with the same research topic in other countries will provide new insights about comparative studies.

A Study on Determinants of High-growth Firms: Focusing on Technology Appraisal Indicators (고성장기업의 결정요인에 관한 연구: 기술평가지표를 중심으로)

  • Kim, Sung-tae;Hong, Jae-bum
    • Journal of Technology Innovation
    • /
    • v.23 no.3
    • /
    • pp.373-396
    • /
    • 2015
  • This study analyzed the determinants of high-growth firms using the technology appraisal data of the Korea Technology Finance Corporation. This study is differentiated from previous studies for three reasons. First, it analyzed the determinants of firms that will grow into high-growth firms in the future, not the characteristics of current high-growth firms. Second, it analyzed high-growth firms by dividing them in two aspects: sales and employment. In other words, they were divided into three types: the case in which a firm achieves high growth in both sales increase and creation of jobs, the case in which a firm achieves high growth in creation of jobs but low growth in sales increase, and the case in which a firm achieves high growth in only sales increase but low growth in creation of jobs. Third, this study applied the technology appraisal indicators of Kibo Technology Rating System(KTRS) by the Korea Technology Finance Corporation as the explanatory variable. As a result of analysis, it was found that a firm achieved high growth in both sales and employment if the position in the technology life cycle was appropriate and the technology readiness level was high. However, it turned out that the management system of technical manpower had conflicting effects on high growth of employment and sales. In other words, a firm that had well managed its technical manpower achieved high growth in terms of employment, but rather showed low growth in terms of sales. This result suggests the inference that firms showing high growth in employment may appear mainly in the high-tech industry where management of technical manpower is important. Accordingly, as a result of adding dummy variables that represent whether or not firms are in the high-tech industry, it was found that the result supported the inference, as firms in the high-tech industry were highly likely to achieve high growth in employment.

A Study on the FIDIC Conditions of Contract for Design, Build and Operate Projects (FIDIC의 DBO 프로젝트용 표준계약조건에 관한 연구)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.46
    • /
    • pp.29-60
    • /
    • 2010
  • The incentive and reasons to publish FIDIC Conditions of Contract for Design, Build and Operate Projects(DBO Form) are manifold. It is partly a response to the increasing need for sophisticated project delivery methods in both the public and private sectors and the already widespread use of the FIDIC Yellow Book with operation and maintenance obligations and partly a response to the challenge to decrease maintenance cost to a minimum by means of a new procurement route. As a result, FIDIC has developed a new model form to meet this market place requirement. On the other hand, FIDIC did not simply adapt the Yellow Book but has developed a new form from it, whilst preserving the style of the already known FIDIC Forms and maintaining the wording where it was not necessary to change it for the purposes of a DBO Form. Moreover DBO Form fills up supposed gaps in other FIDIC Forms and ameliorates the claim management and dispute management framework. FIDIC DBO approach may be shortly summarized as follows. First, DBO Form provides for single project responsibility. Second, DBO Form has the clear objective of ensuring the use of a most reliable and efficient technology at the lowest life-cycle cost. Third, DBO Form is intended to operate as an effective quality increase in the design and construction of projects. Fourth, DBO Form is intended to provide significant benefits with regard to system integration and reduction of risks. Fifth, DBO Form accelerates and enhances completion schedule compliance. Sixth, DBO takes care of all three supporting pillars of sustainability(including economical, environmental and social elements). DBO Form is obviously a good starting point for negotiations and the preparation of calls for tenders, thus saving the parties time and money. However, existing cultural and legal differences, particular local conditions and the particular needs of some branches of the industry may require the form to be adapted according to the particular needs of a project. And Civil law practitioners are strongly recommended to verify carefully the underlying legal concepts and background of each clause of the General Conditions in order to avoid unnecessary and sometimes unnatural changes and amendments being made. Note that when preparing the Particular Conditions ensure that terminology is consistent and that existing inherent concepts should not be ignored.

  • PDF

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

Study on the Development of Process and Data Models for the Maintenance of Rental Apartments (임대아파트 유지관리 시스템 개발을 위한 프로세스 및 데이터 모델 구축에 관한 연구)

  • Jung, Young-Han;Jung, Jae-Young;Lee, Jae-Sung;Cho, Bong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.55-67
    • /
    • 2010
  • The main purpose of this study is to develop a system and data model extracted from the TO-BE process model of rental apartments to promote information exchange based on knowledge obtained through maintenance status analysis. Currently, it is difficult to find examples suggesting a data model through a process analysis of maintenance in rental apartments. Thus, this study intends to suggest a process as well as a data model to promote the development of a maintenance system for rental apartments by using building management knowledge, utilization of standardized tools, and existing FM (Facility Management) techniques to break through limitations in actual application. Ultimately, this study aims to show examples of document-oriented analysis and information technology for middle managers in charge of the maintenance of rental apartments, as well as work analysts developing the maintenance system. In further research beyond this study, complex issues on the maintenance of rental apartments, legal restrictions on customary practices of maintenance activities, effects of the scales of maintenance practices, requirements to perform maintenance activities, evaluation on the status of maintenance, life cycle cost and risks will be investigated.