• 제목/요약/키워드: job shop scheduling

검색결과 141건 처리시간 0.026초

APPLICATION OF CONSTRAINT LOGIC PROGRAMMING TO JOB SEQUENCING

  • Ko, Jesuk;Ku, Jaejung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.617-620
    • /
    • 2000
  • In this paper, we show an application of constraint logic programming to the operation scheduling on machines in a job shop. Constraint logic programming is a new genre of programming technique combining the declarative aspect of logic programming with the efficiency of constraint manipulation and solving mechanisms. Due to the latter feature, combinatorial search problems like scheduling may be resolved efficiently. In this study, the jobs that consist of a set of related operations are supposed to be constrained by precedence and resource availability. We also explore how the constraint solving mechanisms can be defined over a scheduling domain. Thus the scheduling approach presented here has two benefits: the flexibility that can be expected from an artificial intelligence tool by simplifying greatly the problem; and the efficiency that stems from the capability of constraint logic programming to manipulate constraints to prune the search space in an a priori manner.

  • PDF

A Distributed Task Assignment Method and its Performance

  • Kim, Kap-Hwan
    • Management Science and Financial Engineering
    • /
    • 제2권1호
    • /
    • pp.19-51
    • /
    • 1996
  • We suggest a distributed framework for task assignment in the computer-controlled shop floor where each of the resource agents and part agents acts like an independent profit maker. The job allocation problem is formulated as a linear programming problem. The LP formulation is analyzed to provide a rationale for the distributed task assignment procedure. We suggest an auction based negotiation procedure including a price-based bid construction and a price revising mechanism. The performance of the suggested procedure is compared with those of an LP formulation and conventional dispatching procedures by simulation experiments.

  • PDF

Dempster-Shafer Theory를 이용한 스케듈링 휴리스틱선정 지식습득 (Knowledge Acquisition on Scheduling Heuristics Selection Using Dempster-Shafer Theory(DST))

  • Han, Jae-Min;Hwang, In-Soo
    • 지능정보연구
    • /
    • 제1권2호
    • /
    • pp.123-137
    • /
    • 1995
  • Most of solution methods in scheduling attempt to generate good solutions by either developing algorithms or heuristic rules. However, scheduling problems in the real world require considering more factors such as multiple objectives, different combinations of heuristic rules due to problem characteristics. In this respect, the traditional mathematical a, pp.oach showed limited performance so that new a, pp.oaches need to be developed. Expert system is one of them. When an expert system is developed for scheduling one of the most difficult processes faced could be knowledge acquisition on scheduling heuristics. In this paper we propose a method for the acquisition of knowledge on the selection of scheduling heuristics using Dempster-Shafer Theory(DST). We also show the examples in the multi-objectives environment.

  • PDF

아웃소싱 전략을 활용하는 두 단계 흐름생산라인에서 완료시간의 총합을 최소화하는 일정계획문제 (Minimizing Total Completion Times in a Two-machine Flowshop Scheduling with Outsourcing Strategy allowed)

  • 유재욱;이익선
    • 경영과학
    • /
    • 제33권2호
    • /
    • pp.1-10
    • /
    • 2016
  • We treats a job scheduling in a 2-machine flow-shop problem with outsourcing strategy allowed. Jobs in the first machine are processed in-house or outsourced to the other companies. In this paper, all the considered jobs are determined to be in-house processed or outsourced. When a job is outsourced, then the firm should pay an outsourcing cost additionally. We want to minimize the sum of the outsourcing costs and the total completion times of finished jobs. In this paper, some solution properties are characterized, and then some heuristic algorithms and a branch-and-bound solution algorithm are derived. This paper evaluates finally the performance of the proposed algorithms during the numerical tests.

분산관리 시스템을 위한 동적 스케쥴링의 연구 (A Study on the Dynamic Scheduling for Distributed Management Systems)

  • 정남기
    • 대한산업공학회지
    • /
    • 제21권2호
    • /
    • pp.207-216
    • /
    • 1995
  • Constructing a distributed management system has its own advantages in addressing the issue of implementing a quick responsive management system in dynamically changing environment of enterprise. We suggest a basic scheduling methodology applicable to a distributed production management system. A new concept of "flexible schedule" is introduced as a tool to accommodate dynamically changing situations of job shops. Then a search technique (referred to as CSP-CBA search) is presented to obtain such a schedule for the job shop scheduling problem, which is converted into a constraint satisfaction problem(CSP), by using the constraint based analysis(CBA). This approach is tested on more than 100 test problems. The results show that the suggested approach required shorter CPU time and solved more problems in given time than another fixed schedule method.

  • PDF

반도체 FAB 공정의 효율적인 통제를 위한 생산 기준점 산출 알고리듬 (A Milestone Generation Algorithm for Efficient Control of FAB Process in a Semiconductor Factory)

  • 백종관;백준걸;김성식
    • 대한산업공학회지
    • /
    • 제28권4호
    • /
    • pp.415-424
    • /
    • 2002
  • Semiconductor manufacturing has been emerged as a highly competitive but profitable business. Accordingly it becomes very important for semiconductor manufacturing companies to meet customer demands at the right time, in order to keep the leading edge in the world market. However, due-date oriented production is very difficult task because of the complex job flows with highly resource conflicts in fabrication shop called FAB. Due to its cyclic manufacturing feature of products, to be completed, a semiconductor product is processed repeatedly as many times as the number of the product manufacturing cycles in FAB, and FAB processes of individual manufacturing cycles are composed with similar but not identical unit processes. In this paper, we propose a production scheduling and control scheme that is designed specifically for semiconductor scheduling environment (FAB). The proposed scheme consists of three modules: simulation module, cycle due-date estimation module, and dispatching module. The fundamental idea of the scheduler is to introduce the due-date for each cycle of job, with which the complex job flows in FAB can be controlled through a simple scheduling rule such as the minimum slack rule, such that the customer due-dates are maximally satisfied. Through detailed simulation, the performance of a cycle due-date based scheduler has been verified.

Scheduling of Three-Operation Jobs in a Two-Machine Flow Shop with mean flow time measure

  • Ha, Hee-Jin;Sung, Chang-Sup
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2006년도 추계학술대회
    • /
    • pp.138-141
    • /
    • 2006
  • This paper considers a two-machine flow-shop scheduling problem for minimizing mean flow time. Each job has three non-preemptive operations, where the first and third operations must be Processed on the first and second machines, respectively, but the second operation can be processed on either machine. A lower bound based on SPT rule is derived, which is then used to develop a branch-and-bound algorithm. Also, an efficient simple heuristic algorithm is developed to generate a near-optimal schedule. Numerical experiments are performed to evaluate the performances of the proposed branch-and-bound and the heuristic algorithm

  • PDF

퍼지선호관계 순서화 문제와 유전자 알고리즘 기반 해법 (A Sequencing Problem with Fuzzy Preference Relation and its Genetic Algorithm-based Solution)

  • 이건명;손봉기
    • 한국지능시스템학회논문지
    • /
    • 제14권1호
    • /
    • pp.69-74
    • /
    • 2004
  • A sequencing problem is to find an ordered sequence of some entities which maximizes (or minimize) the domain specific objective function. As some typical examples of sequencing problems, there are traveling salesman problem, job shop scheduling, flow shop scheduling, and so on. This paper introduces a new type of sequencing problems, named a sequencing problem with fuzzy preference relation, where a fuzzy preference relation is provided for the evaluation of the quality of sequences. It presents how such a problem can be formulated in terms of objective function. It also proposes a genetic algorithm applicable to such a sequencing problem.

Comparison of Three Evolutionary Algorithms: GA, PSO, and DE

  • Kachitvichyanukul, Voratas
    • Industrial Engineering and Management Systems
    • /
    • 제11권3호
    • /
    • pp.215-223
    • /
    • 2012
  • This paper focuses on three very similar evolutionary algorithms: genetic algorithm (GA), particle swarm optimization (PSO), and differential evolution (DE). While GA is more suitable for discrete optimization, PSO and DE are more natural for continuous optimization. The paper first gives a brief introduction to the three EA techniques to highlight the common computational procedures. The general observations on the similarities and differences among the three algorithms based on computational steps are discussed, contrasting the basic performances of algorithms. Summary of relevant literatures is given on job shop, flexible job shop, vehicle routing, location-allocation, and multimode resource constrained project scheduling problems.

Multiobjective Genetic Algorithm for Scheduling Problems in Manufacturing Systems

  • Gen, Mitsuo;Lin, Lin
    • Industrial Engineering and Management Systems
    • /
    • 제11권4호
    • /
    • pp.310-330
    • /
    • 2012
  • Scheduling is an important tool for a manufacturing system, where it can have a major impact on the productivity of a production process. In manufacturing systems, the purpose of scheduling is to minimize the production time and costs, by assigning a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce the costs. In order to find an optimal solution to manufacturing scheduling problems, it attempts to solve complex combinatorial optimization problems. Unfortunately, most of them fall into the class of NP-hard combinatorial problems. Genetic algorithm (GA) is one of the generic population-based metaheuristic optimization algorithms and the best one for finding a satisfactory solution in an acceptable time for the NP-hard scheduling problems. GA is the most popular type of evolutionary algorithm. In this survey paper, we address firstly multiobjective hybrid GA combined with adaptive fuzzy logic controller which gives fitness assignment mechanism and performance measures for solving multiple objective optimization problems, and four crucial issues in the manufacturing scheduling including a mathematical model, GA-based solution method and case study in flexible job-shop scheduling problem (fJSP), automatic guided vehicle (AGV) dispatching models in flexible manufacturing system (FMS) combined with priority-based GA, recent advanced planning and scheduling (APS) models and integrated systems for manufacturing.